| 1 | Clearing Jungle including uprooting rank, vegetation, grass, brush wood, Trees & sapling of girth upto 30cm measured at a height of 1 mtr above ground level and removal of rubbish upto a distance of 50 mtr outside the periphery of the area cleared. (per sqm) |
| 2 | Earth work in bulk excavation by manual means in trenches for foundations drains pipes, cables etc. not exceeding 1.5 mtrs in width and for shafts, wells, cesspits and the like not exceeding the 10 sq. mtr on plan inculding dressing of sites and ramming of bottoms lift upto 1.5, mtrs including getting out excavated earth and disposal of surplus excavated earth as directed. All kinds of soil 1mtr from cutting edge. |
| 3 | Construction of Muthu Bund compressing of 50% boulders & 50% wood bushes including working in wet conditions. |
| 4 | Silt clearance from canals inclusive of initial lead 50 mtr and 1.5 mtr respectively. A. Dry |
| 5 | Silt clearance from canals inclusive of initial lead 50 mtr and 1.5 mtr respectively. A. wet |
| 6 | Slip Clearance e. In ordinary soils diposal lead upto 50 mtr& lift upto 1.5 mtr. |
| 7 | Slip Clearance of. In soils mixed with moorum/Kankar/shingle/boulders, disposal lead upto 50 mtr and lift upto 1.5 mtr. |
| 8 | Demolishing cement concrete manually / by mechanical means including disposal of material within 50 Mtr lead as per directions of Engineer-in-charge:1:3:6 or richer mix(i/c equivalent design mix) |
| 9 | Demolishing cement concrete manually / by mechanical means including disposal of material within 50 Mtr lead as per directions of Engineer-in-charge:D. 1:4:8 or leaner mix(i/c equivalent design mix) |
| 10 | Dismantling old plaster or skirting, raking out joints and leaning the surface for plaster including disposal of rubbish to the dumping ground with 50 Mtr lead. |
| 11 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering all work upto plinth level with 1:4:8 (1 cement 4 coarse fine sand 8 graded stone aggregate 40mm nominal size) |
| 12 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. all work upto plinth level with 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size). |
| 13 | Cement concrete flooring 1:2:4(1cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry & curing complete, but excluding the cost of nosing steps etc. complete 40mm thick with 20 mm nominal size stone aggregate. |
| 14 | 12mm cement plaster of mix 1:4(1cement : 4 Coarse sand) |
| 15 | Dumping stones excluding cost of stones in horizontal on level. |
| 16 | Supply of stone boulders(nallah)nominal size 225 mm(Stack measurements reduced by 15%) |
| 17 | Centering and shuttering including strutting propping etc. and removal of form for. Foundations, footings, bases of columns etc for mass concrete. |
| 18 | Centering and shuttering including strutting propping etc. and removal of form for. Walls (any thickness), including attached pilasters, buttresses, plinth and string courses etc. |
| 19 | Centering and shuttering including strutting propping etc. and removal of form for. Suspended floors, roofs, landings, balconies and access platforms. |
| 20 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All work upto plinth level (1:2:4) 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 21 | Steel reinforcement for RCC work including straightening, cutting, bending, placing in position & binding all complete above plinth level. Cold twisted bars |
| 22 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape raking out joints & preparing & plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50 meters lead.b. Cement mortar 1:4 (1 Cement : 4 Coarse Sand ) |
| 23 | Engagement of extra labour for restoration work(wherever required) . Mazdoor |
| 24 | weed clearance from canal including extraction of roots |
| 25 | Filling empty cement bags with sand /earth including cost of sewing and strings; excluding the cost of bags and earth/sand. |
| 26 | Unloading/ Placing filled EC bags in positionA. Placing in dry |
| 27 | Unloading/ Placing filled EC bags in position B. Placing in water |
| 28 | Supply of stone dust for filling of E.C bags |
| 29 | Supply of E.C bags |
| 30 | Supply of knitted BA wire crates of size 6.00 x1.50x1.50m (6” x 6” mesh) including cost of BA Wire for binding of crates and carriage upto site of work |
| 31 | Providing & fixing PVC pipes conforming to IS: 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion. a) 75 mm dia |
| 32 | Providing & fixing PVC pipes conforming to IS: 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion. a) 110 mm dia |
| 33 | Dry random rubble masonary without bond stone |
| 34 | Carriage of stones by head load from local nallah to site of work (Extra carriage shall be paid only after verification by the concerned site engineer) AEE. 1st 50 mtr |
| 35 | Carriage of stones by head load from local nallah to site of work (Extra carriage shall be paid only after verification by the concerned site engineer) AEE. Beyond 50 mtr |
| 36 | Carriage of Sand by Mechanical transport and Head Load.c) By Mechanical means. Ist 20km |
| 37 | Carriage of Sand by Mechanical transport and Head Load.c) By Mechanical means. beyond 20km |
| 38 | Carriage of Sand by Mechanical transport and Head Load.c) By Head Load. Ist 50 mtrs |
| 39 | Carriage of Sand aggregate by Mechanical transport and Head load Beyond 50 mtrs |
| 40 | Carriage of stone aggregate by Mechanical transport and Head load By Mechanical means Ist 20 km |
| 41 | Carriage of stone aggregate by Mechanical transport and Head load By Mechanical means beyond 20 KM |
| 42 | Carriage of stone aggregate by Mechanical transport and Head load By Headload Ist 50 mtr |
| 43 | Carriage of stone aggregate by Mechanical transport and Head load Beyond 50 mtr |
| 44 | Disposal of silt/slip by Head Load. a) 1st 50 mtr. |
| 45 | Disposal of silt/slip by Head Load. a) Beyond 50 mtr. Please Enable Macros to View BoQ information |