| 1 | Construction of Fisherman waiting Shed at Mulloorthurai in Painkulam Village Panchayat in Munchirai Panchayat union. |
| 2 | Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete., |
| 3 | Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,l aying,curing etc complete., |
| 4 | Cement concrete 1:2:4 mix usin 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,l aying,curing etc complete., |
| 5 | Refilling the basement with excavated earth other than sand complying the Standard specification |
| 6 | Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications |
| 7 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., Bellow Basement |
| 8 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,Above Basement |
| 9 | Brick work with cement mortar 1:5 mix using country bricks of size 83/4\\"x41/4\\"x2\\" for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete. Bellow Basement |
| 10 | Brick work with cement mortar 1:5 mix using country bricks of size 83/4\\"x41/4\\"x2\\" for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete. Above Basement |
| 11 | Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc. |
| 12 | Reinforced Cement concrete 1:11/2:3 mix using 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., |
| 13 | Plastering with Cement Morter 1:3 mix 10 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc |
| 14 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.. |
| 15 | Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc |
| 16 | Paving the Floor with scratch proof ceramic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete |
| 17 | Distembering two coats oil bound distember over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete ( Inner wall ) |
| 18 | Plastic Emulsion painting two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete ( outer wall ) |
| 19 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} Please Enable Macros to View BoQ information |