|
| 1 | Dismantling brick work tile, masonry or tile liningEarthwork in excavation in foundation strenches etc. in all kinds of soilwherePick-Jumper workis not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonryin 15 cm, layers with compaction including disposal of all surplussoil asdirected with in lead of 30 metres. |
| 2 | Cement concrete 1:5:10 With stone aggregate 40mm gauge |
| 3 | Reinforced cement concrete M-30 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering infoundation and plinth |
| 4 | First class burnt brick laid in cement sand mortar 1:6 in foundation and plinth |
| 5 | Damp proof course 4cm thick of cement concrete 1:2:4 with 2 coats of bitumen 20/30 penetration at 1.65 Kgper sq m laid hot and sanded |
| 6 | First class burnt brick work laid in cement sand mortar 1:6 in first storey upto 4 metres above plinth level |
| 7 | Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) |
| 8 | Centering and shuttering for columns (Square or rectangular or poly gonal in plain) |
| 9 | Centering and shuttering for sides and soffits of beam, beams, launching girders, bressumers, lintels |
| 10 | Reinforced cement concrete M-30 mechanically batchmixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in superstructure |
| 11 | Cold twisted detormed (Ribbed/ Tor steel) Bars (Fe500 grade as per IS1786-2008) ,forR.C. works, where not including in the completerate of RCC including bending and binding placing in position complete |
| 12 | Plastering on under side of ceiling10mm thick cement plaster 1:4 |
| 13 | 20mm thick cement plaster 1:5 in two coat work |
| 14 | 12.5 mm thick cement plaster 1:4 outside |
| 15 | Water proofing treatment of Roof Slab with High performance cementitious two component product, consisting of a powder component and an acrylic polymer using two coats ( Dr Fixit Roofseal flex-PackagingSize:12 .5kg(7.5kg powder + 5 kg polymer) / equivalent water proofing Solution ). The slurry thus formed by mixing the two, is tobeappliedonnewroofs to forms a seamless, highly elastic, non-toxic waterproofing layer on the roof with a life expectancy of 7 years. The works hall be carried out all complete as per specification and the direction of the Engineer-in-charge. |
| 16 | Terracing consiting of tiles 22.86x11.43x3.83cmlaid over 25 mm mud plaster 7.5 cm mud filling on another layer of 25mm mud plaster including two coats of bitumen laid hot at 1.65 Kg. /Sqm top of R.C.C. slab including grouting with cement sand mortar 1:4 and top surface to be left clean after wire brushing |
| 17 | Providingandfixing 110mmdia.U.P.V.CRain water pipe of 2.5 kgf./sqm as per IS:4985 including jointing duringmasonary complete as per specifications and to the entire satisfaction of Engineer-in-charge.(If fixedonwall faceclampto be paid separatly as per respective item) |
| 18 | Providing and fixing110 mm dia.U.P.V.C bendfor Rainwater pipe as per IS:14735 including jointing complete as per specifications and to the entire satisfaction of Engineer- in- charge. |
| 19 | Top Khurra 0.6mx0.6m for rain water pipe in 25mm thick cement concrete 1:2:4 over 50.00 thick cement concrete 1:8:16 |
| 20 | Base course of floor consistingof 100mm thick cement concrete 1:8:16 and 100mm sand filling using mechanical mixer for mixing of material |
| 21 | Kota stone slab 20-25mm thick flooring over 20mm (average) thick base laidover and jointed with grey cement slurry mixed with pigment to match the shadeof the slab including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse sand) : |
| 22 | Add for Electrical & PHE Work (item as per CSR 2020) |
| 23 | Approach Road to QuartersEarthwork in excavation in foundation strenches etc. in all kinds of soilwherePick-Jumper workis not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonryin 15 cm, layers with compaction including disposal of all surplussoil asdirected with in lead of 30 metres. |
| 24 | Cement concrete 1:5:10 With stone aggregate 40mm gauge |
| 25 | First class burnt brick laid in cement sand mortar 1:6 in foundation and plinth |
| 26 | Earth work embakment in 9\\" layers complete |
| 27 | Providing and laying cement concrete 1:8:16 with stone aggregates |
| 28 | Providingand laying 60mm thick factory made cement concrete interlocking paver block of M-35 grade machine made rubber moulded smooth finish with strong vibratory processor with vibro hydraulic compaction machine and of approved sizeand design/shape laid in Ordinary Grey and pattern over and including 40 mm thick compacted bed of coarse sand, filling the joints with fine sand etc ,all complete as per directions of Engineer-in-Charge for Non traffic Area sandstreetshavingwidthlessthan 3.05mt.(Also not to used over foot oaths) |
| 29 | Removing of malba from site |
| 30 | Cleaning of jungle manually including uprooting complete Surface dressing of ground including removing rank vegetation and inequalitie exceeding 15cm deep and disposal of rubbish, lead upto 50 man dlift upto 1.5 m in all kinds of soil. |
| 31 | Scraping of cement plaster complete |
| 32 | 20 mm thick cement plaster 1:4 two coat work |
| 33 | 12.5 mm thick cement plaster 1:5 on walls |
| 34 | Removing Doors and windows ( steel or wood )with chowkhats by making recesses in wall is not to be dismantledDoors of area 3 sqm and below |
| 35 | Windows of area 3sqm and below |
| 36 | Supplying and fixing of Japani sheet frames (Chowkat) consisting of 18 gauge (1.25mm) thick steel sheet of the specified section (standard design latest), including iron lugs (hold fasts) iron hinges conforming to PWD specifications including bolts for fixing steps, lock notch provision for receiving tower bolts and finished, fixed in position including the cost of cement concrete 1:3:6 for filling in the frame and cement concrete 1:2:4 for lugs complete to the satisfaction of Engineer-in-charge. Doors and windows frame of size 151mm x 60mm with 35 mm wide double rebate weighing 3.95 kg per meter. |
| 37 | Doors and windows frame of size 113mm x 60mm with 35 mm wide single rebate |
| 38 | Providing and fixing Red meranti Normal (15 to 16 kg per cft. Approx.) doors shutter windows shutter including hinges, screw and cords etc. Complete fixed in position 35mm thick |
| 39 | Wire Gauge Cheetah Champ (Assam) wood door shutter without springs housed in chowkats. 35 mm thick |
| 40 | Factory manufactured flush door fixed in position iron hinges, etc (excluding the cost of any fittings other than specified above but including labour for fixing the same in position Commercial with elm or gurjan facing on both \ Sides with laminated core and lipped edges 35mm thick |
| 41 | Providing and fixing commercial plywood 18mm thick |
| 42 | Dismantling cement conglomerate floors 25mm to 50mm thick without concrete base |
| 43 | Conglomerate floor 50mm thick cement concrete topping 1:2:4 using mechanical mixer for mixing of material |
| 44 | Preparation of plywood surface for painting including sand papering the surface and applying filling with approved quality fillers consisting of white lead, linseed oil, Varnish, and Chalk Mitti including finishing the surface to required finish complete. |
| 45 | Preparation of plastered or concrete surface for painting (including sand papering the surface) using ready mixed cement based wall putty by applying two or more coats to get required finish |
| 46 | Distempering with Acrylic washable oil bound distemper (of approved manufacture) two or more coats over one priming coat to give an even shade |
| 47 | Finishing walls with exterior decorative cement based paint such as snowcem, robbiacem etc. two or more coats to give an even shade |
| 48 | Painting two or more coats excluding priming coat with synthetic enamel paint in all shades on wood work, metallic or plastered, concrete surface to give an even shadeApplying pink primer or aluminum priming coat on wood work including preparation of surface knotting and stopping etc. |
| 49 | Painting two or more coats excluding priming coat with synthetic enamel paint in all shades on wood work, metallic or plastered, concrete surface to give an even shade |
| 50 | Add repair work for Publick Health Work (Item As per CSR 2020) Please Enable Macros to View BoQ information |