| 1 | SH:- Formation Cutting |
| 2 | Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres) |
| 3 | Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres ) |
| 4 | (SH:- MRF Building) |
| 5 | Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m. |
| 6 | Providing and laying cement concrete 1 : 2 : 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) excluding the cost of centring and shuttering in :a) Foundations and plinth |
| 7 | Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete. |
| 8 | Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in :A) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size) |
| 9 | Reinforcement cement concrete work in columns, pillars, piers, abutments, post and struts etc up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but exluding cost of centring, shuttering and reinforcement.a)M20 (1 cement: 1.5 coarse sand : 3 stone aggregate 20 mm nominal size) |
| 10 | Reinforced cement concrete work in lintels, beams and bresumers up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but excluding cost of centering, shuttering and reinforcement.A) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size) |
| 11 | Centring and shuttering including strutting, propping etc and removal of form work for :a) Foundation, footings, bases of columns etc. and mass concrete |
| 12 | e) Column, pillars, posts and struts etc |
| 13 | d) Lintels, beams, girders, bressumers and cantilevers etc. |
| 14 | Reinforcement of RCC work including bending, binding and placing in position complete: b) Tar/TMT steel |
| 15 | Providing and laying Autoclaved Aerated Concrete (ACC) blocks masonry 100 mm/ 125 mm thick Grade-1 AAC blocks of density 551 to 650 Kg/Cum Conforming to IS:2185 (part-3) in super structure above plinth level up to floor V level in cement Mortar 1:4 (1 Cement : 4 Coarse Sand). The Rate Includes providing & Placing in position 2 Nos 6 mm Dia MS Bars at every third Course of Masonary Work. |
| 16 | Extra for half brick masonry in superstructure above plinth level and up to floor two level. |
| 17 | Providing approved best available local wood (Class - B II) work in frames of doors, windows clerestory windows and other frames, wrought framed and fixed in position. |
| 18 | Providing and fixing flush door shutters, decorative type, core of black board construction with frame of 1st class hard wood and well matched 1st class teak ply veneering with vertical grains or cross bands and face veneers on both faces of shutters.a) 40 mm thick including anodized aluminum butt hinges with necessary screws. |
| 19 | Providing and fixing factory made ISI marked steel glazed doors, windows and ventilators, side /top /centre hung, with beading and all members such as F7D,F4B, K11 B and K12 B etc. complete of standard rolled steel sections, joints mitred and flash butt welded and sash bars tenoned and riveted, including providing and fixing of hinges, pivots, including priming coat of approved steel primer, but excluding the cost of other fittings, complete all as per approved design, (sectional weight of only steel members shall be measured for payment).a) Fixing with 15x3 mm lugs 10 cm long embedded in cement concrete block 15x10x10 cm of C.C. 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 20 | Providing and fixing MS grills of required pattern in wooden frames of windows etc with MS flat, square or round bars with round headed bolts and nuts or by screwsA)Plain Grill |
| 21 | Providing and fixing MS sliding door bolts, bright finished or and black enamelled with nuts and screws etc complete.a) 300 X 16 mm |
| 22 | Providing and fixing MS tower bolts (barrel type) with necessary screws etc complete.a) Tower bolt 250 X 10 mm |
| 23 | b) Tower bolt 150 X 10 mm |
| 24 | Providing and fixing MS handles with necessary screws etc complete.[125mm] |
| 25 | Chequered terrazzo tiles 22 mm thick with marble chips of sizes upto 6mm in floors on 25 mm thick bed mortar 1 : 3 (1 cement : 3 coarse sand) jointed with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing complete:(a) Light shades using white cement |
| 26 | Providing and laying Vitrified tiles in floor in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid on 20 mm thick cement mortar 1:4 (1 cement: 4 coarse sand) jointing with grey cement slurry @3.3 kg/sqm including grouting the joints with white cement and matching pigments etc. The tiles must be cut with the zero chipping diamond cutter only . Laying of tiles will be done with the notch trowel, plier, wedge, clips of required thickness, leveling system and rubber mallet for placing the tiles gently and easily.(a) Glazed Vitrified tiles of Matt/Antiskid finish of size Size of Tile 600 x 600 mm. |
| 27 | Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, in skirting, riser of steps, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), including grouting the joint with white ement & matching pigments etc. complete. a) Size of Tile 600x600 mm |
| 28 | Cement concrete flooring 1 : 2 : 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) finished with a floating coat of neat cement.a) 75 mm thick |
| 29 | Providing best available local wood (Class - B II) work in frames of false ceiling, partitions and trusses etc, sawn and put up in position |
| 30 | Providing and fixing 3 mm thick hard board sheet ceiling of approved quality with necessary nails etc. complete (frame work to be paid separately). |
| 31 | Providing and fixing plain, square edged wooden beading 38 mm x 12 mm section with screws of approved quality for ceiling.a) Best local approved quality wood |
| 32 | Providing and fixing Durashine zinc-Aluminium alloy coated (TATA Bluescope building product) sheet of thickness 0.45 mm thickness roofing fixed with necessary fasteners and lapping method as described by the manufacturer inclusive of cutting hoisting and fixing complete, excluding the cost of purlins, rafters and trusses. Details of cost for 179.655 Sq.m.Laying and fixing 20 sheets in 3 row require Overall Sheet area of 20 x 3 x 3.05 x 1.072 plus 3% wastages = 202.061 Sqm After H & L laping as per manufacturer's specification, effective Area Measurable will be 20 x 3x 2.95 x 1.015 = 179.655 Sqm |
| 33 | Providing and fixing Durashine zinc-Aluminium alloy coated (TATA Bluescope building product) sheet ridges fixed with necessary fasteners and lapping method as described by the manufacturer inclusive of cutting hoisting and fixing complete, excluding the cost of purlins, rafters and trusses. Details of cost for 11.75m Laying and fixing 4 lenths of 3.05m each require Overall length of 4 x 3.05 plus 3% wastages = 12.566m After laping as per manufacturer's specification, effective Measurable length will be (4 x 3.05) - (3 x 0.15) = 11.75m |
| 34 | Steel work in built up tubular trusses including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer welded and bolted including special shaped washers etc complete (welding to be paid separately). |
| 35 | 12 mm cement plaster 1 : 4 (1 cement : 4 fine sand). |
| 36 | Painting two coats with oil type wood preservative of approved brand and manufacture on new work |
| 37 | Applying priming coat with ready mixed primer of approved brand and manufacture on steel work. |
| 38 | Applying priming coat with ready mixed pink primer of approved brand and manufacture on wood work complete. |
| 39 | Painting two or more coats with synthetic enamel paint of approved brand and manufacture in black or chocolate shade on new work over and including an under coat of suitable shade with ordinary paint of approved quality to give an even shade. |
| 40 | Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete. |
| 41 | Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface. |
| 42 | Finishing walls with Acrylic Smooth exterior paint of required shade :(a) New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including primingcoat of exterior primer applied @ 2.20 kg/10 sqm) |
| 43 | Making plinth protection 50 mm thick of cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 stone aggregate using 20 mm nominal size) over 75 mm bed of stone ballast 40 mm nominal size well rammed and consolidated and grouted with fine sand including finsihing the top smooth. |
| 44 | Construction of cement concrete drain 15 cm wide and 15 cm deep in cement concrete 1 : 3 : 6 (1 cement : 3 sand : 6 hard graded stone chips or shingle 40 mm and down gauge) 8 cm thick on sides and bottom and plastering and all exposed surfaces with 12 mm thick cement mortar 1 : 3 (1 cement : 3 coarse sand) including shuttering complete. |
| 45 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. Internal work - Exposed on walla) 20 mm nominal outer dia Pipes |
| 46 | b) 25 mm nominal outer dia Pipes |
| 47 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External worka) 20 mm nominal bore |
| 48 | b) 25 mm nominal bore |
| 49 | c) 32 mm nominal bore |
| 50 | Providing and fixing brass bib cock of approved quality.a) 15 mm nominal bore |
| 51 | Providing and fixing brass stop cock of approved quality.a) 15 mm nominal bore |
| 52 | Providing and fixing brass full way valve with wheel of approved qualitya) 32 mm nominal bore |
| 53 | Providing and fixing CP brass towel rail complete with CP brass brackets fixed to wooden cleadt with CP brass screws (heavy quality).a) 750 x 20 mm size |
| 54 | Providing and fixing toilet paper holder.a) CP Brass |
| 55 | Providing and fixing water closet squatting pan (Indian type W.C. pan ) with 100 mm sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever requireda) White Vitreous china Orissa pattern W.C. pan of size 580x440 mm with integral type foot rests |
| 56 | Providing and fixing white vitreous china wash basin with RS or CI brackets painted white 15 mm CP brass pillar taps and CP brass chain with rubber plug 32 mm CP brass waste of standard pattern, 32 mm dia CP brass trap and MI unions complete, including cutting and making good the walls where required.a) Flat back wash basin size 550x400 mm with a pair of 15 mm CP brass pillar taps of heavy quality. |
| 57 | Providing and fixing CP Brass 32mm size Bottle Trap of approved quality & make and as per the direction of Engineer-in-charge. |
| 58 | Providing and fixing sand cast iron/ cast iron (spun) soil, waste and vent pipes.a) 100 mm dia |
| 59 | Providing and fixing sand cast iron heel rest sanitary bend.a) 100 mm dia |
| 60 | Providing and fixing sand cast iron single equal plain junction of required degree with access door, insertion rubber washer 3 mm thick, bolts and nuts complete.a) 100 x 100 x 100 mm |
| 61 | Providing and fixing white vitreous china flat back or wall corner type lipped front urinal basin of 430x260x350 mm and 340x430x265 mm sizes respectively with CI automatic flushing cistern with fittings, RS or CI brackets standard size galvanized steel flush pipe and spreaders with brass unions and GI clamps complete including painting of cistern and fittings, cutting and making good the walls and floors where required.a) One urinal basin with 5 Litres CI automatic flushing cistern |
| 62 | Add Internal Electrification |
| 63 | Add External Serive Connection |
| 64 | Add for Carriage of Materials |
| 65 | Sub-Head :- Boundary walls |
| 66 | SH: EARTH WORK |
| 67 | Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m. |
| 68 | SH: CONCRETE WORK |
| 69 | Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. |
| 70 | Providing and laying cement concrete 1 : 3 : 6 (1 cement : 2 coarse sand : 4 stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering in :a) Foundations and plinth |
| 71 | SH: RCC WORK |
| 72 | Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in :a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size) |
| 73 | Reinforcement cement concrete work in columns, pillars,post and struts etc up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but exluding cost of centring, shuttering and reinforcement.a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size) |
| 74 | Reinforced cement concrete work in lintels, beams and bresumers up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but excluding cost of centering, shuttering and reinforcement.a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size) |
| 75 | Centring and shuttering including strutting, propping etc and removal of form work for :a) Foundation, footings, bases of columns etc. and mass concrete. |
| 76 | b) Column, pillars, posts and struts etc. |
| 77 | c) Lintels, beams, girders, bressumers and cantilevers etc |
| 78 | Reinforcement of RCC work including bending, binding and placing in position complete.a) Tar/ TMT steel |
| 79 | SH: BRICK WORK |
| 80 | Half brick masonry (with best available local bricks) in cement mortar 1:4 (1 cement : 4 coarse sand) in foundation and plinth. |
| 81 | Extra for half brick masonry in superstructure above plinth level and up to floor two level. |
| 82 | SH: WOOD WORK |
| 83 | Providing and fixing MS grills of required pattern in wooden frames of windows etc with MS flat, square or round bars with round headed bolts and nuts or by screws.a) Plain grill. |
| 84 | SH: FINISHING |
| 85 | 12 mm cement plaster 1 : 4 (1 cement : 4 fine sand). |
| 86 | Colour washing such as green, blue or buff on new work (two or more coats) including a base coat of white washing with lime to give an even shade. |
| 87 | SH: CARRIAGE OF MATERIALS |
| 88 | Carriage of materials by mechanical transport including loading, unloading from the nearest source to site of work. |
| 89 | Sub-Head :- M.S Gate. |
| 90 | Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m. |
| 91 | Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. |
| 92 | Centring and shuttering including strutting proping etc. and removal of form work for:a) Foundations and plinth. |
| 93 | b) Columns, pillars and piers. |
| 94 | Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in :a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size) |
| 95 | Reinforcement cement concrete work in columns, pillars,post and struts etc up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but exluding cost of centring, shuttering and reinforcement.a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size) |
| 96 | Providing and laying up to floor two level RCC string courses, coping bed plates, anchor blocks, plain window sills and the like including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface including centering and shuttering etc but excluding cost of reinforcement with M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size). |
| 97 | Reinforcement of RCC work including bending, binding and placing in position complete.b) Cold twisted bars. |
| 98 | Brick work with best available local bricks in foundations and plinth in cement mortar 1:4 (1 cement : 4 fine sand). |
| 99 | Extra for brick work with best available local bricks in superstructure above plinth level up to floor two level. |
| 100 | Steel work in M.S.Gate including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer welded and bolted including special shaped washers etc complete (welding to be paid separately). |
| 101 | 12 mm cement plaster 1 : 4 (1 cement : 4 fine sand). |
| 102 | Distempering (two or more coats) with oil bound washable distemper of approved brand and manufacture and of required shade on new work over and including a priming coat with distemper primer of approved brand and manufacture to give an even shade. |
| 103 | Painting two or more coats (excluding priming coat) with superior ready mixed paint for steel work of approved brand and manufacture in all shades on new work to give an even shade. |
| 104 | Add cartage of materials by mechanical transport including loading, unloading etc complete from source to work site. |
| 105 | Sub-Head :-Leachate Tank |
| 106 | Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m. |
| 107 | Providing and laying in foundations and plinth cement concrete 1 : 5 : 10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering |
| 108 | Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in :a) 1 : 1.5 : 3 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size). |
| 109 | Reinforced cement concrete in walls (any thickness) including attached pillasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring, shuttering and reinforcement in :a) 1 : 1.5 : 3 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size) |
| 110 | Reinforced cement concrete in suspended floors, roofs, landings and balconies upto floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but excluding cost of centring and shuttering and reinforcement with 1 : 2 : 4 (1 cement : 2 coarse sand : 4 stone aggregate 20 mm nominal size). |
| 111 | Centring and shuttering including strutting, propping etc and removal of form work for :a)Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. |
| 112 | b)Suspended floors, roofs, landings shelves and their supports, balconies and chajjas (3.5 m height). |
| 113 | Reinforcement of RCC work including bending, binding and placing in position complete.a) Cold twisted bars. |
| 114 | 12 mm cement plaster 1 : 4 (1 cement : 4 fine sand). |
| 115 | Neat cement punning. |
| 116 | Add Carrige charge |
| 117 | SH:- SEPTIC TANK |
| 118 | Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m.a) Ordinary Soil |
| 119 | Re-filling excavated earth in foundations and plinth etc. in 15 cm layer including ramming and watering etc. complete. |
| 120 | Providing and laying in foundations and plinth cement concrete 1 : 5 : 10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering |
| 121 | Reinforced cement concrete in suspended floors, roofs, landings and balconies upto floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but excluding cost of centring and shuttering and reinforcement with 1 : 2 : 4 (1 cement : 2 coarse sand : 4 stone aggregate 20 mm nominal size).in M20 1:1.5:3 (1 cement :1.5 coarse Sand :3 Stone Aggregate 20 mm nominal size) |
| 122 | Centering and shuttering including strutting, propping etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform. with water proof ply 12mm thick. |
| 123 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.Thermo-Mechanically Treated bars. |
| 124 | Brick work with best available local bricks in foundations and plinth in cement mortar 1:6 (1 cement : 6 fine sand). |
| 125 | 62 mm thick cement concrete flooring with concrete hardener topping under layer 50 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) and top layer 12mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate 6mm nominal size) by volume. Hardening compound is mixed @ 2 litre per 50kg of cement or as per manufactures specifications. This includes cost of cement slurry, but excluding the cost of nosing of steps etc. complete. |
| 126 | 12 mm cement plaster finished with a floating coat of neat cement of mix 1:4 (1 cement: 4 fine sand) |
| 127 | Providing and fixing in position pre-cast R.C.C. manhole cover and frame of required shape and approved qualityRectangular shape 600x450 mm internal dimensions |
| 128 | Providing orange colour safety foot rest of minimum 6 mm thick plastic encapsulated as per IS : 10910 on 12mm dia steel bar conforming to IS : 1786 having minimum cross section as 23 mmx25mm and over all minimum length 263 mm and width as 165mm with minimum 112 mm space between protruded legs having 2 mm tread on top surface by ribbing or chequering besides necessary and adequate anchoring projections on tail length on 138 mm as per standard drawing and suitable to with stand the bend test and chemical resistance test as per specifications and having manufacture’s permanent identification mark to be visible even after fixing, including fixing in manholes with 30x20x15 cm cement concrete block 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) complete as per design. |
| 129 | Providing and fixing soil, waste and vent pipes100 mm dia. |
| 130 | Providing laying and jointing glazed stone ware pipe grade 'A' with stiff mixture of cement mortar in the proportion of 1:1 (1 cement : 1 fine sand) including testing of joints etc. complete.a) 100 mm dia SW pipes |
| 131 | Providing and laying cement concrete 1 : 5 : 10 (1 cement : 5 lime sand : 10 graded stone aggregate 40 mm nominal size) all around SW Pipe including bed concrete 15 cm thick as per standard design. a) 100 mm dia SW pipes |
| 132 | Making soak pit 2.50 m dia 3 m deep with 45 x 45 cm dry brick honeycomb shaft and SW drain pipe 100 mmdia 1.80 m long complete as per standard |
| 133 | Carring charges for building materials by mechanical means |
| 134 | (SH-Recarpeting) |
| 135 | Interlocking Paver Block Cost of 1.00 Mtr |
| 136 | Granular Sub-Base with Close Graded Material ( Table:- 400- 1) Plant Mix Method (Construction of granular sub-base by providing closed graded material, mixing in mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401).(A)for grading- I Material |
| 137 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)Ordinary soilManual Means (Depth upto 3 m) |
| 138 | PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) |
| 139 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specificationsPCC Grade M15 |
| 140 | Providing and laying 60mm thick faciory made cement concreteinterlocking paver block of M -30 grade made by block makingmachine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with line sandetc. all complete as per the direction of Engineer-in-charge. |
| 141 | Add Cartage of Materials at site of works Please Enable Macros to View BoQ information |