Tender For Job Name: Supply Of Full Charge Of Catalyst For Two Stage Hydrocracker Unit At Nrl Site, Numaligarh Tender No: Bidder Name: Schedule Of Prices Sl No Name Of Catalyst/ Absorbent/ Adsorbent , Chemical Qty Of Catalyst/ Adsorbent/ Absorbent [In Kg], Numaligarh-Assam
TDR : 54357539
Tender Notice
BOQ
19 Days Left
Numaligarh
Assam
Tender For Job Name: Supply Of Full Charge Of Catalyst For Two Stage Hydrocracker Unit At Nrl Site, Numaligarh Tender No: Bidder Name: Schedule Of Prices Sl No Name Of Catalyst/ Absorbent/ Adsorbent , Chemical Qty Of Catalyst/ Adsorbent/ Absorbent [In Kg]
Job Name: SUPPLY OF FULL CHARGE OF CATALYST FOR TWO STAGE HYDROCRACKER UNIT AT NRL SITE, NUMALIGARH Tender No: PUR-1011852/BHA Bidder Name: Schedule of Prices SlNo Name of Catalyst/ Absorbent/ Adsorbent , Chemical Qty of Catalyst/ Adsorbent/ Absorbent [in Kg] Base(InKg) Metals SubTotal (col3+col4B) 5% handling/contingency losses[col 5)x 0.05] (In Kg) Total includinghandling loss(Col5+Col 6)(In Kg) Total Qty rounded off tothe next higherBarrel/ Drum/ Bag Sizeincludinghandling/contin gency losses(In Kg) Total base in thequantity indicated incolumn 8 (In Kg) Total metal in the quantityindicated in column 8(in Kg) Mention Currency (USD/GBP/JPY/EUR/INR) Unit Rate of BaseCatalyst/ Adsorbent/Absorbent (per Kg) on FOB Cost ofBaseCatalyst on FOB basis (Col 9 x Col 12) Ocean Freight upto Kolkata Sea Port (Lump-sum) Transit Insurance upto CIF Kolkata (Lump-sum) Unit Rate of BaseCatalyst/ Adsorbent/Absorbent on CIF Kolkata basis (per Kg) (Col12+Col14+Col15) Cost ofBaseCatalyst on CIF Kolkata basis (Col 9 x Col 15) HSN Code
2
2.0 Name Quantity (In Kg) Catalysts/ Absorbents/ Adsorbents/ Chemicals
3
Notes: 1. Licensor may add/delete the rows for nos. of Catalyst and Proprietary Adsorbents/ Absorbents/ Chemicals as per applicability in their technology. 2. The rates/ prices quoted for all Catalyst /Chemicals/ Adsorbents/ Absorbents shall remain firm till Bid Validity. 3. Delivery schedule shall be firm and valid till completion of the project. 4. The cost of all Catalyst Adsorbents/ Absorbents/ Chemicals shall include supply of all Catalyst (Proprietary & Non-Proprietary)/ Adsorbents/ Absorbents/ Chemicals and in non-returnable suitable sealed packing that will prevent loss, damage, deterioration or corruption of these items during ocean, air, rail and truck travel, handling and storage. The Licensor shall describe the type of packing and details of drum / barrel / bag / containers in its bid. The Licensor shall also confirm that the packing is suitable for transit and handling and for long term storage at Project site. The Catalysts/ Adsorbents/ Absorbents/ Chemicals supplied in drums/bags should be palletized for dispatch. 5. Quantities of Catalysts/ Adsorbents/ Absorbents/ Chemicals specified by Licensor in SOP shall be considered as guarantee numbers. 6. (Quantity under column 9) + (quantity under column 10) shall be equal to quantity under column 8. 7. Cost of total base Catalyst (column 13) = Qty. of supply of first charge of total base Catalyst (Kg) (column 9) X Unit Rate of Base Catalyst (column 12) quoted by Licensor in USD/EURO/INR. Cost of total base Catalysts/ Adsorbents/ Absorbents shall exclude the cost of metals against which the Price variation is required, as applicable, but shall be inclusive of all elements associated with Catalysts/ Adsorbents/ Absorbents processing, all conversion charges, processing cost, service charges for procurement of metals, as applicable, etc. Metals against which the Price variation is required, as applicable, and their quantity shall be mentioned separately in respective columns of Form-B6. 8. Price for Catalyst shall be as follows:Catalyst Price = Cost of total base Catalyst + Cost of metals, as applicable 9. Bidder provided rounded-off quantity nearest to barrel / drum/ bag size in the priced bid shall be considered for evaluation. 10. The cost of metals against which the Price variation is required, as applicable, is the cost of metals listed in the Catalysts/ Adsorbents/ Absorbents and is equal to metal content (in Kg) X cost of metals, as applicable, in USD / EURO/INR (per Kg) 11. Bidder to indicate “Unit Rate of base Catalyst in USD/GBP/EURO/JPY/INR” only. 12 Bidder to specify metals in SOP against which they want prices as per price index adopted in detailed Price Variation caluse as mentioned in Tender elsewhere. 13. Bidder to note that only the name of the Catalyst (as per column 2 above) and Name of Metal(as per column 4A) shall be submitted in the Unpriced Bid. 14. Bidder to note that the quantity of base Catalyst or metal are required to be quoted in Priced Bid only . 15. The foreign bidders are asked to quote both on FOB International Port of exit basis and also on CFR (Cost & Freight) Kolkata Port basis duly indicating the break-up of prices for freight and so on, with purchasers reserving the right to order on either basis 16. Cost of Metal in the catalyst shall be derived as per METAL PRICE VARIATION FORMULA as mentioned in SCC Job Name: SUPPLY OF FULL CHARGE OF CATALYST FOR TWO STAGE HYDROCRACKER UNIT AT NRL SITE, NUMALIGARH Tender No: PUR-1011852/BHA Bidder Name: Schedule of Prices SlNo Name of Catalyst/ Absorbent/ Adsorbent , Chemical/Cermaic/Inert ball Qty of Catalyst/ Adsorbent/ Absorbent [in Kg] Base(InKg) Metals SubTotal (col3+col4B) 5% handling/contingency losses[(col 3+col 4B)x 0.05] Total includinghandling loss(Col5+Col 6) Total Qty rounded off tothe next higherBarrel/ Drum/ Bag Sizeincludinghandling/contin gency losses(In Kg) Total base in thequantity indicated incolumn 8 (In Kg) Total metal in the quantityindicated in column 8(in Kg) Currency of tender to indicate (INR only) Basic Unit Rate of BaseCatalyst/ Adsorbent/Absorbent (per Kg) Total Basic price of Base Catalyst/ Adsorbent/Absorbent (per Kg) Freight Charges (in% of Basic) P&F Charges (in% of Basic) Transit Insurance (in% of Basic) GST % HSN code
4
2.0 Name Quantity (In Kg) Catalysts/ Absorbents/ Adsorbents/ Chemicals
5
Notes: 1. Licensor may add/delete the rows for nos. of Catalyst and Proprietary Adsorbents/ Absorbents/ Chemicals as per applicability in their technology. 2. The rates/ prices quoted for all Catalyst /Chemicals/ Adsorbents/ Absorbents shall remain firm till Bid Validity. 3. Delivery schedule shall be firm and valid till completion of the project. 4. The cost of all Catalyst Adsorbents/ Absorbents/ Chemicals shall include supply of all Catalyst (Proprietary & Non-Proprietary)/ Adsorbents/ Absorbents/ Chemicals and in non-returnable suitable sealed packing that will prevent loss, damage, deterioration or corruption of these items during ocean, air, rail and truck travel, handling and storage. The Licensor shall describe the type of packing and details of drum / barrel / bag / containers in its bid. The Licensor shall also confirm that the packing is suitable for transit and handling and for long term storage at Project site. The Catalysts/ Adsorbents/ Absorbents/ Chemicals supplied in drums/bags should be palletized for dispatch. 5. Quantities of Catalysts/ Adsorbents/ Absorbents/ Chemicals specified by Licensor in SOP shall be considered as guarantee numbers. 6. (Quantity under column 9) + (quantity under column 10) shall be equal to quantity under column 8. 8. Cost of total base Catalyst (column 13) = Qty. of supply of first charge of total base Catalyst (Kg) (column 9) X Unit Rate of Base Catalyst (column 12) quoted by Licensor in INR. Cost of total base Catalysts/ Adsorbents/ Absorbents shall exclude the cost of metals against which the Price variation is required, as applicable, but shall be inclusive of all elements associated with Catalysts/ Adsorbents/ Absorbents processing, all conversion charges, processing cost, service charges for procurement of metals, as applicable, etc. Metals against which the Price variation is required, as applicable, and their quantity shall be mentioned separately in respective columns of Form-B6. 9. Price for Catalyst shall be as follows:Catalyst Price = Cost of total base Catalyst + Cost of metals, as applicable 10. Bidder provided rounded-off quantity nearest to barrel / drum/ bag size in the priced bid shall be considered for evaluation. 11. The cost of metals against which the Price variation is required, as applicable, is the cost of metals listed in the Catalysts/ Adsorbents/ Absorbents and is equal to metal content (in Kg) X cost of metals, as applicable, in USD / EURO/INR (per Kg) 12. Indian Bidder to indicate “Unit Rate of base Catalyst in INR” only Exclusive of GST in column 12, while shall indicate other charges P&F, Freight and Insurance as % of total basic cost 16. Bidder to note that the quantity of base Catalyst or metal are required to be quoted in Priced Bid only . Bidder to note that only the name of the Catalyst (as per column 2 above) and Name of Metal(as per column 4A) shall be submitted in the Unpriced Bid. SIGN AND STAMP OF BIDDER
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.