| 1 | Laying and Jointing PVC Pipe. Heading |
| 2 | A. Creation of water body at back yard of Sundaram, GangasagarClearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specifications Clause 201 for Rural Roads of MORD.Mechanical Means. In area of non-thorny jungle |
| 3 | Earthwork in excavation in the canals / drainage channels / borrow pits /River bed / slope of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. for making banks as per profile or to deposit the same in any other place within an initial lead of 30 metre and initial lift of 1.5 metre including breaking clods, rough dressing etc.complete as per direction of the Engineer-in-charge.(a) Ordinary soil / local soil / soil mixed with moorum or kankar / silt, dry or moist / slushy silt / sticky soil. |
| 4 | Earthwork in making new embankment / ring bundh/ retired embankment by excavation of earth from borrow pits in all kinds of soil including making berms and depositing the same in layers not exceeding 25 cm. as per profile within an initial lead of 30 metre and lift of 1.5 metre including cost of nicking outlines, dug-belling, putting profiles, cutting and removing thick and thorny jungles, uprooting trees and stumps of all sizes upto 30 cm., girth from the site alignment as per direction of the Engineerin- Charge including dewatering, removal of weeds, carcasses, organicmatter etc., if any, breaking clods, rough dressing, watering, ramming, compacting etc. complete.(Work to be executed on section measurement by pre-work & post- worklevel section)A. Where land for earth owned/arranged by the Department. |
| 5 | Extra rate for all kinds of soil for every additional lift of 1.50 metre or part there of beyond the initial lift of 1.50metre. |
| 6 | Geotextile FilterLaying of a geotextile filter between cost of materials)pitching and embankment slopes on which pitching is laid to prevent escape of the embankment material through thevoids of the stone pitching/cement concrete blocks as well as to allow free movement of water without creating anyuplift head on the pitching. |
| 7 | Providing and laying Pitching on slopes laid over prepared filter media including stone boulder (size 225-150mm) apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. Filling & jointing (1:1.5:3 concrete) 0.3cum/1cum boulder. |
| 8 | Constructing Inspection pit of inside measurement 600mm X 600mm X upto 600mm (depth) with 250mm thick 1st. class brick work in cement mortar (1:4) on all sides, bottom of the pit consisting of 100 mm thick cement concrete (1:3:6) with stone chips over a layer of jhama brick flat soling, 15 mm thick (1:4) cement plaster to inside wall sand out side walls upto G.L. and 20 mm. thick (1:4) plaster to bottom of the pit,providing necessary invert with cement concrete (1:3:6) with stone chips as per direction, neat cement finishing to entire internal surfaces, top of the pit covered with100 mm thick R.C.C. slab (1:1.5:3) with stone chips and necessary reinforcements upto 1% and shuttering including 6mm thick cement plaster (1:4) in all externalsurfaces of the slab and one 560 mm dia. R.C.C. man hole cover of approved make supplied, fitted and fixed in the slab with necessary fittings, necessary earth work inexcavationin all sorts of soil, filling sides of the pit with earth and removing spoils after work complete in all respect with all costs of labour and materials.i) With Pakur variety. (SAIL/TATA/RINL) |
| 9 | Supplying, fitting and fixing PVC pipes of approved make of Schedule 80 (mediumduty) conforming to ASTMD 1785 and threaded to match with GI Pipes as per IS : 1239 (Part-I). with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, long screw, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads, fitting, fixing etc. complete in all respect including cost of all necessary fittings as required, jointing materials and two coats of painting with approved paint in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. Payment for painting willbe made seperately)(a) For Exposed Work PVC Pipes(Dia) 100 mm |
| 10 | B. Consulting of Pedestrian Pathway at backyard of of Sundaram, GangasagarEarthwork in excavationof foundation trenches or drains, inall sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sidesof trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (b)Depth of excavation not exceeding 1,500 mm. |
| 11 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation withwater, ramming complete including the cost of supply of sand. (payment to bemade on measurement of finished quantity)(B) Do - by fine sand |
| 12 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mmnominal size) excluding shuttering and reinforcement if any, in ground flooras per relevant IS codes.(i) Pakur Variety |
| 13 | Providing and fixing at or near ground level precast cement concrete in kerbs(size:410mm x 310mm x width150mm at bottom with circular nosing at top) (Nano kerb) of cement concre at M25 Grade without reinforcement, fixing asper approved pattern and setting in position at site after preparing the bed grade and slopes by laying Cement concrete with jhama khoa (1:4:8) asper specification and direction of Engineer-in Charge including fillingof joints with 10mm thick cement morter(3:1) and back filling the vertical piece properly with earth duly compacted and curing the morter joints for atleast 3 days including cost and carriage of all materials complete. |
| 14 | Supplying & laying asper IRC-SP:063-2004 paver unitof any shade of approved quality as per relevant IS code, laid in pattern as directed in pavement, footpath, driveway (paver blockonly), etc including necessary under lay complete in allrespect with all labour and material. [Border concrete if necessary to be paid separately].Note: Sub-grade CBR should not be less than 5.(b) 50 mm thick interlocking designer concrete paver block M-30 grade for non-traffic zone, buiding premises, garden, parks, domestic drive as per IS: 156582006 (over20-30mm medium sand bed on 200 mm thk bound gnaular/granular base course including cost of sand for sand bed but excluding cost of base course & subgradepreparation.)(ii) Coloured Decorative |
| 15 | C. Creation of landsacape at backyard of Sundaram, GangasagarSurface Dressing of the ground in any kind of soil including removing vegetation in equalities not exceeding15cm depth and disposal of the rubbish within a lead upto 75 m as directed. |
| 16 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to bemade on measurement offinished quantity)(B) Do - by fine sand |
| 17 | Supplying and fixing grasses tiles of grass Maxican Carpet/SelectionNo.1Healthy&freshgrasses(size1'x1'or bigger) includingwateringandmaintenanceof thelawnfor 30daysormore till the grass formsathicklawnfreefrom weesandfit formowing includingsupplyinggoodearthas required by Engineer-in-charge. (Rate includes supply of labour, tools & plants including materials) |
| 18 | Brick soling with picked jhama bricks including preparation of bed as necessary with brick joints properly filled in and packed with powdered earth and including necessary cushion of similar material below the soling (and in between layers when more than one layer is used) completes as per direction.(a) Single brick flat soling (thickness 75 mm.) |
| 19 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mmnominal size) excluding shuttering and reinforcement if any, in ground flooras per relevant IS codes.(i) Pakur Variety |
| 20 | Supplying, fitting & fixing 1st quality Ceramic tiles in walls and floors to match with the existing work & 4nos. of key stones (10mm) fixed with a raldite at the backof each tile & finishing the joints with white cement mixed with colouring oxide if required to match the colour of tiles including roughening of concrete surface, if necessary or by synthetic adhesive & grout materials etc.(A) FloorWith Sand Cement Mortar (1:4) 20mm thick & 2mm thick cement slurry at back side of tiles using cement @ 2.91 Kg/Sq.m & joint filling using white cement slurry @ 0.20kg/Sq.m.(a) Area of each tile upto 0.09 Sq.m(i) Coloured decorative |
| 21 | Wood Square Cast Iron Powder Coating Garden Bench, Capacity 4 SeaterDesc: Powder Coating, Weight Bearing Capacity 147 kilogram, Cast Iron, Mild Steel Pipe 14 GaugeTotal Height 967 millimeter Seat Height 450 millimeter Width 480 millimeterTotal Area Required 1320 millimeter |
| 22 | Bismarckia Palm 115 to 180 cm ht. plant, well developed 12 and above good color fresh and healthy leaves in 40 cm Cement Pot |
| 23 | Plantation of Trees, Shrubs, and Hedge at site i/c watering and removal of unserveiceable material’s as per direction of officer in charge (excluding cast of plant & water)2.57.1 Trees Plant |
| 24 | D. Electrical illumination for back yard landscape zone of of Sundaram, GangasagarEarthwork in excavation of foundation trenches or drains, inall sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(b)Depth of excavation for additional depth beyond 1,500mm. and upto 3,000mm. but not requiring shoring.[Ref: PWD Vol-I, Page:1/315 Item-2-b, schedule Vol-i 2017] |
| 25 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to bemade on measurement offinished quantity)(B) Do - by fine sand |
| 26 | Brick soling with picked jhama bricks including preparation of bed as necessary with brick joints properly filled in and packed with powdered earth and including necessary cushion of similar material below the soling (and in between layers when more than one layer is used) completes as per direction.(a) Single brick flat soling (thickness 75 mm.) |
| 27 | Aluminium casting Garden Lighting pole including lighting system (lantern/luminaire) (Note: Pole height including lantern/luminaire (in m)) HALONIX LED Garden Light |
| 28 | 4 Core Copper Armoured Cable, 6 sq mm Standard brand10 % of SL No. 26 |
| 29 | Add 18% for GST |
| 30 | Add 1% Cess Please Enable Macros to View BoQ information |