|
| 1 | Fixing G.C.I. Sheet (Dura shine, Coloured sheet) in roof drilling holes in wind ties including fixing of ridges valleys wind ties etc. including cost of fitting per 1 Sqm (Vide AR-125/32) |
| 2 | Iron work wrought and put up in Trusses |
| 3 | Brick work with Fly Ash bricks 25cm x 12cm x 8cm size having crushing strength not less than 35Kg/cm2 with dimensional tolerance ±8 percent in cement mortar (1:4) in Foundation and Plinth including watering curing, cost of carriage, royalty and taxes of all materials, cost of all labour, T&P etc complete as per the direction of Engg-in -charge. |
| 4 | First Floor |
| 5 | Providing fitting and fixing of false ceilling with Aluminium anodised T Section No. 3215 with 2'-0\\" center to center, L section No. 1705 upto 15 micron on 4 walls to fixed by means of steel screw and P.V.Cbe plug and the Aluminium grid 2'-0\\"x2'-0\\" suspended from ceiling etc complete . |
| 6 | 12mm thick C.P. in C.M.(1:6) over brick masonary to the smooth surface including watering, curing, cost, carriage, royalty and taxes of all materials, cost of all labour, T&P etc complete as per the direction of E.I.C. |
| 7 | 16mm thick C.P. in C.M.(1:6) over brick masonary to the rough surface including watering, curing cost, carriage, royalty, and taxes of all materials, cost of all labour, T&P etc complete as per the direction of E.I.C. |
| 8 | Priming 1 coat with wall primer water bond cement primer including all labour, materials, T&P etc. complete. |
| 9 | First Floor |
| 10 | Priming 1 coat with wall primer water bond cement primer including all labour, materials, T&P etc. complete. |
| 11 | First Floor |
| 12 | Finishing to the exposed surfaces of wall with weather coat of any approved shade on new work 2 coats to give an even shade including cost of weather coat all cost of all labours and T&P etc. complete . |
| 13 | First Floor |
| 14 | Wall painting 2 coats with plastic emulsion paint of approved shade on new work to give an even shade including cost of paint etc complete. |
| 15 | First Floor |
| 16 | Ms Door & Window |
| 17 | Priming 1 coat with primer on iron work including all labour, materials, T&P etc. complete. |
| 18 | Painting 2 coats with any approved paint in iron works including sand papering, polishing surfaces, cost of paints, cost of all labour, T&P, etc complete in all floors as per direction of E.I.C. |
| 19 | Finishing wall surface with Acrylic wall putty (water based) of approved make and finished smooth & even surface to receive painting including cost of scaffolding etc. with cost of all materials, labour T&P etc. complete. |
| 20 | Earth work in excavation of foundation in hard soil or gravelly soil including dressing and leveling the bed and disposal of the excavated materials with mechanical means within 5.00km. initial leads and lifts as per direction of E.I.C. |
| 21 | Supplying & filling foundation and plinth with sand well watered and rammed including cost, cost of all labour, carriage, royalty, taxes, T&P etc complete. |
| 22 | Cement Concrete (1:3:6) using 40mm size hard granite C.B. metal approved quality from approved quarry including hoisting laying using concrete mixture and vibrators including cost, carriage, royalty, cost of all labour T.&P. etc complete and as directed by E.I.C. |
| 23 | RCC work of M-20 grade with 20 mm and down graded hard granite (CB) stone chips including hoisting and laying and all cost conveyance and royality etc. Column Base |
| 24 | Plinth Beam |
| 25 | Column |
| 26 | Lintel Beam |
| 27 | S.case |
| 28 | Wall Beam |
| 29 | Straightening, cutting, bending, binding of M.S rod or Tor steel, tying up the grills and placing in position including cost of binding wire with all cost conveyance, taxes etc completed in all respect as per the direction of engineer in charge. Please Enable Macros to View BoQ information |