| 1 | Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge. |
| 2 | Convayying the Exacavated Earth away from the work site by mechanical means with in 5km lead as per the direction of EIC. |
| 3 | Filling in foundation and plinth with sand watered and rammed etc including all cost conveyance royalty ,labour and T&P etc. complete as directed by the Engineer - in Charge. |
| 4 | R.C.C. (1:3:6) using 4cm size Crusher Broken granite metal inclding cost. Conveyance and royalty etc. complete. |
| 5 | Fly Ash brick masonry in C.M (1:4) in foundation & Plinth Using 25cm x 12 x 8cm brick having crushing strength not less than 75 kg/ cm2 including all cost and conveyance , royalty & Taxes etc. complete all materials to work site as per specification |
| 6 | C.C. (1:2:4) with 12mm to 20mm size Crusher Broken chips including all cost , conveyance Royalty & Taxes etc. complete of all materials to work site as per |
| 7 | Fly Ash brick masonry in C.M (1:6) in foundation & Plinth Using 25cm x 12 x 8cm brick having crushing strength not less than 75 kg/ cm2 including all cost and conveyance , royalty & Taxes etc. complete all materials to work site as per specification |
| 8 | 12mm thick C.P (1:6) outside over brick work including all cost conveyance Royalty. & Taxes etc. complete of all materials to work site as per specification approved of EIC. |
| 9 | 16mm thick C.P (1:6) inside over brick work including all cost conveyance , royalty & Taxes complete of all materials to work site as per specification approved E.I.C |
| 10 | Painting two coat with weather seal coat over a coat of water bound wall primer |
| 11 | Painting two coat with approved synthetic Enamel paint on new wood / iron work including cost of materials & Labour |
| 12 | Fixing kota tiles in floor and risers os fteps on 12mm C:P (1:1) joined with neat cement slury mixed with pigment to match the shade of the tiles including rubbing etc. complete |
| 13 | Supplying all materials labour & T&P for constructing of brick masonry inspection chambers including cleaning of existing choked and damaged inspection through sweepers dismantling and removal of old and damaged brick masonry work completely given remporary chokesand when necessary till completion eart work in axcavation in all kinds of soil. K.B brick work in C.M |
| 14 | Providing fitting fixing P.V.C. SWR pipe of standard manufactures including all jointing earthwork in excavation of trenches in all kinds of soil upto depth on 0.9 mtr and refilling the trench in 0.3 mtr. layers duly watered and rammed |
| 15 | Repair of HP Pump and Installation cost of cable |
| 16 | M.S. Angle y- Frame including fitting fixing & Bared wire fixing around the boundary wall with all materials labour etc. complete, total length of the boundary wall (543.00 Mtr) in 50x50x6 angle |
| 17 | Supplying fitting fixing of M.S. Bnared wire fixing around the boundary wal with allmaterial labour etc. complete total length of the boundary wall 543. 00 mtr |
| 18 | Dismantling Brick wall for making notch for fixing of y frame |
| 19 | Add. Cost of Photograph etc. complete Please Enable Macros to View BoQ information |