|
| 1 | Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m. Initial lift including rough dressing and breaking clods to maximum 5cm.to 7cm. and laying in layers not exceeding 0.3 m. in depth asper direction of the Engineer-in-charge. |
| 2 | Supplying and filling of sand in foundation and plinth well watered and rammed including all cost, labour, T & P etc complete. |
| 3 | Cement concrete (1:4:8) in foundation and plinth using 4 cm size HGB metal with mixing, laying, compacting and curing including all cost, conveyance, taxes etc complete. |
| 4 | RCC work M-20 grade with 20mm and down graded black hard granite (crusher broken) stone chips including hoisting and laying etc. complete in all respect. Column Footing |
| 5 | Lintel |
| 6 | Piller & Beam |
| 7 | Supplying fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification. (A/R, P-52, item -9a) |
| 8 | Flyash Brick (25cm x 12cm x 8cm) masonary in cement motar (1:6) in foundation and plinth including cost convenyance royality of materials etc. complete as per direction of the E.I.C. Data per 1 Cum.Foundation |
| 9 | Fly ash bricks in Cement mortar (1:6) in Super structure including all cost,conveyance etc.Super Structure |
| 10 | 16 mm thick Cement Plaster with cement mortar (1:6) over RCC surface including deep chiping & including all cost, conveyance, , royalities etc. complete as directed by the Engineer-in-charge. |
| 11 | 12 mm thick Cement Plaster with cement mortar (1:6) over RCC surface including deep chiping & including all cost, conveyance, , royalities etc. complete as directed by the Engineer-in-charge. |
| 12 | Grading |
| 13 | Providing and fixing vertified tiles of size 600mmX600mm coloured or printed series (homogeneous) in floors, treads or steps and landing on 25 mm thick bed of cement mortar (1:1) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles as directed by the Engineer-in-charge. |
| 14 | Providing and fixing vertified tiles of size 600mmX600mm coloured or printed series (homogeneous) in dados, skirtings and risers of steps on 12 mm thick cement plaster (1:3) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles as directed by the Engineer-in-charge. |
| 15 | Finishing wall surface of walls with cement based wall putty (Water based ) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials , labour T&P etc complete. |
| 16 | Priming one coat with any approved primer including cost of primer for Steel work. |
| 17 | Wall painting with two coats weather coat paint of approved shade on new wrk to give an even shade excluding cost of paint. |
| 18 | Plastic Paint Putty Area |
| 19 | Cement concrete (1:2:4) with 12mm. Size hard broken granite chips (Crusher broken) including all cost, conveyance , royality etc. complete. Please Enable Macros to View BoQ information |