| 1 | 2.Erection of 11KV line by using 3Cx50mm2 XLPE Cable & 4nos. Of 11Mtr WPB Poles & 1no.13mtr WPB at D= 0.08Km (From D-E) (Double Circuit)=2*0.08Km=0.16Km |
| 2 | 13mtrs long WPB Pole with Base plate (30.44Kg/m) |
| 3 | 11mtrs long WPB Pole with Base plate (30.44Kg/m) |
| 4 | 150X150mm RS joist (11 Mtr long)(34.6kg Per meter) as stud pole at D with Galvanisation. |
| 5 | 150X150mm RS joist (9 Mtr long)(34.6kg Per meter) as stud pole at G with Galvanisation. |
| 6 | Stud Clamp |
| 7 | Earthing device Coil type |
| 8 | 11 KV V Cross Arm( 10.2 Kg each) |
| 9 | GI Back Clamp for 11 KV \\"V \\"Cross Arm |
| 10 | 11KV F clamp 2.9Kg each |
| 11 | 11KV Pin Insulator Polymer |
| 12 | 3Cx50mm² 11KV XLPE Cable (Armoured) |
| 13 | Heat shrinkable jointing kit suitale for 3Cx50 mm² 11KV XLPE Cable (out door type) |
| 14 | G.I pipe Earthing 40 mm dia medium gauge(3.25mm thick ness) 3 mtr long |
| 15 | Dead end clamp |
| 16 | Suspension clamp |
| 17 | Eye hook for (XLPE Cable) |
| 18 | Pole clamp Eye hook for (XLPE Cable) |
| 19 | XLPE Cable clamp to hold support wire |
| 20 | 7/12 GI Stay Wire for supporing Cable |
| 21 | 9 KV 5 KA 11 KV Lighting Arrestor |
| 22 | 25 x 4 mm GI Flat (For Lightning Arrestor) |
| 23 | 75x40x6mm GI channel for LA |
| 24 | HT Stay Set |
| 25 | Stay Wire (7/10 SWG) |
| 26 | Stay Insulator |
| 27 | Stay Clamp |
| 28 | GI nuts,bolts and washers |
| 29 | Anticlimbing Device(GI barbed wire 3kg per support) |
| 30 | Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 8 no's = (8x0.59x0.510) |
| 31 | Danger plate |
| 32 | Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 2 no's = (2x0.59x0.510) |
| 33 | Black Paint |
| 34 | Yellow colour paint for back ground |
| 35 | Sundries ( Clamp, Connectors, Binding tape etc |
| 36 | 3.Erection of 13Mtr WPB pole at A,B & C=3Nos. and guarding at AC & BD =2Nos. |
| 37 | No.6 /8 G.I. Wire for road cross guarding 2nos. |
| 38 | 75X40X6 mm, Channel St Cross arm 1.8Mtr @ 6.8Kg/mtr (2Nos) (with galvanisation) for road cross Guarding |
| 39 | Eye hook |
| 40 | No 25 x 6 mm GI flat for earthing |
| 41 | Cement Concrete for Stay Anchor plate / stud CC foundation 1:3:6 size by using 4cm size HBG metal=(0.45 x0.45x1.5)mtr=0.3037Cum. @4158.84=1263.03 or 1270.00 |
| 42 | Concreting of poles in ratio 1:1.5:3 for 11Mtr WPB Poles |
| 43 | Couping of poles in ratio 1:1.5:3 for 11Mtr WPB Poles |
| 44 | Concreting of poles in ratio 1:1.5:3 for 13Mtr WPB Poles |
| 45 | Couping of poles in ratio 1:1.5:3 for 13Mtr WPB Poles |
| 46 | Concreting of poles in ratio 1:1.5:3 for 11Mtr joist Poles (Stud) |
| 47 | Concreting of poles in ratio 1:1.5:3 for 9Mtr joist Poles (Stud) |
| 48 | Materials for Massionary work for Earth Pit,Charcoal, Salt etc including construction of earthing chamber (Size: 2\\"x2\\") and RCC slab cover |
| 49 | Dismantling charges of 9Mtr PSC pole |
| 50 | Service Connection Estimate for providing 3-Phase power supply of 160KW/178KVA load to Ayush Hospital,Karapalli at New Narayanpur under ESO,Bhanjabihar on 6% deposit norms. |
| 51 | Metering unit mounting channel 100x50x6mm GI channel each 2.8mtr. Long 2Nos @9.2Kg/mtr with GI |
| 52 | Cantilever chanel for supporting metering unit, 100x50x6mm GI Channel @ 9.2Kg/mtr (1.6mtrs. Long 4 nos.) |
| 53 | Angle for Cantilever arrrangement for metering unit 50x50x6mm GI Angel 2.8mtr long each 4Nos @ 4.5Kg/mtr |
| 54 | 10Cx2.5mm2 armoured control cable 2XY |
| 55 | Installation of 250KVA,11/0.4KV Plinth Mounted S/s -1No. |
| 56 | Pressure Channel (100X50X5) mm (9.56 Kg. / Mtr.)Rs.10.00 added for Galvanization |
| 57 | AB Switch mounting channel (100X50X5) mm(9.56 Kg. / Mtr.) |
| 58 | HG fuse mounting channel (75X40X4.8) mm(7.14 Kg. / Mtr.)Rs.10.00 added for Galvanization |
| 59 | Channel for cantilever arrangement (75X40X4.8) mm(7.14 Kg/mtr.)Rs.10.00 added for Galvanization |
| 60 | Angle for cantilever arrangement (50X50X6)mm(4.5 Kg./Mtr.)Rs.10.00 added for Galvanization |
| 61 | DP Bracing Channel (100x50X6)mm (9.2 Kg./Mtr.)RS.10.00 added for Galvanization(4 Nos.) |
| 62 | DP Bracing angle (50X50X6) mm 7Mtr. (4.45 Kg./Mtr.)RS.10.00 added for Galvanization |
| 63 | Angle for mounting LT distribution box (50X50X6)mm(4.5 Kg./Mtr.)Rs.10.00 added for Galvanization |
| 64 | 400 Amp 3 Pole AB Switch |
| 65 | 400 Amp 3 Pole HG Fuse |
| 66 | LA (12KV, 10KA) |
| 67 | 11 KV Disc Insulator (B& S) (Polymer) 90KN |
| 68 | H/w Fitting(B&S) 90KN |
| 69 | 25 x 4mm GI Flat for Substation earthing |
| 70 | 25 x 6mm GI Flat for Neutral earthing of 500KVA |
| 71 | LT Distribution Box with MCCB, Aluminium Busbar for 3 Bay with kit kat fuse for 250 KVA S/S |
| 72 | 250 KVA.11/0.4 KV (AL)Transformer with tap changer, BIS Energy level-II |
| 73 | 80sqmm AAA conductor for jumpering |
| 74 | 1Cx300mm2 LT XLPE cable(Armoured) |
| 75 | Sundries for tree cutting,Clamp,Connectors, Binding tape etc) |
| 76 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in Cement mortar 1:6 (1 Cement : 6 Coarse sand) as per TPSODL specifcation. Scope includes supply of all material with Locking arrangement ( for 18 Running meter) |
| 77 | Supply, Laying, spreading and compacting with hand roller stone aggregate of specified sizes : 63 mm to 45mm size stone aggregate to WBM specifications in uniform thichness, hand picking to proper grade and camber, applying and brooming requisite typel to fill up interstices of coarse aggregate, watering and compacting to the required density. Scope of work also includes of jungle such as grass, small tree plant etc. |
| 78 | Civil cost for makingTRF plinth from 250KVA of upto 1000KVA.BA has to provide necessary civil material,manpower,machinery for construction of plinth as per standard drawing Please Enable Macros to View BoQ information |