|
| 1 | Levelling the existing ground including removing vegetation and undulation not exceeding 5 cm deep, consolidating the levelled surface in layers not exceeding 5 cm in depth, breaking clods, watering, rolling, each layer with roller or wooden /steel rammers that a gradual slope is maintained after consolidation to one side of the area for drainage etc. complete. The rate quoted shall be inclusive of cost and conveyance of all labours, materials, equipments, other incidentals etc. complete and disposal of rubbish and vegetation to the designated dumping area within 1 Km as instructed by the Engineer-In-Charge. |
| 2 | Repairing the damaged walls of existing drain by removal of loose debris, providing RMC grade of M20 after centering, shuttering, finishing, removal of loosened materials etc including costs and conveyance of all materials, labour removal of loose materials, etc complete all as directed by Engineer-In -Charge.(Concrete and steel reinorcement will be paid seperately) |
| 3 | Providing and laying in the ready mix concrete (RMC) of M10 grade using maximum aggregate size of 20mm, with a thickness of 10cm (surface shall be finished smooth & level) manufacured in fully automatic batching plant and transported to the site of work in transit mixer for all leads in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer to site of laying including cost and conveyance of all materials, cost of cement, labour for laying, consolidating by vibration, curing, cost of admixtures in reccomended proportions as per relevant IS code to accelerate/ retard setting of concrete, improve workability without impairing strength and durability etc. as per direction of the Engineer-in-charge . Rate quoted shall be inclusive of cost of all materials, labour, hire charges of tools, machineries, equipments etc. complete. |
| 4 | Providing and laying in the ready mix concrete (RMC) of M20 grade using maximum aggregate size of 20mm with a thickness of 10 cm (surface shall be finished smooth & level) manufacured in fully automatic batching plant and transported to the site of work in transit mixer for all leads in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer to site of laying including cost and conveyance of all materials, cost of cement, labour for laying, consolidating by vibration, curing , cost of admixtures in reccomended proportions as per relevant IS code to accelerate/ retard setting of concrete, improve workability without impairing strength and durability etc. as per direction of the Engineer-in-charge . Rate quoted shall be inclusive of cost of all materials, labour, hire charges of tools, machineries, equipments etc. complete. |
| 5 | Supplying and fabrication of reinforcement for RCC work including cost and conveyance of all materials, such as steel, 22G binding wire,cover blocks, etc. labour for uncoliling,straightening ,cutting,bending,laying & tying with 22G binding wire,complete all as per the directions of Engineer-In-Charge. Please Enable Macros to View BoQ information |