| 1 | Earth work excavation in hard soil or gravelly soil within 50mtr. initial lead and 1.50mtr initial lift including rough dressing and levelling the bed with all cost, labour T & P etc complete |
| 2 | Convaying the Exacavated Earth away from the work site by mechnical means with in 5 km lead as per direction of EIC |
| 3 | Supply and filling in foundation and plinth with river sand, in layers including watering, with cost, conveyance, royalties, and taxes of all materials, cost of all labour, carriage of water, sundries T & p required for the work etc all complete as per the specification & direction of E-I-C |
| 4 | C:C: (1:4:8) using 4 cm. size H.G. (C.B) metal including the cost of all materials, labour carriage, royalty etc complete. |
| 5 | C:C: (1:2:4) using 12 mm to 20 mm size H.G. stone chips including the cost of all materials labour carriage, royalty etc complete. |
| 6 | Fly Ash Brick masonry in C.M. (1:4) in founadtion & plinth and having crushing strength not less than 75 Kg / cm2 with dimensional tolerance ± 2%. |
| 7 | Fly Ash Brick masonry in C.M. (1:4) in super structure having crushing strength not less than 75 Kg / cm2 with dimensional tolerance ± 2%. |
| 8 | 2.5 cm thick A.S. flooring with cement concrete (1:2:4) including punning using 12mm size H.G.C.B. chips |
| 9 | 12mm thick C:P (1:4) over brick work |
| 10 | Painting two coats with weather seal coat over a coat of water bound wall primer. |
| 11 | Supplying of GCI galvanised sheet including all cost and Carriage etc complete |
| 12 | Iron works wrought and put up at trusess and purlin including fabrication and all cost M. S Pipe 40mm dia 100x100x5mm |
| 13 | 50x50x4.50mm |
| 14 | 50x50x4.50mm |
| 15 | Priming one coat with any approved primer including the cost of labour & primer. |
| 16 | Painting two coats over a coat of priming over new wood work & Iron work with the cost of primer & paint. |
| 17 | Drilling screws 6mm to 12mm dia at iron Flats, angles,tees,etc of 6mm to 10mm Thick with hard dri(Labour only)/per each. |
| 18 | Supplying and fixing of M. S. door including all cost of material and fabrication charge etc all complete |
| 19 | Cost of Display Board Please Enable Macros to View BoQ information |