| 1 | Supplying and providing Layer-2 managed switch 8 Port Industrial Grade |
| 2 | Supply of 24 Core armored Fibre cable |
| 3 | Supplying and Providing Patch Cord, Single mode, G.652D OS1/OS2 corning, 2.0mm/3.00mm Duplex LC-SC, PC type, Insertion loss: <0.2dB, Max= 0.3 dB, Length: 3 mts |
| 4 | Supplying and Providing LIU Port Rack Mount, Single mode, Loaded with SC type adaptors, with Splice Tray & Cable spool provision inside |
| 5 | Supplying and providing Floor mount outdoor Rack/Enclosure IP66 with provision of single phase power meter box H-1500mm, W-1200mm, D-800mm with cable manager and 3 trays and cooling fans, 32 Amp double pole MCB, Power strip with 5 nos 6Amp sockets, half feet tube light |
| 6 | Providing and Installation of floor mount enclosure on 2ft concrete slab with 2 ft piling and proper earthing |
| 7 | Laying outdoor armored fibre cable in G.I./Steel piping of 25 mm when passing under tar/concrete roads, etc with all leads/lifts, etc. complete |
| 8 | Laying outdoor armored fibre cable in High Density (HD) pipes of 300 mm when passing under soil, etc with all leads/lifts, etc. complete |
| 9 | Excavation and refilling of soil including use of trenchless technology |
| 10 | Excavation and refilling of soil including use of trenchless technology |
| 11 | Supply of High Density pipes of 300 mm or higher |
| 12 | Supply of G.I./ Steel pipes of 100mm or higher for road crossings |
| 13 | Providing, Laying and fixing in position Pigtail, SM, Simplex SC-Type 1M |
| 14 | Providing, Laying and fixing in position Fibre termination |
| 15 | Providing, Laying and fixing in position Fiber Transreceiver |
| 16 | Providing, Laying and fixing in position 42U Rack |
| 17 | Single Phase Power meter with connection |
| 18 | Providing, Laying and fixing in position OLT 8 Port |
| 19 | Providing, Laying and fixing in position OLT 4 Port |
| 20 | Providing, Laying and fixing in position Fibre Splitter- 1:2, 1:4, 1:8, 1:16 |
| 21 | Providing, Laying and fixing in position 1 kv UPS with 1 hr backup |
| 22 | Providing, Laying and fixing in position 10 kv UPS with 6 hrs backup |
| 23 | Server Setup Please Enable Macros to View BoQ information |