| 1 | Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed.iii) 15 cm av. Diameter |
| 2 | Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles.iii) 15 cm av. Diameter |
| 3 | Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site.a) Width of thinner end above 10 cm. and less than 15 cm.(i) Jhaw / Eucalyptus. |
| 4 | Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). |
| 5 | Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag |
| 6 | Extra rate for item no above for each additional lead of 60 metre or part thereof beyond the initial lead of 30 metre. 2(Two) Extra lead |
| 7 | Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts. |
| 8 | Earthwork from borrow pits over existing embankment or for repairs to embankment, closing breaches etc. within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25 cm. and rough dressing etc. complete as per profile. |
| 9 | Pumping out water from ponds or tanks.Note: (Payment if permitted will be made on the quantity of water calculated on the basis of initial water level and final level on consideration being made for any water that may have been added through percolation or otherwise) |
| 10 | Excavation for StructuresEarth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge .I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means.a) upto 3 m depth(i) With pumping out water including shoring as required. |
| 11 | Supplying, Hot Rolled Non-Alloy Steel Sheet piling, Z-Type or U-Type with Larssen Interlock as per EN 10248-1:1996 & EN 10248-2:1996, Steel name S430GP & number 1.0523 (both as per EN-I0027), Classification Quality Steel (QS) as per EN 10020 having minimum yield strength of 430 N/mm2 including all statutory taxes, duties and incidental charges but excluding GST at Ex-stack yards of the supplier/ Ex-Port in West Bengal /Ex-Railway yard in West Bengal. For Export delivery, custom clearance formalities and charges would have to be borne by the Supplier as per dimensional parameters, sectional properties and testing requirements given below:Specification:- Range of minimum thickness (excluding tolerance) at any part in mm (t min) 8.50 ≤ t ≤ 9.50 Range of Mass (Kg / sqm) (M) 105.00 ≤ M ≤ 120.00 Range of Elastic Modulus (cm3) (E) 1600 ≤ E ≤ 2200 |
| 12 | Driving M S sheet piles of any kind of approved type and size conforming to I.S. code in all kinds of soil/ soil mixed with gravel, shingle & pebbles, by vibro-sinker including handling, cutting to requisite size, drilling holes, hoisting in position, welding, fabrication of sets of tapper piles, corner piles etc. with clutch bars as may be required including staging, scaffolding and hire charges of driving machinery and equipments, scraping and cleaning piles, painting the surface with one coat of surface primer of approved make and brand and two coats of ready mixed oil bound paint (except red lead and black japan) etc. including all cost of labours, supply and carriage of equipmemnts to site (by any mean) as per drawing and direction of the Engineer-in charge but excluding the cost of sheet piles.NB:- Measurement of area underground to be taken i.e. straight length of pile multiplied by driven length). |
| 13 | Sand filling in foundation trenches and at the back of abutments, wing-walls etc. with good local sand free from earth in layers not exceeding 15 cm. including inundating each layer by profuse water and poking and ramming layer by layer complete including supply of sand. Quality of sand is to be approved by the Engineer-in-charge. |
| 14 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.a) Pakur Variety |
| 15 | Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction.(b) Where staging is not required. |
| 16 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. |
| 17 | Plain / Reinforced Cement Concrete in Open foundation with or without reinforcements, in any part of foundation of bridges / culverts with graded stone chips of appropriate nominal sizes, including screening and cleaning of coarse aggregates, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, cost of curing with water, including cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge, cost for quality control, sampling, testing etc. including cost of formwork but excluding reinforcement complete as per drawing and technical specifications.F RCC Grade M30 I) Using concrete mixer |
| 18 | Plain / Reinforced Cement Concrete in Sub-structure with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality, cement and water reducing admixtures, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control,sampling, testing etc. all complete as per drawing and technical specification including the cost ofnecessary form work and staging complete as per drawing and technical specifications.F RCC Grade M30 (i) Height upto 5m I) Using concrete Mixer |
| 19 | Plain / Reinforced Cement Concrete in Sub-structure with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality, cement and water reducing admixtures, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete as per drawing and technical specification including the cost of necessary form work and staging complete as per drawing and technical specifications.RCC Grade M30Height 5m to 10mI) Using concrete Mixer |
| 20 | Furnishing and Placing Reinforced / Pre-stressed Cement concrete in Super-structure with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement and admixtures, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete as per drawing and technical specification including the cost of necessary form work and staging complete. as per drawing and technical specifications.C. RCC Grade M30 I) Using concrete mixer For solid slab super-structure Height upto 5m |
| 21 | Supplying, fitting and placing un-coated HYSD bar reinforcement in Bridge Foundation including initial traightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications and direction of Engineer-in-charge. |
| 22 | Supplying, fitting and placing HYSD bar reinforcement in Sub-structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications and direction of Engineer-in-charge. |
| 23 | Supplying, fitting and placing HYSD bar reinforcement in Bridge Super-structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications. |
| 24 | Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12 rnm. true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 rnrn. leaving adequate space between vertical post for xpansion, complete as per MoRT&H standard drawing no SD/202 and technical specifications. |
| 25 | Providing and laying Cement concrete Wearing coat M-30 grade with graded stone chips 19mm down including screening and cleaning approved stone chips and sand as necessary laying, finishing complete to camber and grade, curing with water, including cost and carriage of all materials and hire charges for form work including reinforcement complete as per drawing and Technical Specifications vide clause no. 2702 of MoRT&H’s Specification for Road & Bridge Works. |
| 26 | Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification.Note: Add cost of 0.72 m3 of brick aggregates / river bed materials and 0.48 m3 of coarse sand (loose volume) to arrive at the consolidated rate. |
| 27 | Providing weep holes in Brick masonry / Plain / Reinforced concrete abutment, wing wall / return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and Technical specifications. |
| 28 | Painting the vertical end faces of posts, wheel guards or railing or parapet with alternate bands of different colours as directed by the Engineer-in-charge with approved synthetic enamel paint. |
| 29 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] A. ORIGINAL WORKS I. (i) With 1:6 cement mortar. (b) 20 mm thick plaster |
| 30 | Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. In Ground Floor:(a) Two Coats |
| 31 | Earthwork in filling in foundation trenches with good earth in layers not exceeding 15cm. including watering and ramming layer by layer complete with earth obtained from excavation of foundation or from fresh excavation of land arranged by Department within a lead of 150 m.Estimate Item Note:Applicable for foundationtrenches in Rocky & Marshy soil. |
| 32 | Cast-in-situ cement concrete blocks or lining units as per designed section and specification, in nominal mix proportion 1:1.5:3 (corresponding to M20 Grade) with well graded 20mm down stone metal aggregate, laid in position by casting in alternative panels or otherwise to keep a gap of 12mm between the adjacent units, over a layer of polythene sheet of thickness not less than 100 µm to act as a separator between the bottom surface of the block and the sand cushion / filter material laid below the blocks, including dressing, ramming, shuttering, finishing the exposed surface by trowel without adding any additional cement and sand mortar, curing and filling the gaps between the adjacent units by 5.6mm down coarse aggregate to be compacted properly, with all leads and lifts including supply and carriage of all materials, complete, without the cost of sand cushion / filter.Stone aggregate of pakur variety. |
| 33 | Earthwork in excavation in the canals / drainage channels / borrow pits / River bed / slope of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. for making banks as per profile or to deposit the same in any other place within an initial lead of 30 metre and initial lift of 1.5 metre including breaking clods, rough dressing etc. complete as per direction of the Engineer-in-charge.(a) Ordinary soil/local soil/soil mixed with moorum or kankar/silt dry or moist/slushy silt/sticky soil. |
| 34 | Extra rate over Item Nos33 for all kinds of soil for every additional lead of 30 metres or part thereof beyond the initial lead of 30 metres.1 (One) Extra Lead |
| 35 | Extra rate over Item Nos.33 for all kinds of soil for every additional lead of 30 metres or part thereof beyond the initial lead of 30 metres.2(Two) Extra Lead |
| 36 | Extra rate over Item Nos.33 for all kinds of soil for every additional lead of 30 metres or part thereof beyond the initial lead of 30 metres.3(Three) Extra Lead |
| 37 | Extra rate over Item Nos.33 for all kinds of soil for every additional lead of 30 metres or part thereof beyond the initial lead of 30 metres. 4 (Four) Extra Lead |
| 38 | Extra rate over Item Nos.33 for all kinds of soil for every additional lead of 30 metres or part thereof beyond the initial lead of 30 metres.5 (Five) Extra Lead |
| 39 | Taking out bullah wailing pieces after removing nuts, bolts and iron nails and stacking the same within 150 metre from the site of work including sorting out and stacking serviceable meterials. |
| 40 | Cutting bullah by saw at level desired by the Engineer-in-Charge and marking the same by paint and stacking the same upto 60 metre lead and all lifts complete.(a) Bullah of dia upto 15 cm. |
| 41 | Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measuredaftercompaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade andcamber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the requireddensity, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).(i) For Construction of Sub Base by consolidating Jhama metal (63 mm to 45 mm) with moorum screeningAdd cost at site of 1.09 m3 of jhama metal and 0.26 m3 of moorum screening (loose volume) to arrive at the consolidated rate. |
| 42 | Supplying, spreading and consolidating Moorum to a depth of 75 mm at desired density and C.B.R. as per specification with power roller to proper gradient and camber including watering as necessary, and lighting, guarding, barricading and making adequate earthen bundh where necessary to protect the edges and curing with water for 2 to 3days, mending cracks by rolling where necessary including all incidental charges of roller, cost of fuel & lubricants etc. complete as per specification.Add cost at site of the materials to arrive at the complete rate. The compaction factor may be taken as 0.67.(The payment is to be made on the basis of the finished compacted volume of moorum.) |
| 43 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. |
| 44 | Providing and laying reinforced cement concrete pipe NP3 with spigot socket for culverts on first class bedding of granular material in double row including fixing with cement mortar 1:2 as per Technical Specification Clause 1106 for Rural Roads of MORD.(E) 900 mm diaAdd cost and carriage of Pipe to get the final consolidated item rate. |
| 45 | Providing and erecting direction and place identification retro- reflectorised sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area exceeding 0.9 sqm supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm, 2 Nos. firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing and Clause 801 of Specifications for Road & Bridge Works of MoRT&H (5th Revision)... |
| 46 | Providing & fixing Concrete Sign Board as per IRC specification of size 900 x 750 x 37 mm. thick made with RCC 1:1½:3 with pakur variety stone chips reinforced with double layer IRC febric (75 x 75 mm. mesh) and fixed with necessary nuts & bolts on two RC precast posts 100 mm. x 150 mm. of height 2.65 m. of which top 750 mm. is of section 100 x 13 mm. and 1.90 metre above GL & 0.75 metre below GL including digging hole, repacking the same with cement concrete 1:3:6 with jhama khoa or with local stone chips etc.complete including painting two coats on both faces lettering sign marks etc. as per direction of the Engineer-in-Charge. (The rate is inclusive of cost of reinforcement, concrete, shuttering, nuts & bolts, washer etc. complete.) |
| 47 | Boulder 30/45 kgSupply of stone / laterite boulders at site including cost of material, loading, unloading and carriage and including all incidental charges like Royalty, complete. (Royalty certificate in original from concerned authority are to be submitted along with the bill) |
| 48 | Labour charges for bouIder pitching on top and slope by placing required boulders (each weighing 25 Kg. and above within lead of 100 metres and all lifts) including filling the interstices with fragments as required, preparing sub-grade by cutting or filling the earth on slope upto 7.5 cm. depth, watering and ramming where necessary complete as per direction of the Engineer-in-charge.a) Over Jhama Khoa / metal filter/ Geo-textile filter. |
| 49 | Supplying, fitting, fixing end pieces for rectangular / square / circular sausages at the ends, with 10 SWG / 8 SWG G I wire net of different mesh sizes tying & sewing the same maintaning a lap langth of 150 mm all around with 12 SWG G I wire complete, including the cost of supply of wire netting,fitting etc, complete as per direction of the Engineer - in - charge. a) Mesh size 125 mm x 125 mm with 10 SWG wire |
| 50 | Providing and laying pre-cast brick block pitching of required size (53Cm. x 53 Cm, x 25 Cm. or as directed by the Engineer-in-charge ) with1st class kiln burnt bricks in cement mortar including flush pointing onall faces except exposed face which to be plastered with 19 m.m. thickcement plaster , curing, dressing,amming & preparing subgrade inslopes & bed complete with necessary earth work not exceeding 300mm in depth with all leads & lifts including cost of all materials/ blocksup to site by all means of transport. The gap between adjacent blockswill not be more than 10 m.m.(Sand, cement mortar mix for making blocks, pointing & plastering is 1:4 |
| 51 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in charge within a lead of, NB :- Measurement to be taken on the basis of stack measurement / pre- post work section measurement after deduction of void as per norms. No extra payment will be made for stacking.Beyond 500 metre and upto 1.00 km |
| 52 | R.C. Guard post :- Supplying fitting and fixing R.C. guard post 1.37m long with C.C. 1:2:4 with graded stone chips of 13.2mm down casting , curing complete including cost of providing 4nos.of 12mm dia. rod of length 1.54m as main reinforcement and 6 nos. of round shaped 8mm dia rods used as binders; the placing of the first binder should be at 75mm below the top finished surface and the other 5 nos of binders should be placed at 245mm c/c ; the guard post is of octagonal section with inscribed circle of dia 24cm at the base tapering to corresponding dimensions of 16cm at the top including two coats of painting with best quality synthetic enamel paint of approved make and grade to form 6 nos. horizontal alternate bands in white/tannery yellow and black to 90 cm length standing up above ground after mending good damages if any during striking off shuttering, making hole in ground of 47cm depth and 30cm. minimum dia, fixing the guard posts in the same holes and repacking the earth properly so as to keep the guard posts standing properly erect in correct position true to line and length including carriage of R. C. Guard Post with due care to the site including loading into the truck and unloading at site complete in all respect. With Pakur variety stone chips |
| 53 | Supplying Nylon cage netting 1 metre x 1 metre x 1 metre size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. includingcarriage, delivery and stacking at site inclusive of all taxes complete.\\" |
| 54 | Labour charges for dumping and placing in position properly filled in Nylon crates with filled in gunny / poly cement bags (minimum 25 nos. having capacity 50 kg) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge.NB:- Volume of each earth/ sand filled bags should not be less than 0.028 m3\\"Size of Nylon crate is 1metre X 1metre X 1metre.Where boats are not necessary |
| 55 | Making rectangular sausage cage with 10 SWG galvanized iron wire of 125mm. X 125mm. mesh wire netting with proper lapping of minimum 150 mm. including sewing the joints with 12 SWG G I wire and supply of all materials and equipment including placing the sausage cage in position, filling the same with boulder or lump aggregates complete asper direction of the Engineer-in-charge but excluding the cost of boulder / lump aggregates and its carriage upto site.(Cost is excluding the cost of end pieces )0.90 metre x 0.60 metre nominal section |
| 56 | Making rectangular sausage cage with 10 SWG galvanized iron wire of 125mm. X 125mm. mesh wire netting with proper lapping of minimum 150 mm. including sewing the joints with 12 SWG G I wire and supply of all materials and equipment including placing the sausage cage in position, filling the same with boulder or lump aggregates complete asper direction of the Engineer-in-charge but excluding the cost of boulder / lump aggregates and its carriage upto site.(Cost is excluding the cost of end pieces )0.75 metre x 0.45 metre nominal section |
| 57 | Drainage Spouts in Superstructure including providing drip mouldings and also including supplying,fitting and fixing approved type of materials complete as per drawing and Technical specification vide clause no.2705 of MoRT&H’s Specification for Road & Bridge Works. |
| 58 | Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202 for Rural Roads of MORD (c) Above 600 to 900 mm dia Hume pipe |
| 59 | Ordinary Cement concrete (mix1:1.5:3) with graded stonechips (20mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.i) Pakur Variety |
| 60 | Epoxy bonding of new concrete to old concrete |
| 61 | Supplying at site and laying in position UV stabilized polypropylene woven geotextile of 430 gsm as filter, as per specification, including cost of preparing the bed, placing the geotextile as per profile with at least 15cm lapping, wherever required and anchorage at top, sewing /welding the overlapped portion, storage and transportation by all means, complete as per direction of the Engineer-in-charge. (Note: 1. Payment to be made on measurement of finished surface without lapping, but including anchoring length at top. 2. Payment will be made subject to the result of 3rd Party Testing, to be done by the Engineer-in-charge departmentally.) Paragraphs 2.7.7, 2.7.9 and 2.7.10 under the Chapter of “Specification for Works” in the USoR shall be reproduced and included in the tender document as “Specification & Special Terms & Conditions for Geotextile” in case of use of this item in the estimate. 3. This particular item is to be used in special cases, either in continuation of previous usage or after offering adequate justification from techno-economical angles. |
| 62 | Testing of Geo-textile materials including UV Test from well-equipped laboratories like Jadavpur University, BITRA, CIPET etc.) (This item is applicable only for third party testing conducted by the Engineer-in-charge to assure the quality of the Geo-textile material) Please Enable Macros to View BoQ information |