| 1 | Retaining Structures(Civil work) |
| 2 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil |
| 3 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil |
| 4 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) |
| 5 | OD21791/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 340 kg/ cum. Excess or less cement used as per design mix is not payable or not recoverable separately..All work upto plinth level |
| 6 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 7 | OD21790/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 340 kg/ cum. Excess or less cement used as per design mix is not payable or recoverable separately .All work above plinth level up to floor V level |
| 8 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more |
| 9 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete |
| 10 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 11 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. |
| 12 | 22.19.1:Providing and laying APP (Atactic Polypropylene Polymer) modified prefabricated five layer, 3 mm thick water proofing membrane, black finished reinforced with glass fibre matt consisting of a coat of bitumen primer for bitumen membrane @ 0.40 litre/ sqm by the same membrane manufactured of density at 25<sup>0</sup>C, 0.87-0.89 kg /litre and viscocity 70-160 cps. Over the primer coat the layer of membrane shall be laid using butane torch and sealing all joints etc., and preparing the surface complete. The vital physical and chemical parameters of the membrane shall be as under : joint strength in longitudinal and transverse direction at 23<sup>0</sup>C as 350/ 300 N/5 cm. Tear strength in longitudinal and transverse direction as 60/80N. Softening point of membrane not less than 150<sup>0</sup>C. Cold fexibility shall be upto -2<sup>0</sup>C when tested in accordance with ASTM. D - 5147. The laying of membrane shall be got done through the authorised applicator of the manufacturer of membrane :3 mm thick |
| 13 | Building-civil works(Civil work) |
| 14 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil |
| 15 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) |
| 16 | OD20303/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 340 kg/ cum. Excess or less cement used as per design mix is not payable or not recoverable separately..All work upto plinth level |
| 17 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 18 | 22.19.1:Providing and laying APP (Atactic Polypropylene Polymer) modified prefabricated five layer, 3 mm thick water proofing membrane, black finished reinforced with glass fibre matt consisting of a coat of bitumen primer for bitumen membrane @ 0.40 litre/ sqm by the same membrane manufactured of density at 250C, 0.87-0.89 kg /litre and viscocity 70-160 cps. Over the primer coat the layer of membrane shall be laid using butane torch and sealing all joints etc., and preparing the surface complete. The vital physical and chemical parameters of the membrane shall be as under : joint strength in longitudinal and transverse direction at 230C as 350/ 300 N/5 cm. Tear strength in longitudinal and transverse direction as 60/80N. Softening point of membrane not less than 1500C. Cold fexibility shall be upto -20C when tested in accordance with ASTM. D - 5147. The laying of membrane shall be got done through the authorised applicator of the manufacturer of membrane :3 mm thick |
| 19 | OD27378/2025-2026:Random rubble masonry with hard stone in foundation and plinth up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 20 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. |
| 21 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete |
| 22 | OD20457/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 340 kg/ cum. Excess or less cement used as per design mix is not payable or recoverable separately .All work above plinth level up to floor V level |
| 23 | 4.1.10:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 24 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more |
| 25 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts |
| 26 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers |
| 27 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges |
| 28 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform |
| 29 | 5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases) |
| 30 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 31 | Electrification(Electrical work) |
| 32 | 90.1.1.1:Supply and laying medium gauge PVC conduit of the following sizes conforming to IS 9537/1983 Part III in roof slab, jointing the pipes with PVC solvent cement, tying & fixing the conduit firmly with the re-inforcement etc. as required.20 mm |
| 33 | 90.1.1.2:Supply and laying medium gauge PVC conduit of the following sizes conforming to IS 9537/1983 Part III in roof slab, jointing the pipes with PVC solvent cement, tying & fixing the conduit firmly with the re-inforcement etc. as required.25 mm |
| 34 | OD24463/2025-2026:Supply and fixing normal size of 20 mm one way, two way three way, and four way PVC terminal junction boxes confirming to IS 3419/1988along with existing conduit laid in concrete as required. |
| 35 | OD25598/2025-2026: Supply and fixing 20 mm DEEP size 1 way terminal rigid PVC junction box with lid & screw (IS 3419) on roof slab before concreting. |
| 36 | OD25599/2025-2026: Supply and fixing 20 mm DEEP size 2 way terminal rigid PVC junction box with lid & screw (IS 3419) on roof slab before concreting. |
| 37 | OD25600/2025-2026: Supply and fixing 20 mm DEEP size 3 way terminal rigid PVC junction box with lid & screw (IS 3419) on roof slab before concreting. |
| 38 | OD25601/2025-2026: Supply and fixing 20 mm DEEP size 4 way terminal rigid PVC junction box with lid & screw (IS 3419) on roof slab before concreting. |
| 39 | 90.4.1:Supply and installation of suitable size MS rod type fan clamp in the RCC slab as per IS 732 as required. |
| 40 | 90.12.10.2:Supply & laying of DWC pipe in ordinary soil 0.75m below ground level including excavation50/38 mm or nearest size |
| 41 | 90.12.10.7:Supply & laying of DWC pipe in ordinary soil 0.75m below ground level including excavation120/102.5 mm or nearest size |
| 42 | 14.8:Providing and laying in position cement concrete 1 :3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) in foundation of pump, DG set etc. including form work etc. as required. |
| 43 | OD25502/2025-2026:Supply and drawing the following sizes of PVC/Nylon rope 2/3 mm as guide wire in the existing conduit |
| 44 | OD25503/2025-2026:Labour charges for reopening all the junction boxes and terminal point of the existing PVC pipe laid in the concrete including chipping and checking all the conduit with providing all safety measures of Staff including scaffolding etc Please Enable Macros to View BoQ information |