| 1 | Dismantling brick work or stone work in lime or Cement mortar and including stacking of material as directed by E/IC with in a distance of 60 meters (200 feet) but Mud Mortar (SI No. 692) |
| 2 | Class-150 (Non Modular) brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all material, labor T&P etc. required for proper completion of work. (S.No. 6.1.1) |
| 3 | P/L GSB with graded stone ballast with stone grit size stone ballast with hand ramming watering including all material labor T&P etc.all complete (NS) |
| 4 | Providing and laying cement concrete in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete, including cost of form work in foundation and floors. (DSR SN-4.1.3) |
| 5 | supply & laying of 1 sheped (zigzag )precast interlocking tiles of thickness 60 to 100mm (compresssive strength not less then 30mpa and weigth 4.50kg) including 25mm thick local sand base leveling and dressing of surface to requied level and slope, filling joints with local and sand all complete work. 60mm( Rubber molded Grey) |
| 6 | 12mm thick cement plaster in single coat of fair side of single of half brick wall for interior plastering up to floor two level including internal rounded angles chamfers and rounded angles not excluding 80mm in girth and finished even and smooth. No extra for mixing any additive. (c) 1 cement : 4 Coarse sand. (Chapter No. 13 S.I. No.-582(ii)) |
| 7 | Finishing walls with exterior emulsion paint (Apex) of approved brand and manufactured and of required shade and undecorated wall surface to give even shade over @ 1.25 Ltr/10sqm including one coat of primer applied @ 0.75Ltr./10sqm coat curing and cost of all material, labour, T&P etc. required for proper completion of work for two coat. |
| 8 | Earth work in Filling in ordinary Soil (Loam, Clay or sand) including, lift up to 1.50 M and lead up to 30 M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge up to a distance of 30 M form the foundation trenches. Including royalty. (SI No. 251) |
| 9 | Supply & fixing of precast Rainforced R.C.C. benches with 02 year warrenty etc. all complete. |
| 10 | Mild steel or iron work in heavy sizes such as trusses. Built up gates record rack, roof work. Gates etc. brought to required form including drilling holes riveting or welding where necessary and also including supply of steel, bolts, nuts wastage etc. and their fixing required for proper completion of the work (SI No. 503) |
| 11 | Carriage of Ballast, Kankar, Coal, Grit or Sand etc. by head load up to 90 meters (3 Chain only) including loading & unloading but excluding stacking. (Chapter–3 Sr. No.–234) |
| 12 | Installation of 1.50 H.P. ISI marked sumbercible pump etc…… all complete. (As per Attache Annalysis) |
| 13 | Supply/Fixing of Black Granite Stone work display board. (NS) |
| 14 | Sub Total (A) |
| 15 | Add/Deduction Rs. For Estimate Figure Amount Match |
| 16 | Grand Total Please Enable Macros to View BoQ information |