| 1 | Part 1: Construction of New Community Centre Near Bus stop at Alagapuri H/O A.KalaiyamputhurEstimate Amount: Rs.30.00 Lakhs |
| 2 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation. |
| 3 | Drilling holes in hard granaite 32mm dia meter (Sh.Rate-Unique code-W-0053, Page no-362) |
| 4 | Supplying and fabrication of steel rods including cost & conveyance of steel as per std. Specification etc., complete. 16mm rod |
| 5 | SDR - (Not Requiring Blasting) Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Soft disintegrated rock, laterite, soft rock or kankar, not requiring blasting (Sh.Rate-Unique code-W-0062) |
| 6 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. |
| 7 | Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete |
| 8 | Reilling the excavated earth other than sand including cost,conveyance and filling charges etc.,as per standard specifications etc.-1 m3 |
| 9 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 10 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. |
| 11 | RCC 1: 1 1/2:3 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete. |
| 12 | Supply & erection of centering for sides & soffits of all R.C.C. works including cost& conveyance of all materials to site and all labour charges etc., complete. |
| 13 | Supplying and fabrication of steel rods including cost & conveyance of steel as per std. Specification etc., complete. |
| 14 | Towards the cost of Rolling shutter of size 2.50m x 2.10m including all charges etc. (Sh.Rate-Unique code-M-0401, Page no-85) |
| 15 | Towards the cost of Steel Window of size 1.20m x 1.20m including all charges etc. |
| 16 | Supplying and fixing in position best quality PVC Rain water pipe having ISI mark and providing leak proof joints including fixing to the wall with special PVC/MS clamps including all etc.,complete |
| 17 | Plastering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials & all labour charges etc., complete. |
| 18 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials & all labour charges etc., complete. |
| 19 | Paving the floor with best approved quality fine polished Granite Stone Slabs of size 1200 x 600 of 18 / 20mm thick of Synthetic Grey, Paradise and similar varieties with machine cut edges laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three crushed stone M.Sand) fixing the slabs with required cement slurry and laid in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments etc., |
| 20 | Weathering course concrete using best quality of broken jelly of size 20mm uniform gauge in pure slaked lime (no sand to be used) over the RCC Roof slab in the proportion of brick jelly to lime being 32:12:1/2 by volume includingcost and conveyance of all materials to site and all labour charges etc.,complete for 10 m3 |
| 21 | Finishing the top of roof with one course of machine pressed tiles of size 23cmx23cmx2cm of approved quality laid in cement mortar 1:3 mix to 12mm thick mixed with water proofing compound confirming to ISS by 2% weightof cement used and the joint pointed |
| 22 | Supply ing and appl ying of two coats of p utty of 3 mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. Tt shall then be sand papered (waterproof abrasive sheet) to give a smooth and even s urface. Any uneven ness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty alter 6hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) th e same arte r it is dry and finishing the surface smoothIy, etc., complete |
| 23 | Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work). |
| 24 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 25 | Supplying and painting two coats new iron work such as steel doors ventilators, window bars etc., (WITHOUT PRIMER) |
| 26 | Provision for Electrification arrangements |
| 27 | Wiring with 2 x 1.5 sq.m (22/0.3) PVC insulated unsheathed SC Cu. Conductor of 1100V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories with TW switch box in flush with wall covered with hylum sheet of 3mm thick with painting of suitable colour for open PVC light point/fan point(for electronic regulator) - S.D.No: 25 |
| 28 | Wiring with 2 x 1.5 sq.m (22/0.3) PVC insulated unsheathed SC Cu. Conductor of 1100V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories and with 150 x 100 x 113 TW switch box for 5A 3pin non inter locking CS plug with painting of suitable colour with continuos earth wire connection of 14 SWG TC wire for open PVC plug - S.D.No: 38 |
| 29 | Supply and fixing of fancy glass shade and 15 W LED Bulb including cost and conveyance of all materials and labour charges etc complete. SD 80 |
| 30 | Supply and fixing of WT bulk head fitting with guard suitable for 15 W LED Bulb including cost and conveyance of all materials and labour charges etc complete. SD 83 |
| 31 | Supply and fixing of 1200mm (48\") AC ceiling fan with stepped electronic 300 W regulator with 1 meter down rod on the existing clamp. - S.D.no: 106 |
| 32 | Supply and fixing of 16 Amps DPIC Switch of 500V with fuse and neutral (Side Handle) on suitable TW Board, with earth connection only. - S.D.No: 142 |
| 33 | Supply and fixing of TNEB meter Board suitable for 32A Single phase service connection with 32A fuse unit(500V) 32A neutral link and earth link (1\"x1/8\" Copper flat) on TW plank of size 375mmx300mmx19mm with supporting TW reepers of 1\" thick an either side with painting with suitable bolt and nuts for fixing the TW plank on wall with earth connection and inter connection with 7/20 PVC insulated copper wire from EB meter to fuse unit - SD No: 125 |
| 34 | Supply and run of 2 of 1.50 sq.mm (22/0.3) PVC insulated SC unsheathed Cu.Conductor of 1100 V on 7/20 GI bearer wire for service connection mains. - S.D.No: 64 |
| 35 | Supply and run of 2 x 1.5 sq.mm. (22 / 0.3) PVC insulated single core unsheathed copper conductor of 1100V grade in 25mm dia GI pipe (Class \"B\") suitably bent at both ends with necessary angle iron upright and end supports for mains (SD No: 69) |
| 36 | Provision for EB Deposit amount charges |
| 37 | Provisions for Name board charges |
| 38 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} Please Enable Macros to View BoQ information |