|
| 1 | 1. Renovation of Community Hall Building for Disabled Welfare Office at Kottur Panchayat office Campus in Kottur Panchayat. |
| 2 | Dismantaling of Ceiling Plastering Including all labour Charges and removing depris from the work site etc, complete.,… |
| 3 | Dismantaling of Wall Plastering Including all labour Charges and removing depris from the work site etc, complete.,… |
| 4 | Dismantaling of Brick Work CM 1:5 using country bricks size Including all labour Charges and removing depris from the work site etc, complete.,… |
| 5 | Dismantaling of Damaged Pressed tiles Including all labour Charges As per standard Specification |
| 6 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 7 | Supplying and filling with filling sand in layers not more than 15 cm thick ,well rammed, wattered and compacted etc,complete For Foundation |
| 8 | Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation |
| 9 | Brick work with cement mortar 1:5 mix using II class bricks for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete.(Below basement) |
| 10 | Ceiling Plastering with CM 1:3,10mm thick. complete complying with standard specifications and as directed by the departmental officers. |
| 11 | Plastering with CM 1:5,12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. |
| 12 | Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum |
| 13 | Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers |
| 14 | Repair to door including all cost of convenyence,. and all labour charges etccomplete,. |
| 15 | New Door (1.80 x 2.10 M) |
| 16 | Repair Door (1.10x 2.10 M) |
| 17 | Repair Window (1.20 x 1.20 M) |
| 18 | New Toilet Door (0.60x 1.80 M) |
| 19 | Store Room Door (0.75 x 1.80 M) |
| 20 | Supply and fixing of EWC including cost and conveyence of all cherges etc. complete. |
| 21 | Dadooing with glazed tiles of size 150x150x6mm including cost and conveyance of all materials to site and all labour charges etc complete |
| 22 | Paving the Floor with Ceramic tiles 30x30x6mm thick including cost and conveyance of all materials to site and all labour charges etc complete |
| 23 | Providing and fixing Aluminium composite panal (ACP) 3 Side having 50 x 25 x 1.50mm frame wor vertical and horizotals out of specially designed |
| 24 | White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. |
| 25 | Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete |
| 26 | Distempering two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete |
| 27 | Painting two coats over Old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete |
| 28 | Painting two coats over new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete |
| 29 | Electrical Work :- |
| 30 | Light Point |
| 31 | Fan Point |
| 32 | Tube Light Fitting |
| 33 | Plug point |
| 34 | Provision for Exhaust Fan |
| 35 | Provision for Wash basin Charges |
| 36 | Provision for Rain Water arrangements Charges |
| 37 | Provision for Water supply & Plumbing Charges |
| 38 | Provision for Ramp Handrail Charges |
| 39 | Provision for Rain Water arrangements |
| 40 | GST Amount for providing Service to Government Contract Works for the above works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column \"BB\" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) Please Enable Macros to View BoQ information |