| 1 | ELECTRIFICATION |
| 2 | 90.2.1.1:Supply and wiring points according to IS 732-1989 using rigid PVC conduit of minimum size 20 mm with specials conforming to IS 9537 part III 1983 and with suitable size specials conforming to IS 3419-1988, fixing the conduit using metal saddles spacing not exceeding 50 cm or concealed suitably and with 1.00 sq mm FRLS PVC insulated stranded single core copper conductor cable 650V grade, including providing switch board main and continuous earthing with No.14 SWG bare copper,required quantity of copper earth socket, brass bolt and nut crimping/ soldering etc complete with suitable size modular type metal switch boxes, modular type front plates (white) etc. up to and including 6A modular type SP switches and making good the surface of wall, colour washing etc. complete. All the terminations in the switch boards and DB's shall be tinned and the wires shall be drawn and fixed along the periphery of the box using suitable ties, tie mounts etc as required. (RoHS compliant modular accessories).Single Control light point with 6A, plate ceiling rose - Short point |
| 3 | 90.2.1.4:Supply and wiring points according to IS 732-1989 using rigid PVC conduit of minimum size 20 mm with specials conforming to IS 9537 part III 1983 and with suitable size specials conforming to IS 3419-1988, fixing the conduit using metal saddles spacing not exceeding 50 cm or concealed suitably and with 1.00 sq mm FRLS PVC insulated stranded single core copper conductor cable 650V grade, including providing switch board main and continuous earthing with No.14 SWG bare copper,required quantity of copper earth socket, brass bolt and nut crimping/ soldering etc complete with suitable size modular type metal switch boxes, modular type front plates (white) etc. up to and including 6A modular type SP switches and making good the surface of wall, colour washing etc. complete. All the terminations in the switch boards and DB's shall be tinned and the wires shall be drawn and fixed along the periphery of the box using suitable ties, tie mounts etc as required. (RoHS compliant modular accessories).Single control ceiling fan point with 6 A, 3 plate ceiling rose & with socket size stepped electronic regulator. - Short point |
| 4 | 90.2.1.6:Supply and wiring points according to IS 732-1989 using rigid PVC conduit of minimum size 20 mm with specials conforming to IS 9537 part III 1983 and with suitable size specials conforming to IS 3419-1988, fixing the conduit using metal saddles spacing not exceeding 50 cm or concealed suitably and with 1.00 sq mm FRLS PVC insulated stranded single core copper conductor cable 650V grade, including providing switch board main and continuous earthing with No.14 SWG bare copper,required quantity of copper earth socket, brass bolt and nut crimping/ soldering etc complete with suitable size modular type metal switch boxes, modular type front plates (white) etc. up to and including 6A modular type SP switches and making good the surface of wall, colour washing etc. complete. All the terminations in the switch boards and DB's shall be tinned and the wires shall be drawn and fixed along the periphery of the box using suitable ties, tie mounts etc as required. (RoHS compliant modular accessories).Combined plug point with 6 A, 5 pin plug socket controlled by 6 A, switch in the same switch board as that of light points |
| 5 | 90.3.20.3:Supply & installation of light fittings on TW round block Supply, conveyance installation testing and commissioning the light fittings of following types made of CRCA with 0.5mm thickness complete with all accessories and lamps etc. directly on wall or ceiling with PVC round block neatly painted to suit the fitting and giving connection with required length of 16/0.20mm 3 core copper conductor flex wire conforming to relevant ISS and giving connections as required.1200 mm 1X20W LED Lamp with box type fixture |
| 6 | 90.4.5.4:Supply, Installation, testing and commissioning of ceiling fan of following sizes including wiring the down rods of standard length (up to 30 cm) with 1.5 sq. mm FRLS PVC insulated, copper conductor, single core cable etc. as required.1200mm sweep - ceiling fan complete with service value minimum 4.0(cub meter/minute/Watt), Air delivery minimum 210(cubic meter/minute), Copper winding suitable for 230V/240V single phase AC supply |
| 7 | 90.4.2:Supply and installation of suitable size MS belt type fan clamp fabricated from flat iron 40 x 6 mm, 150mm long x 2 Nos with M.S. rod bent to shape, neatly painted with 2 coats of enamel paint over a coat of red oxide primer as per IS 732 as required. |
| 8 | 90.11.1.11:Supply and installation of sheet steel, phosphatised and painted, dust and vermin proof enclosure of MCB DB including copper /brass bus bar, neutral link, earth bus and DIN rail suitable for fixing MCB/ isolator etc. fixed on wall using suitable anchor bolts or fixed in recess including cutting hole on the wall , making good the damages, colour washing etc. as required6 way (8+18) - three phase double cover (IP 42/43) |
| 9 | 2.10.1:Supplying and fixing 5A to 32 A rating, 240/415 volts, 10 kA, \"\"C\"\" curve, miniaturecircuit breaker suitable for inductive load of following poles in the existing MCBDB complete with connections, testing and commissioning etc. as required.Single pole |
| 10 | 2.10.4:Supplying and fixing 5A to 32 A rating, 240/415 volts, 10 kA, \"\"C\"\" curve, miniaturecircuit breaker suitable for inductive load of following poles in the existing MCBDB complete with connections, testing and commissioning etc. as required.Triple pole |
| 11 | 2.11:Supplying and fixing single pole blanking plate in the existing MCB DB complete etc. as required. |
| 12 | 2.13.1:Supplying and fixing following rating, four pole, 415 volts, isolator in the existing MCB DB complete with connections, testing and commissioning etc. as required.40 amps |
| 13 | 2.15.2:Supplying and fixing following rating, four pole, (three phase and neutral), 415volts, residual current circuit breaker (RCCB), having a sensitivity current 30milli Amperes in the existing MCB DB complete with connections, testing andcommissioning etc. as required.40 amps |
| 14 | 90.12.7.40:Supply, laying and clamping of 1 no. PVC insulated and PVC sheathed armoured aluminium power cable, 1.1 KV grade of the following sizes using clamps noted along with the cables, spacing of clamps not exceeding 60cms, making good the damages , colour washing etc. as required.4 core 10 sq mm with factory made clamp |
| 15 | 90.16.1.2:Supply and drawing bare earthing conductors of the following sizes along with wiring/ cables and giving connection as required2.65 mm copper conductor (12 SWG) |
| 16 | 9.1.32:Supplying and making end termination with brass compression gland and aluminium lugs for following size of PVC insulated and PVC sheathed / XLPE aluminium conductor cable of 1.1 KV grade as required.4 X 10 sq. mm (25mm) |
| 17 | 4.1.2:Supplying and installing following size of perforated painted with powder coatingM.S. cable trays with perforation not more than 17.5%, in convenient sections,joined with connectors, suspended from the ceiling with M.S. suspendersincluding bolts & nuts, painting suspenders etc as required.150 mm width X 50 mm depth X 1.6 mm thickness Please Enable Macros to View BoQ information |