|
| 1 | Earthwork in foundation excavation up to1.5m, ramming bressing both sides backfilling and dosposal of surplus soil within lead of 50m |
| 2 | Cement concrete in foundation and plinth with stone ballast size 40 mm including curing and compaction etc in 1:4:8 mix |
| 3 | Brick work in foundation and plinth using brick of class designation 75 in CM 1:6 |
| 4 | DPC with RCC 1:1:5:3 mix |
| 5 | Brick work in Superstructure using brick of class designation 75 in CM 1:6 |
| 6 | reinforced cement concrete work including curing compaction , finishing with rendering in cement sand martar 1:3 and making goods and joints excluding cost of centering shutiering and reinforcement in 1:1:5:3 |
| 7 | Providing and fabricating reinforcement for RCC work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) in foundationand super structure up to 4.5m height aboveplinth level hot rolled deformed (IS: 1139) cold twisted (IS: 1786) bars |
| 8 | Centering and shuttering with plywood or steelsheets including strutting, propping, bracingboth ways with wooden members andremoval of from work |
| 9 | p&f cement concrete on roof |
| 10 | Mosaic Tiles on roofing |
| 11 | 12mm thick plaster on new work including curing and racking of joints in cm1:4 |
| 12 | extra for celling plaster on roof in cm1:4 12mm thick |
| 13 | 20mm thick plaster 1:6cm including curing and racking of joints. Etc. |
| 14 | Providing and applying white cement basedputty over plastered surface to prepare thesurface even and smooth complete (PWDBSR-2022 - Less-10%) |
| 15 | Finishing walls with Acrylic Smooth exteriorpaint of required shade including all scaffolding.New work ( Two or more coat incuding base coat of water proofing cementpaint) -(PWD BSR -2022 Less-10%) |
| 16 | Wall painting with plastic emulsion paint of required shade including all caffolding.New work ( Two or more coat incuding base coat ofwater proofing cement paint) -(PWD BSR-2022 Les-10%) |
| 17 | s&f iron door |
| 18 | Providing and fixing steel glazed doors windows and ventilator shutters of standard rolled steel section (IS 1038-1983): (PWD BSR-2022Less-10%) |
| 19 | s&f wire mesh on section window |
| 20 | s&f iron grill on window |
| 21 | enamel painting ondoor and window |
| 22 | earth work in filling with ordinary soil |
| 23 | carriage of earth lead 1 km |
| 24 | Cement concrete in foundation and plinth with stone ballast size 40 mm including curing and compaction etc in 1:6:12 mix |
| 25 | s&f polished kota stone flooring |
| 26 | wiring for fan/light points in pvc condut pipe as per specification |
| 27 | wiring for circuit/submain as per specification |
| 28 | yojna board and contigency charges between pipe & flange, rubber washer & nut bolts etc. complete in all respect. 80mm dia Please Enable Macros to View BoQ information |