| 1 | Work contract schedule |
| 2 | Excavation of Pole pit upto 27\" (8.0M) Poles |
| 3 | Excavation of Stay pit 4.5\" to 5\" Depth |
| 4 | Excavation of pole pit above 27\"poles |
| 5 | Escavation of Pole pit in Hard rock requires blasting |
| 6 | Erection of PSC Poles upto 8.0 M |
| 7 | Erection of PSC Poles upto 9.14 M |
| 8 | Erection of stay set complete |
| 9 | Fixing of HT/LT TI Fittings |
| 10 | Fixing of HT \"V\" X arms/ Channel X arms,Guarding X arms |
| 11 | Fixing of HT Pin Insulators - 11 KV |
| 12 | Fixing of HT 11 KV Strain disc |
| 13 | Fixing of LT 1 -phase X arm |
| 14 | Fixing of LT 3 -phase X arm |
| 15 | Fixing of LT Pin insulators |
| 16 | Fixing of Shackle |
| 17 | Fixing of Knob |
| 18 | Paving , Stringing, Binding & Jumpering of ACSR 7/3.35 & AAAC 7/3.15 mm |
| 19 | Paving , Stringing, Binding & Jumpering of ACSR 7/2.59 mm & ACSR 7/2.11 mm AAC 7/2.50 |
| 20 | Transport of poles/Materials/ Conductors (Excluding loading & Unloading charges) Below 8 Kms |
| 21 | Loading materials |
| 22 | Unloading materials |
| 23 | Loading of PSC pole 24\" & 27\" |
| 24 | Unloading of PSC pole 24\" & 27\" |
| 25 | Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual up to 100 m |
| 26 | Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual beyond 100 m |
| 27 | Cutting of Coconut Leaves (per tree) |
| 28 | Clearing of Branches of Tree |
| 29 | Labour charges for alteration of Back clamp |
| 30 | Labour charges for alteration of Stay clamp |
| 31 | Labour charges for Drilling of hole in channel only 3/4\" & 1\" per hole |
| 32 | Labour charge for Cutting of Channel |
| 33 | Earthing of pole |
| 34 | Dismantling of Pole 8.0 Mtr |
| 35 | Releasing of grill |
| 36 | Re-Sagging ACSR 7/2.59mm /AAAC 7/2.50 mm Weasel and ACSR 7/2.11 mm Conductor |
| 37 | Releasing of 3 phase service and refixing |
| 38 | Releasing of 1 phase service and refixing |
| 39 | Dismantling of HT V Cross arms(all type) |
| 40 | Dismantling of HT 11 KV Pin Insularors |
| 41 | Dismantling of HT 11 KV Strain Disc |
| 42 | Dismantling of HT/LT TI Fitting |
| 43 | Dismantling of LT 1 PH X arm |
| 44 | Dismantling of LT 3 PH X arm |
| 45 | Dismantling of LT Shackle |
| 46 | Dismantling of LT Pin insulators |
| 47 | Dismantling of Alu Knob |
| 48 | Dismantling of Stay set complete |
| 49 | Dismandling of ACSR 7/3.35mm |
| 50 | Dismandling of ACSR 7/2.59mm/ 7/2.11mm conductor |
| 51 | Erection of Single Pole Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Nos. Earth pit with collar including painting of metal parts, structure poles, fixing of tapping channel, transformer bed structure including concreting (Except erectionof Transformer) |
| 52 | Loading and Unloading of Transformer above 63 KVA and upto 250 KVA |
| 53 | Erection of New Transformer all Capacities (With Jumpering) |
| 54 | G.S.T. @18% should be Entered by the Bidder Please Enable Macros to View BoQ information |