| 1 | Safe carriage of following material from store to work site including safe loading & unloading at both end (0 to 50 km.) |
| 2 | Round Pole 09 Mtr/11 Mtr. Lone |
| 3 | PCC Pole 8.5 Mtr./ 09 Mtr. |
| 4 | PCC Pole 11 Mtr. |
| 5 | 25 KVA distribution Transformer |
| 6 | 63 KVA /100 KVA distribution Transformer. |
| 7 | Line material |
| 8 | Weasel/Dog Conductor |
| 9 | Distribution Box |
| 10 | LT ABC Conductor 1x25 + 1x16 sqmm |
| 11 | LT ABC Conductor 3x50 + 1x35 +1x16 sqmm |
| 12 | LT ABC Conductor 3x95 + 1x70 +1x16 sqmm |
| 13 | LT ABC Conductor 3x120 + 1x70 +1x16 sqmm |
| 14 | LT XLPE cable 1x70 sqmm |
| 15 | LT XLPE cable 1x120 sqmm |
| 16 | LT XLPE cable 3.5x50 sqmm |
| 17 | LT XLPE cable 3.5x70 sqmm |
| 18 | LT XLPE cable 3.5x150 sqmm |
| 19 | 11 KV XLPE 3x70, 3x120, 3x185 sqmm |
| 20 | Fuse Set |
| 21 | 11 KV Metering cubical |
| 22 | C.T./P.T. Combined unit |
| 23 | Erraction of following pole including fixing with all accessories with fabrication of angle/channel (Stone pad, nut, bolt and clamp will be provided by contractor). |
| 24 | PCC 8.5 Mtr./9 Mtr. Pole |
| 25 | PCC 11 Mtr. Pole |
| 26 | Round Pole |
| 27 | Double Pole |
| 28 | Grouting of Pole with Cements, Sand, Brick, CC Rato 1:4:5 as per RESPO Normes (Grouting Material will be Provided By the contracter). |
| 29 | Laying of LT ABC Conductor 1x25 + 1x16 sqmm |
| 30 | Laying of LT ABC Conductor 3x50 + 1x35 +1x16 sqmm |
| 31 | Laying of LT ABC Conductor 3x95 + 1x70 +1x16 sqmm |
| 32 | Laying of LT ABC Conductor 3x120 + 1x70 +1x16 sqmm |
| 33 | Laying of LT XLPE cable 1x70 sqmm |
| 34 | Laying of LT XLPE cable 1x120 sqmm |
| 35 | Laying of LT XLPE cable 3.5x50 sqmm |
| 36 | Laying of LT XLPE cable 3.5x70 sqmm |
| 37 | Laying of LT XLPE cable 3.5x150 sqmm |
| 38 | Laying of 11 KV XLPE 3x70, 3x120, 3x185 sqmm |
| 39 | Sagging and binding of weasel/Dog conductor. |
| 40 | Mounting of 25 KVA T/F on Double Pole and Meaking Proper HT/LT connection with fuse set (Nut, Bolt, Clampes, Lugs Will be Provided by The contractor). |
| 41 | Mounting of 63, 100 KVA T/F on Double Pole and Meaking Proper HT/LT connection (Nut, Bolt, Clampes, Lugs Will be Provided by The contractor). |
| 42 | Filling of Cable box outdoor/indoor |
| 43 | Installation and commissioning of distribution box |
| 44 | Errection fo 11 KV Fuse Set |
| 45 | Mounting and commissioning of CT/PT combind unit |
| 46 | Fixing of 11 KV Metering Cubicle as per norms. |
| 47 | Providing and fixing of Danger Board/Number Plate with clamp |
| 48 | Providing and fixing of LT Fuse box unit at 25/63/100 KVA T/F |
| 49 | Dismentiling of following materials and carrage of materials from site to JE Store inculding safe loading and unloading at both ends as per site condition - |
| 50 | ST Pole old and used |
| 51 | Old 10 KVA/25 KVA T/F |
| 52 | Old 63 KVA T/F |
| 53 | ACSR Weasel scrap |
| 54 | Iron Scrap Please Enable Macros to View BoQ information |