|
| 1 | M&L for prepration of old surfaces of walls including brooming down or steel wire brushing; scraping down smoke soot, moulds, moss and efflorescent and trading oil and greasy spots etc (Plastered or unplastered surfaces) and applying one coat of white (lime) wash complete all as specified and directed. |
| 2 | All as per item No 01 above but one coat of white wash on ceilingcomplete. |
| 3 | M&L for prepration of old surfaces of walls including brooming down or steel wire brushing; scraping down smoke soot, moulds, moss and efflorescent and trading oil and greasy spots etc (Plastered or unplastered surfaces) and applying one coat of oil bound distemper with filling uneven surface by white wall putty complete all as specified and directed. |
| 4 | Complete removal of existing treatment of walls, washing, rubbing down and stopping of distempered and painted surfaces and applying two coats of oil bound distemper over a coat of primer overa coat of wall putty(3mm thick) complete all as specified and directed.. |
| 5 | Complete removal of existing treatment of walls, washing, rubbing down and stopping of distempered and painted surfaces and applying two coats of plastic emulsion paint over a coat of primer over a coat of wall putty (3mm thick) complete all as specified and directed.. |
| 6 | M&L for prepration of old surfaces of walls including brooming down or steel wire brushing; scraping down smoke soot, moulds, moss and efflorescent and trading oil and greasy spots etc (Plastered or unplastered surfaces) and applying one coat of cement based paint complete all as specified and directed. |
| 7 | Complete removal of existing treatment of walls by sander, washing, rubbing down and stopping of distempered and painted surfaces and applying two coat of cement based paint complete all as specified and directed.. |
| 8 | M&L for prepration of old surfaces of brick/concrete/asbestos sheet like kerb stone or any other type of surface including brooming down or steel wire brushing; scraping down smoke soot, moulds, moss and efflorescent and trading oil and greasy spots etc (Plastered or unplastered surfaces) and applying one coat of synthetic enamel paint complete all as specified and directed. |
| 9 | M&L for complete removal of existing treatment of old decorated walls by sander, scraping down smoke soot, moulds, moss and efflorescent and trading oil and greasy spots etc (Plastered or unplastered surfaces) etc and applying two coats ofacrylic exterior emulsion paint over a coat of wall primer including filling uneven surface withputty complete all as per manufacturer instruction and as specified and directed by Engr-in-Charge. |
| 10 | M&L for prepration of old wooden surfaces of any description not otherwise described over 10 cm width or grith and applying one coat of synthetic enamel paint complete all as specified and directed. |
| 11 | M&L for prepration of old steel surfaces of any description not otherwise described over 10 cm width or grith and applying one coat of synthetic enamel paint complete all as specified and directed. |
| 12 | Taking down cement plaster or cement lime plaster on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc any description complete all as specified and directed. |
| 13 | M&L for Plastering 5mm thick in cement mortar (1:3) finished even and smooth without using extra cement as on ceiling complete all as specified. |
| 14 | M&L for 15 mm thick rendering in cement mortar 1:4 on fair faces of brick or concrete walls, finished even and fair without using extra cement to match with the existing surfaces. |
| 15 | M&L for 15 mm thick rendering in cement mortar 1:6 on fair faces of brick or concrete walls, finished even and smooth without using extra cement to match with the existing surfaces. |
| 16 | M&L for prepration of new surfaces of ceiling including cornices, pilasters etc and applying three coats of white (Lime) wash complete all as specified and as directed. |
| 17 | M&L for prepration of new surfaces of walls including cornices, plasters etc and applying two coats of cement base paint complete all as specified and directed. |
| 18 | M&L for prepration of new plaster surfaces of walls and applying two coats of oil bound distemper over a coat of primer on plastered surfaces over a coat of wall putty complete allas specified. |
| 19 | Disconnecting float valve with float arm from PVC service water tank of any capacity, empting stored water through wash outlet, cleaning and removing all scale and dirt, etc. from tanks and from mouths of circulating pipes, etc. and finally washing the internal surfaces with bleaching powder, closing wash outlet, re fixing float valve in proper position, closing the top cover including minor repair if required and testing complete including writing in stencils “Cleaned on:_____(Date)” 3” height on outer face of tank with white paint of capacityof any capacity complete all as directed. |
| 20 | S&F in repairs 20mmfor ball valve brass high pressure, with polythene float and fly nut complete screwed for iron pipe or brass ferrule and fixed. |
| 21 | S&F 500 ltr cap white colour rotational moulded polythylene water storage tank antimicrobial, triple layer (Cylindrical vertical with closedtop) hosted and fixed in position incl dismantling of existing tank of any description complete all as specified.Make:- Sheetal/ Rotex |
| 22 | S&F 1000 ltr cap white colour rotational moulded polythylene water storage tank antimicrobial, triple layer(Cylindrical vertical with closedtop) hosted and fixed in position incl dismantling of existing tank of any description complete all as specified.Make:- Sheetal/ Rotex |
| 23 | Uprooting of trees,grass,bushes etc from brick wall/roof tiles or any surfaces of bldg including dismantling the requried brick work /rooftiles/mud concrete etc for uprooting the vegetation etc and make good the same to match existing surfaces with same material or concrete 1:2:4 type B-1 after pouring the chemical (which destroy the growth of vegetation to place where vegetation removed).The rate shall include for scaffolding or any other arrangment required during this process upto 10 mtr height complete all as specified |