| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.Depth upto 1.5 m |
| 2 | Carriage ofMaterials by mechanical transport including loading, unloading and stacking ::Earth 2 km |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). |
| 4 | Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 5 | Random rubble dry stone Kharanja (soling) under floor. |
| 6 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level :1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 7 | Brick work with FPS bricks of class designation 75 in superstructure above plinth level upto two stories in all shapes and sizes in :Cement mortar 1:4 (1 cement : 4 coarse sand) |
| 8 | Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform. |
| 9 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete. Mild steel and Medium Tensile steel bars. |
| 10 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20mm nominal size) |
| 11 | Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 12 mm cement plaster of mix 1:6 (1 cement : 6 fine/ coarse sand) |
| 12 | Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix 1:6 (1 cement : 6 fine/ coarse sand) |
| 13 | Kota stone slab flooring 25mm thick over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse sand) :Area of each slab 2001 to 5000 sqcm |
| 14 | Providing and laying brick tiles of class designation 100 over mumty roofs grouted with cement mortar 1:3 (1 cement : 3 fine sand) mixed with 2% of integral water proofing compound by weight of cement, over a 12 mm layer of cement mortar 1:3 (1 cement : 3 fine sand) and finished neat With F.P.S. brick tiles |
| 15 | Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade: Two or more coats on new work |
| 16 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two or more coats on new work |
| 17 | Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6mm angle iron and 3mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using M.S. angels 40x40x6 mm for diagonal braces. |
| 18 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete: Please Enable Macros to View BoQ information |