| 1 | M&L for Inspection,servicing ,checking by authorised Representative ofBlue Star Companyof all connections of control wiring of microprocessor based AC compressors and compressor panel ,testing and calibration of compressor through panel for loading and unloading test on required set temprature(as specified by the user) of the compressor and some other priodical tests required of the plant as per menufaturer guideline for smooth functioning of plant and submit the test report and their recommendation/suggetions for better performance of (85 TR) Plants on their standard formatecomplete. all as specified and directed by Engineer-in-Charge. |
| 2 | Descaling of condenser of 85TR Make BlueStar incl all connected piping etc. with -MEC solution incl roding, brushing including replacements of gaskets all as per site requirement complete all as specified and directed. |
| 3 | M & L for cleaning, servicing, overhauling all component of Air Handling Unit including dismantling of side panel where as required,cleaning of heating & cooling coil with caustic soda solution, including welding/brazing, wherever required to arrest leakages, cleaning of Pre-Micro filters, replacing of vertical GI sheet supports, replacement of U/S foam insulation of best quality using adhesive substance to avoid cold air leakages,greasing of bearing and re-assembling all the dismantled components and other packing material to its original position asexisting etc, with and including testing, commissioning of air handling unit of size up to 10000 CFM at optimum efficiency, complete all as specified and directed. |
| 4 | M & L for cleaning, servicing, overhauling all component of Air Handling Unit including dismantling of side panel where as required,cleaning of heating & cooling coil with caustic soda solution, including welding/brazing, wherever required to arrest leakages, cleaning of Pre-Micro filters, replacing of vertical GI sheet supports, replacement of U/S foam insulation of best quality using adhesive substance to avoid cold air leakages,greasing of bearing and re-assembling all the dismantled components and other packing material to its original position asexisting etc, with and including testing, commissioning of air handling unit of size up to 10000 CFM to 20000 at optimum efficiency, complete all as specified and directed. |
| 5 | Material and Labour for Removing scale/sludge precipitated in the HWG Tank on the heating element and pipe, circulating the descaling solution in the pipe through the circulating pump and allows holding it for 30 minutes for chemical reaction. Ensure that descaling process has been completed , circulate clean water in the pipe continue till satisfaction of Engr-in-Charge testing complete of capacity upto 200 Kilowatt |
| 6 | Material and labour for Nitrogen leak test entire system of the AC plant of Cap upto 170 TRwith Nitrogen gas. If found any leakage or reduction in the scale of pressureshall located and arrest the leakage immediately by soldering or an appropriate measure are to be taken to top the leakage permanentlycomplete all as specified & directed by Engr-in-Charge. |
| 7 | Servicing & cleaningofthe cooling tower of capacity up to 170 TR by applying wire brush, washing powder and other solvent by removing the deposited impurities such as silt, dust particles mud/ sand inside the dume and around the fins, cleaning of base tray & grills, pot stainer, main shaft etc. and other connected items, servicing of fan motor including changing of bearingsand greasing refixing the fan, frill & top cover including painting of cooling tower with approved colour by scrapping outer sludges/paintcomplete all as directed by Engr-in-charge all as specified and directed by Engineer-in-Charge. |
| 8 | Material and labour for descaling of complete condenser units Quarterly for central/ package type AC plants of following capacities by means of adding descaling chemical solution (HCL) or equivalent into the cooling tower sump as per requirements, and running the plant pump continuously till all the scale of pipes/shell are removed including removing side covers of condenser and cleaning the water tubes by means of nylon brushes till the scaling is removed and re fixing of covers including replacement of neoprenerubber gasket and refixing pipe connection etc. all as specified and directed to complete satisfaction of engineer-in-charge.(a)Central AC Plant up to 170 TRNote : Qty of descalling will be measured in each quarter at interval of not less than 90 days |
| 9 | M & L for repairs of motorised fire/smoke dampers, supply/return air damper including replacement of controller for operation of motorised fire damper and control wiring, the damper shall be motorized and spring return so as to close the damper in the event of power failure automatically and open the same in case of power being restored. The spring return action shall be inbuilt mechanism and not externally mounted. The damper shall also be closed in the event of fire signal complete as required. |
| 10 | S&F onside wall wet & dry bulb thermometer for A/C plant rooms contains red spirit filled in thermometers (non mercury), plastic moldedcase , item length minimum should be 24 inch complete all as specified and directed. |
| 11 | Supply and fix in repairs Sprinkler Assembly complete with Header Nozzles made out of Galvanised iron suitable to fix in cooling towers of 100 TR and above Capacity AC plant complete all as specified and directed by Engr-in-charge. |
| 12 | Material and labour for rewinding of induction motor 700/900/1400/2900 RPM, 3 phase, 50 Hz, 415 volt of compressor motor and AHU Blower , chiller , condenser motor comprising of the following activities for induction motor of following capacitiescomplete all as specified and directed as per manufacturer\"s instructions.(i) Disconnecting and removing the electric motor from installed position and loading unloading, transporting to authorised/approved work shop.(ii) Dismantling existing burnt winding from the motor and rewinding complete with super enamelled copper winding wire of existing gauge including all material such as insulated paper sleeves tape varnish etc. complete for class F insulation and including shaft metalising, bearing cover sleeving , necessary replacement of cooling fan, nut-bolt etc.(iii) Loading, unloading and transporting motor & reinstalling in position and in alignment including electric connection commissioning and testing in actual working condition for 8 hours continuously to check the performance on full load and designed RPM to the complete satisfaction of Engr-in-Charge all as specified and directed.(iv) Replacement of old unserviceable ball bearing, cooling fan, mechanical seal, nut/bolt and washer of existing size and painting of motor as directed by Engr-in-charge complete of the following type and capacity of induction motor :- (a) Induction Motor of Capacity 15 to 20 HP |
| 13 | All as per item no 12 above butInduction Motor of Capacity 7.5 to 12.5HP |
| 14 | All as per item no 12 above but Induction Motor of Capacity 3 to 5HP |
| 15 | Supply and fix in replacementbimetal overload relay type MN-02 of relay range, 4.5 to 7.5 Amp complete all as specified and directed. |
| 16 | Supply and fix in replacement bimetal overload relay type MN-02 of relay range, 9 to 15 Amp complete all as specified and directed. |
| 17 | Supply and fix in replacementbimetal overload relay type MN-02 of relay range, 14 to 23 Amp complete all as specified and directed. |
| 18 | Supply and fix in replacement star delta electronic timerworking voltage 230V 50 Hz as per site, complete all as specified and directed. |
| 19 | Supply and fix in replacement single phase preventor working voltage 415V 50 Hz as per site complete all as specified and directed. |
| 20 | Supply and fixing in replacement Air break contactor 65 Amp 2 NO + 2NC, Model No 3TS47 22-0AR0-08K with Auxiliary contactcomplete all as specified and directed. |
| 21 | S&F in RepairCoupling Tyre TC-11 ( FTC-11)ISI Marked suitable for 10 to 20 HP motor. complete all as specified and directed. |
| 22 | S&Fin Repair of power contactor 18 Amp 3 Pole of , 3 pole with auxilary contact 1 NO (built-in) , operational current - 18 Amp, 415 Volt, control circuit AC operated 220-240 Volts complete all as specified and directed.Make : ABB, model No AX18-30-10 or technocommerical equivalent L&T/Siemens/Havells as approved by GE. |
| 23 | Supply and fixing of Compressor protection module, 220 V AC, 50/60Hz, 2W,Ambient temperature range : 30 to 70 dec C, Relay 250 V AC suitable for scroll compressor 21 TR. Make : SHYISY, Model : DEP 101B or technocommerical equivalent as approved by GE. |
| 24 | Supply , instalation , testing and commissioning of Mercury in glass industrial thermometer in SS-304 casing with 0.50°C least count, range 0-50°C. Brass oil filled thermowell of size as per site condition. |
| 25 | Supply , instalation , testing and commissioning of stain steel water pressure gauge (100 mm Ø) bourdon type with brass ball valve of 3/8\" Ø and SS tubing syphon, socket.Range (0-50) / (0-100) as required. |
| 26 | Supply and fixin repairs of Chilled water sensor as per existing make and type complete all as specified and directed |
| 27 | Supply and Fix in replacement float valve assembly 20 mm complete all as specified and directed by Engr-in-Charge. |
| 28 | Supply and Fix for wire mesh made put of PVC and mesh size not less than 25 mm fixed in cooling tower by nut/bolts as directed by Engineer-in-charge. |
| 29 | Supply and fix in replacement of step down transformer 220 V AC to 24 /13 VDC as per site condition complete all as specified and directed by Engr-in-Charge. |
| 30 | Supply and fixing panel mounting digital ammeter 3 phase, 3 wire, Display type : red LED 14.2 MM (0.56\") including control wiring from ammeter to CT\"s complete all as specified and directed. |
| 31 | Supply and fixing panel mounting digital voltmeter 3 phase, 4 wire, Display type : red LED 14.2 MM (0.56\") including control wiring complete all as specified and directed. |
| 32 | Supply and fix in repairs in repair on-off push button pendants with elements red/green/orange of make MIMIC/ M/s L&T/ Legrand / HPL all as specified and directed. |
| 33 | Material and Labour for Replacement of old unserviceablepressure relief valve ofcondenser 3/8\" BSPthreaded suitablefor 300 PSI including control wiring complete all as specified and directed by Engr-in-Charge. |
| 34 | Material and Labour for replacement of worn-out crankcase heaters of suitable for 21 TR scroll compressor including its control wiring as per existing all as specified and directed by Engr-in-Charge. |
| 35 | Material and labour for Charging of refrigerant gas R- 407C in sealed cylinder after making system leak proof complete all as specified and as directed. |
| 36 | Supply and fix in replacement of thermostatic expansion valve of capacity 21/22TR and model as per site requirement for keep a constant superheat or refrigerant level situation in refrigeration system based on evaporator outlet temperature and pressure complete all as specified and as directed.. |
| 37 | Supply and fix in replacement of PCB for water cooled chiller unit (21.2 x 4) 85 TR suitable for operating four compressor, comprising ofdisplay unit, control transformer, digital current transformer and main PCB working on 12Volt control system including control wiring required to run the system complete all as specified and directed. |
| 38 | Supply and Fix in replacement of unserviceable digital current transformer 100 Amp with PCB card suitable for operation of controller of AC plant as per existing complete all as specified and directed by Engr-in-Charge. |
| 39 | Supply and fixingin replacement of PCB complete with display unit and control wiring as per existing for hot water generator of capacity 70 to 100 KW complete all as specified and directed by the Engr-in-Charge. |
| 40 | Supply and replacement ofPVC filling blocks, drift, eliminator of size as per site suitable for cooling towercomplete all as specified and directed. |
| 41 | Supply and fix in replacement ofcooling tower Fan Assembly hub with low speed fan blade as per existing size made out of propeller type light weight solid/ hollow FRP rust resistant with statically and dynamically balanced blades suitable for 100 TR capacity cooling tower of Make : Bell or equivalent |
| 42 | S&F in Repair of V belt type A-40/1016(IS) for AHU NO 01suitable for blower motor complete all as specified and directed. |
| 43 | S&F in Repair of V belt type B 1618 LP/B-62 (IS)for AHU NO 02, suitable for blower motor complete all as specified and directed. |
| 44 | S&Fin Repair of V belt type A-1204 LP/A-46 (IS) for AHU NO 03 suitable for blower motor complete all as specified and directed. |
| 45 | Supply and fix in replacement of water flow switch/ suction & discharge pressure transducer complete with control wiring all as per existing suitable for 170 TR central AC plant chilled water type complete all as specified and directed. |
| 46 | Supply and fix regenerable coarse type pre filter with aluminium frame, dust proof for AHU filter of size 610mm x 610mm x 50 mm |
| 47 | Supply and fix regenerable coarse type pre filter with aluminium frame, dust proof for AHU filter of size 610mm x 300mm x 50 mm |
| 48 | Supply and fixing in replacement rotational moulded polyenthylene Three layer water storage tanks (cylinderial vertical with closed top) capacity 10000 litres complete with inlet and outlet connection as per existing size pipe and suitable size float valve, gate valve in inlet and outlet including proper mounting arrangment on PCC plateform complete all as specified and directed of Capacity. |