|
| 1 | Supply of STQC certified Fixed Dome Camera (5MP) with MicroSD card 256GBas per technical specification attached herewith. |
| 2 | Supply of STQC certified Bullet Camera: (5MP) with MicroSD card 256GBas per technical specification attached herewith. |
| 3 | Supply of STQC certified PTZCameraMinimum5MP with MicroSD card 256GB as per technical specification attached herewith |
| 4 | Supply of STQC certified PTZCameraMinimum4K(8MP) with MicroSD card 256GB as per technical specification attached herewith |
| 5 | Installationof CCTV camera with necessary outdoor box/mounting plate & anyrequiredfabrication works in Pole/wallas per technical specification attached herewith. |
| 6 | Supplyandinstalltion ofVideoManagementSoftwarewithConfigurationofrecordingServer&StorageServers,Workstationclientswith Licenses required for the Video Management Server and Video Recording Servers & Storage Servers, Work station clients with bundled lifetime licenses for Max. 300 cameras with parallel recording. |
| 7 | Supplyof Servers required for Video Management, Recording, Analytics & Storage for handling 300 Nos. cameras including redundancy of servers with necessary windows, database application license and integration with the existing system. (Main server & Redundancy server) bidder to device number of servers configurations. Minimum tech specifications given. |
| 8 | Installationof Servers required for Video Management, Recording, Analytics & Storage for handling 300 Nos. cameras including redundancy of servers with necessary windows, database application license and integration with the existing system. (Main server& Redundancy server) bidderto device number of servers configurations. Minimum tech specifications given. |
| 9 | Supply of storage with dual controller for maintaining camera recording backup for 300 cameras for 90 days retention using RAID 6 plus 30 days back up for 300 cameras in parellel @ FHD /25fps. SAN Storage and Accessories |
| 10 | Installation of storage |
| 11 | Supplyof Smart rackfor the servers including storage units of IP-54with Cooling Solution, Fire Detection & Suppression Systems, Monitoring system with sensorsfor Temperature & Humidity Sensor, Water Leak Detector,biometricAccess Controlsystemforthe work station shall be supplied and installed by the contractor in DC Network operation center& Traffic Control room DR site. |
| 12 | Installation of Smart rackfor the servers including storage units in DC Network operation center& Traffic Control room DR site. |
| 13 | Carrying out necessary Civil reconditioning works in the existing CCTV control roomfor fixing ofLED TVfor proper viewing and in Traffic control room for DR site with necessaryraised floor design.Total area of Traffic control room for DR site is 39 Sqmtr.FALSE FLOOR: The systemmodular panels with heavy-duty pedestals.PANEL: Panels shall be made of steel with an infill of lightweight, non-combustible having fire resistance, thermal insulation, and flame resistance properties at 60 min cementitious material. The False Floor System shall be tested as per CISCA standards for Point Load, Uniform Load, Ultimate Load and Pedestal Axial Load. Test reports from an accredited laboratory to be furnished |
| 14 | Supplyof Air Conditioning system at Traffic Control room |
| 15 | Installation of Air Conditioning system at Traffic Control room |
| 16 | Supply and installation of Air Conditioning system at Network operation center |
| 17 | Installation of Air Conditioning system at Network operation center |
| 18 | Supply 10KVA FM UPS 1p1p UPS with SNMP Card with battery Rack & link.60Minuts |
| 19 | Installation of 10KVA FM UPS |
| 20 | Supplyofmono Pole structure (height 4Mtr) mounted P4 outdoor LED Video Wall (12.5x18.8) Feet total area 235 Square Fee twith video controller at, Green Gate (as per detailed technical spec attached) |
| 21 | Installation, Testing & Commissioning of mono Pole structure (height 4Mtr) mounted P4 outdoor LED Video Wall with viedo controller at, Green Gate and necessaryCivil Structure cost including foundation of the Pole materials, labour etc. |
| 22 | Supplyofmono Pole structure (height 4Mtr) mounted P4 outdoor LED Video (12.5x18.8) Feet total area 235 Square with viedo controller at Check Post-1(as per detailed technical spec attached) |
| 23 | Installation, Testing & Commissioning ofmono Pole structure (height 4Mtr) mounted P4 outdoor LED Video Wall with viedo controller at Check Post-1 and necessaryCivil Structure cost including foundation of the Pole materials, labour etc. |
| 24 | Supply of doublePole structure (height 4Mtr) mounted P4 outdoor LED Video Wall (12.5x18.8) Feet total area 235 Square feet (as per detailed technical spec attached)at Zone-B |
| 25 | Installation,Testing&Commissioningofdouble Polestructure(height4Mtr)mountedP4outdoorLEDVideoWallatZone-Bandnecessary Civil Structure cost including foundation of the Pole materials, labour etc. |
| 26 | Supplyof Video wall, controller, software with stand frames etcof Active LED Wall with SMD 3in1 1.56 mm or less Pixel Pitch as per following technical specifications complete in all respect, Size: Width 4.8m x 1.69 m or more, Aluminum Cabinet with Max depth of 72mm, Calibrated brightness of 600 nits or more, Viewing angle of 160 H X 150 V, Contrast ratio of 5000 :1 or more, Collor depth of 14 bit or more with HDR 10 / HDR 10 Pro, with IP50 dust protection. Same OEM LED UHD LED controller to be supplied. Width 15.74 feet / 4.8m or more Height 5.5feet / 1.69 m or more. Installation of Video wall, controller, software with stand frames etc |
| 27 | Installation of Video wall, controller, software with stand frames etcat Network operation center |
| 28 | Supplyworkstation of Client Workstation (having i7 12 gen/16 GB) with 55” 4k compatible Monitor. (Location NOC room Traffic control room, DC CISF, DC Marine) |
| 29 | Supplyof workstation of Client Workstation (having i7 12 gen/16 GB) with 43” 4k compatible Monitor. (LocationGreen Gate control room ) |
| 30 | SupplyofCore/Distributionswitchof24xSFP+,4xQSFP28,(2RedundantHotswappablePowerSupply:AC+AC,AC+DC,DC+DC),14Members stacking,RIP,OSPF,BGP,BGP4+,RIPng,OSPFv3,MPLS,NexxusVirtualSwitch(NVS)Support,IPV4/IPv6DualStack,802.3ah,802.1ag,ITUY. 1731,50 Millisecond convergence, ZTP. |
| 31 | Supplyof 24 Port POE SwitchesSupply of 24x100m/1GT PoE+ (370W) Stackable 19-inch rackmounted, L3 Switch with 4x 10G SFP+ (Single 230V AC environment), 14 Members stacking, RIP, OSPF, RIPng, OSPFv3, Nexxus Virtual Switch (NVS) Support, IPV4/IPv6 Dual Stack, 802.3ah, 802.1ag, ITU- Y.1731, 50 Millisecond convergence, ZTP |
| 32 | Supplyandinstallation ofFirewallhardwarewith.Partnerworkservice,Three-in-oneUpdateService(Subscribe1year).virussignaturedatabase upgrade service (Subscribe 1 year) attack signature database upgrade service (Subscribe 1 year), behavior management signature database upgrade service (Subscribe 1 year) series common SSL VPN license (100 concurrent connections), Extension of F1rewall services during contract( five years after warranty )Partnerworkservice,Three-in-one UpdateService (Subscribe1 year).virussignature databaseupgrade service(Subscribe 1year)attack signature database upgradeservice (Subscribe 1 year), ehaviormanagement signature database upgrade service (Subscribe 1 year)series common SSL VPN license (100 concurrent connections), (After 1st year warranty and services). |
| 33 | End Point Enterprises Antivirus for all the servers & workstations for six years validity |
| 34 | Supply of Communication Tower35Meters height with accessories atInmotion weigh bridge |
| 35 | InstalltionofCommunicationTower 35 Metersheightwithaccessoriesat InmotionweighbridgeincludingprovidingLightingarresterandearthing arrangements.All necessary labour forfixingand earth work for chamber 450x450mm providing charcoal and salt |
| 36 | Supply and installtion of Communication Tower 21 Meters height with accessories at truck parking terminal |
| 37 | InstalltionofCommunicationTower21MetersheightwithaccessoriesattruckparkingterminalincludingprovidingLightingarrester andearthing arrangements.All necessary labour forfixingand earth work for chamber 450x450mm providing charcoal and salt |
| 38 | Reconditioning of existinglattice tower in railway marshalling yard, including providing necesssary foundation Civil works and painting, providing clamp arrangment for fixing CCTV camera and earthing arrangements |
| 39 | Supply of copper Lighting arrester at Zone B,earthing GI pipe 40mm length 4.5 mtr, copper strip 25/3 |
| 40 | Installtion ofcopper Lighting arrester, earthing GI pipe, copper strip including providing clamping and making provision in the tower for fixing of arrester at Zone B. All necessary labour forfixingand earth work for chamber 450x450mm providing charcoal and salt |
| 41 | Supply, installation ofsolar panel with necessary Lithium battery for 12 hrs back up for PTZ CCTV camera.Outdoor Box for keeping battery, network equipment to be provided. Necessary clamp arrangement for fixingin pole. |
| 42 | Installation ofsolar panel with necessary Lithium battery for 12 hrs back up forFixedCCTV camera.Outdoor Box for keeping battery, network equipment to be provided. Necessary clamp arrangement for fixingin pole. |
| 43 | Supply of CAT 6 cable patch cord 2mtr Cable jacket material : Low Smoke zero halogen (LSZH), Cate 6 patch cord conforming to ANSI/TIA /EIA-568 C.2 or ISO/IEC:11801 latest, Conductor diameter 24 to 26 AWG, Conductor Material Stranded copper, Conductor Insulation Material Polyethelene |
| 44 | Supplyof Wall/Pole Mount Rack 9U 500MM deep 19\" Outdoor Rack Fixed Structure with 1.2MM GI Sheet, L- Shape Verical Mounting Rail 1.6MM with \"U\" Marking , two Cooling Fan with air filter Provision at front door, Cable entry/exit provision at bottom with PG Glands, Polyester Powder coated Colour- RAL- 7035 . Company should be ISO 9001:2015 & 14001:2015 or higher Certified, RoHS & CE Certified product. Accessories as per site requirement 9U 500mm depth GI- 1.2mm Outdoor rackFan- 02 Nos PDU 5 Socket 5/15 Amp with MCB and Surge Protector Cable Manager- 01 NoHardware Packet- 01 No |
| 45 | Installtion of Wall/Pole Mount Rack 9U |
| 46 | Supply of Wall/Pole Mount Rack 15U 500MM deep 19\" Outdoor Rack Fixed Structure with 1.2MM GI Sheet, L- Shape Vertical Mounting Rail 1.6MM with \"U\" Marking , two Cooling Fan with air filter Provision at front door, Cable entry/exit provision at bottom with PG Glands, Polyester Powder coated Colour- RAL- 7035 . Company should be ISO 9001:2015 & 14001:2015 or higher Certified, RoHS & CE Certified product. Accessories as per site requirement, 15U 500mm depth GI- 1.2mm Outdoor rack, Fan- 02 Nos, PDU 5 Socket 5/15 Amp with MCB and Surge Protector, Cable Manager- 01 No, Hardware Packet- 01 No |
| 47 | Installtion of Wall/Pole Mount Rack 15U |
| 48 | Supply of Line Interactive UPS with 15 minutes baqckup on line as per detailed techncial specifications attached. |
| 49 | Supply ofSC to SC fiberpatch cordConnector insertion loss (max) 0.3 dB, Connector return loss (min) 55dB,material-Zirconia ceramic, preraisuedand prepolished, cable type-simplex, single mode 9/125micron, cord length-3 mtr |
| 50 | Supply of LC to SC fiberpatch cordConnector insertion loss (max) 0.3 dB, Connector return loss (min) 55dB,material-Zirconia ceramic, pre raisuedand pre polished, cable type-simplex, single mode 9/125micron, cord length-3 mtr |
| 51 | Supply ofIndustrial Grade switch 4*10/100/1000M PoE ports, 2*100/1000M SFP fiber ports, 120 w, IP40 as per detailed technical specifciations attached |
| 52 | Installtion of Gigabit PoE Switch |
| 53 | Supply installation of NMS device loaded with required software as per techncial specifcations attached |
| 54 | Supply of Radio Devices with receiver’s as per site condition.(pair Tranmitter+Receiver) as per detaield techncial specifcations attached |
| 55 | Installation of outdoor point to point wireless bridge Type of Bridge |
| 56 | Supply of oudoor CAT6 required for providing networking of CCTV and Viedo wall etc in this work |
| 57 | Supply of oudoor OFC12F required for providing networking of CCTV and Viedo wall etc in this work |
| 58 | Supply of oudoor OFC24F required for providing networking of CCTV and Viedo wall etc in this work |
| 59 | Supply of 3Core Armored 4 Sqmm Power Cable copper condutor |
| 60 | Supplyof suitableISI standard GI pipe with rubber bushes to be provided in the ends of the GI pipe for easy movement of OFC cablesand to prevent rodents G.I. pipes should be of medium duty class having diameter of 40mm. The G.I. Pipes shouldconform to IS 554/1985 (revised upto date) IS 1989 (Part-I), 1900 Sockets (revised upto date) & IS 1239(Part-II) 1992 (revised upto date). |
| 61 | Supplyof suitableISI standard GI pipe with rubber bushes to be provided in the ends of the GI pipe for easy movement of OFC cablesand to prevent rodents G.I. pipes should be of medium duty class having diameter of 65 mm. The G.I. Pipes shouldconform to IS 554/1985 (revised upto date) IS 1989 (Part-I), 1900 Sockets (revised upto date) & IS 1239(Part-II) 1992 (revised upto date). |
| 62 | Laying of suitableISI standard GI pipein road crossing by road cutting to a depth of 300 mm and laying of GIand finishing with concrete to the road level |
| 63 | Laying of CAT6 cable in suitable PVC pipe of 2mm thick ISI markwith GI clamps as per site condtion. Necessarybendand accessories is in the scope of contractor. |
| 64 | Laying of HDPE & OFC cable/Power cable in trench by excavating earth at a depth of 1 mtr Necessary cushioning and cable should be coveredfor protection and refilling the trench or by HDD with blowing of OFCand make good. |
| 65 | Laying of OFC cable & HDPE pipesinside the cable duct by lifting the concrete blockstrench behind green gate entranceand after laying of cables inside duct the concrete blocks to be arrangedto avoid hindrance for pedestrian movement |
| 66 | Laying of HDPE pipes in thefencingwith proper clamping includinglaying ofOFC cable/power supply cable/cat 6in the HDPE pipe by pulling or blowing |
| 67 | Splicingfor termination of OFC cable |
| 68 | SupplyofSingle Mode Full Duplex Auto Sensed Fiber Media converter, Speed, Mbps : 1000 Sensor : Full Duplex Auto Sensed, Maximum Transmission Distance : 10 kilometer Mode : Single Mode Supports flow control and reduce broadcast packets ,Flow Control :Full Duplex: Flow Control Supporting Packets VLAN, VoIP, QoS, Mounting Type Din-Rail, Network Media Converts 1000 Base -T to1000 Base - LX, Standards and Protocols IEEE802.3 10 Base-T Ethernet,IEEE802.3u 100 Base- TX/FX Fast Ethernet, IEEE802.3ab, IEEE 802.3z, IEEE 802.3x |
| 69 | Supply of 9 Mtrs Pole with required accessories |
| 70 | Installation of 09 Meter Pole with required Civil Foundation work asper site condition. |
| 71 | Supply, Installation tetsing commisisoning of UVSS system as per detailed techncial spec attached |
| 72 | Supply, installation, testing and commissioning of Speed monitoring system with cameras and associated devices software, etc., to detect speed violations for (3+3) 6 lane road. Also includes necessary civil works, structures, license of software, display for each lane to show speed, etc |
| 73 | Planning & Re storation of existing cctv systemwith all possible linking arrangements of entire CCTV facilities and viedo wall |
| 74 | Commissioning of entire surveillance system of CCTVsand viedo wall, Complete as per Project requirement as one time job. Existing and new system in single control room and parallel monitoring facalities |
| 75 | Technical Onsite Technician/ Engineers to maintain complete system during the contract Period including boarding lodging fuels Etc. During warranty and AMC periods(60 months). High skilled-1 no, Skiled-4 nos, Unskiled- 2 Nos |
| 76 | Secondyear CAMC for LED video wall display, CCTV cameras, Speed monitoring system, UVSS and associated accessories |
| 77 | Third yearCAMC for LED video wall display, CCTV cameras, Speed monitoring system, UVSS and associated accessories |
| 78 | Fourth yearCAMC for LED video wall display, CCTV cameras, Speed monitoring system, UVSS and associated accessories |
| 79 | FifthyearCAMC for LED video wall display, CCTV cameras, Speed monitoring system, UVSS and associated accessories |
| 80 | Buyback for the old PTZ CCTV camera |
| 81 | Buyback for the oldFixedCCTV camera |
| 82 | Buyback for the old 55 “ LED TV |
| 83 | Buyback for theold client work station |
| 84 | Buyback for the existing speed monitoring system as is where is basis |