| 1 | CIVIL WORK |
| 2 | Earth work in filling in ordinary soil (Carted Earth), excavation to be in the form or regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20cm layer including ramming & dressing the surface to required level and slopes and also including lift up to 1.5m and lead up to 8 KM the earth cutting to be deposited as spoil banks within 30m distance as per directed by Engineer in charge as per UPPWD SOR 2022 SI.No. 253. |
| 3 | Excavation in foundation in ordinary soil incluidng filling lift up to 1.5 m and lead up to 30 m & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the side of foundation trenches or plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge up to a distance of 30 m from the foundation trenches including all T&P etc. complete As per UPPWD SOR 2022 S.I. No. 251. |
| 4 | Supply and laying of local sand in trench includimg ramming, dressing, watering etc. including cost of all material, labour etc. required for proper completion of the work As per UPPWD SOR 2022 S.I. No. 255. |
| 5 | Cement Concrete with 4 cm gauge brick ballast, sand of 1.25 FM, and cement in proportion of 12:6:1 in fondation and under floor including supply of all material, labour, T&P etc. required for proper completion of the work As per UPPWD SOR 2022 S.I. No. 273. |
| 6 | R.C.C. Work with cement, approved coarse sand and 2 cm gauge approved stone ballast in proportion of 1:2:4 in R.C.C. T. beam and slab and R.C.C. column excluding its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc.,and also including supply of all material required for proper completion of the work. Binding wire to be supplied by the contractor free of cost As per UPPWD SOR 2022 S.I. No. 283. |
| 7 | Mild steel work (TMT Bar HYSD) such as in reinforced concrete work wrought to required shape as necessary including bending and also including supply of steel and wastages and overlapping and hooks required for completion of the work As per UPPWD SOR 2022 S.I. No. 504. |
| 8 | 1st class brick work in 4:1 fine sand and cement of 1.25 fineness modulus mortor in foundation & plinth including supply of all material, labour and tools and plants etc. required for proper completion of the work As per UPPWD SOR 2022 S.I. No. 305. |
| 9 | 12mm thick plaster with cement mortar in proportion of 1:4 cement and sand of 1.25 FM over brick work minimum thickness not to be less than 10mm including supply of all material labour T&P etc. complete as per UPPWD SOR 2022 S.I. No. 584 |
| 10 | Laying Cement Concrete road, slab consisting of 1:2:4 cement, coarse sand and approved 20mm gauge stone ballast over prepared sub-grade after its rectifications & bringing it to proper camber and including supply of all material, labour, T&P etc. required for proper completion of the work, finished to required template as directed by E/I. but excluding cost metal required for reflection of the sub-grade As per UPPWD SOR 2022 S.I. No. 773. |
| 11 | Finishing walls with premium acrylic smooth exterior paint with silicone additives of required shade new work (two or more coats applied @1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) ie apex, ultima, weather coat all guard) asian, berger etc. complete as per DSR No. 13.47.1 as per direction of Engineer-In-Charge. |
| 12 | Mild steel or iron work in heavy sizes such as trusses, built up gates, door frames, records racks, roof work, gates etc. wrought to required form, including drilling holes, riveting or weling where necessary and also including supply of steel, bolts, nuts and wastages etc. and their fixing required for completion of the work As per UPPWD SOR 2022 S.I. No. 503 as per direction of Engineer-In-Charge. |
| 13 | Supply & fixing of B.R.C. Jali of 10x6 gauge 2.50 cm x 7.50 cm size including cutting, welding & wastage etc. as per direction of engineer-in-charge including supply of all material, labour, T&P etc. complete as per SI. No. 18.15 |
| 14 | Painting or varnising on iron work in small areas on new iron work with one coat of ready mixed priming paint and one coat of approved superior quality ready mixed paint of clear synthetic varnish including supply of all materials, labour and T&P etc. required for proper completion of the work. Paint to be used should conform to the I.S.I. No. 103-1950 as per UPPWD SOR 2022 SI. No. 641 as per direction of Engineer-In-Charge. |
| 15 | Supply and fixing galvanised cirrugated iron roofing 24 BWG in position including supply of all material, labour and T &P etc. required for the proper compition of the work and inculding wastage as per UPPWD SOR 2022 S.I. No. 536. |
| 16 | Supply and Fixing of C.C. chair including cost of all material labour T&P etc. complete. |
| 17 | Supply and Fixing of Granite stone display board with fixing in brick masonry wall, lettering & painting including supply of all material, labour, plastering etc. complete required for proper completion of the work. |
| 18 | GST Please Enable Macros to View BoQ information |