| 1 | Side Protection Work |
| 2 | 2.6.1Earth work in excavation by mechanical means (Hydraulic excavator)/manual meansover areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-in-charge.All kinds of soil |
| 3 | 4.1.8Providing and laying in position cement concrete of specified grade excluding thecost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mmnominal size derived from natural sources) |
| 4 | 5.1.3Providing and laying in position specified grade of reinforced cement concrete,excluding the cost of centering, shuttering, finishing and reinforcement - All work upto plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mmnominal size derived from natural sources) |
| 5 | 5.9.1Centering and shuttering including strutting, etc. and removal of formfor:Foundations, footings, bases of columns, etc for mass concrete |
| 6 | 5.2.2Reinforced cement concrete work in walls (any thickness), including attachedpilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. up tot floor five level excluding cost of centering,shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 gradedstone aggregate 20 mm nominal size derived from natural sources) |
| 7 | 5.9.2 Centering and shuttering including strutting, etc. and removal of form for:Walls (anythickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 8 | 5.22.6Steel reinforcement for R.C.C work including straightening, cutting, bending, placingin position and binding all complete upto plinth levelThermo - Mechanically Treatedbars of grade Fe-500D or more |
| 9 | 5.22A.6Steel reinforcement for R.C.C work including straightening, cutting, bending, placingin position and binding all complete above plinth level.Thermo - MechanicallyTreated bars of grade Fe-500D or more |
| 10 | 60.6PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes workingpressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc.complete |
| 11 | EXCLUSIVE OF GST |
| 12 | Note :1 All materials, Items, Equipment shall be best branded items with IS and approved by client/KEL |
| 13 | 2:Rate should be inclusive of Insurance,Transportation, delivery and installation cost for all items |
| 14 | 3.Rate should be Exclusive of GST. |
| 15 | 4.Work should be executed as per DSR/PWD specification and direction of Engineer at site. |
| 16 | 5.CEMENT: Make use Malabar cement only as per Govt. direction and in case of non availabilty of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference. |
| 17 | 6.RCC: (Assessment of strength of concrete by Cube testing at Approved Govt labs as per IS) Cement make: Use Malabar cement only as per Govt. direction and in case of non availabilty of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference. |
| 18 | 7.STEEL REINFORCEMENT: Make: Tata,Vaishak, SAIL, JSW or eq primary make in the order of preference |
| 19 | 8.CENTERING & SHUTTERING: (Centering and shuttering for different category of work may be considered separately.) |
| 20 | 9.Rigid PVCPipes/Casing & Capping - A-ONE/REPUTED MAKE with ISI , Precession, Balco, GEO Please Enable Macros to View BoQ information |