|
| 1 | Supply Item |
| 2 | 33KV CT CLAMP FOR PANTHER WITHN&B(As per Specification of RESPO & UPCL) |
| 3 | ISOLATOR CLAMP FOR ACSR PANTHER(As per Specification of RESPO & UPCL) |
| 4 | 70 watt LED Street Light |
| 5 | Bolt & Nuts off Size(As per Specification of RESPO & UPCL) |
| 6 | PVC CABLE 1X2.5(As per Specification of RESPO & UPCL) |
| 7 | MULTISTRAND PVC COPPER WIRE 2.5SQ mm(As per Specification of RESPO & UPCL) |
| 8 | 24 V BATTERY SET |
| 9 | 24V BATTERY CHARGER |
| 10 | GI STRIP 50X6 MM(As per Specification of RESPO & UPCL) |
| 11 | T Connector(As per Specification of RESPO & UPCL) |
| 12 | Earth Electrode(As per Specification of RESPO & UPCL) |
| 13 | MS Flat 40X6 MM(As per Specification of RESPO & UPCL) |
| 14 | Erection Work |
| 15 | EXCAVATION FOR FOUNDATION |
| 16 | CLEANING, DRESSING & LABLINGSWITCH YARD |
| 17 | EXCAVATION OF TRENCH IN ALL SOIL |
| 18 | CEMENT CONCRETING WORK IN RATIO1:2:4 |
| 19 | BRICK WORK IN 1:4 RATIO |
| 20 | CEMENT PLASTER WORK |
| 21 | SPREADING & LEVELLING OF GRITTFOR YARD |
| 22 | FILLING OF SOIL FOR LEVELING OFYARD |
| 23 | CC FROM SWITCHYARD RATIO 1:4:12 |
| 24 | FENCING OF YARD |
| 25 | RCC WORK 1:4 RATIO FOR POWER T/FPLINTH |
| 26 | RR MASSONARY WORK FOR POWER T/F PLINTH |
| 27 | SPECIAL EARTHING |
| 28 | ERECTION OF EARTHING ROD |
| 29 | FABRICATION OF STEEL |
| 30 | EXCAVATION OF PIT FOR STAY SET |
| 31 | ERECTION OF 11 KV STAY SET |
| 32 | GROUTING OF STAY SET |
| 33 | EXCAVATION OF PIT FOR POLE |
| 34 | ERECTION OF SINGLE SP-33 POLE |
| 35 | ERECTION OF SP-55 DOUBLE POLE |
| 36 | GROUTING OF POLE |
| 37 | MUFFING OF POLE |
| 38 | PAINTING OF SP-33 POLE |
| 39 | PAINTING OF SP-55 POLE |
| 40 | LAYING OF U/G 11 KV CABLE INTRENCH |
| 41 | LAYING OF U/G 33 KV CABLE INTRENCH |
| 42 | EXCAVATION OF EARTH FOR DTRPLINTH |
| 43 | CEMENT PLASTER ON DTR PLINTH |
| 44 | FIXING OF FUSE SET |
| 45 | FIXING OF LIGHTNING ARRESTOR |
| 46 | LAYING OF PANTHER CONDUCTOR INHT LINE |
| 47 | CONST.,INST.OF DANGER BOARD/NUMBER PLATE |
| 48 | FIXING OF 11 KV XLPE JOINTING KIT |
| 49 | FIXING OF 33 KV XLPE JOINTING KIT |
| 50 | CARTAGE SP-33 POLE, 21-50 KM |
| 51 | CARTAGE SP-55 POLE, 21-50 KM |
| 52 | CARTAGE OF PETTY MATERIAL,21-50KM |
| 53 | CARTAGE 11 KV PANELS, 21-50 KM |
| 54 | CARTAGE 33/11 CT/PT/ISOLATOR, 21-50KM |
| 55 | CARTAGE 10/12.5 MVA POWER T/F(21-50KM) |
| 56 | HEADLOAD CARTAGE SP-33 POLE(0-1KM) |
| 57 | HEADLOAD CARTAGE SP-55 POLE(0-1KM) |
| 58 | HEADLOAD CARTAGE OFMATERIAL(0-1 KM) |
| 59 | MANUAL SHIFTING OF CONTROLPANEL |
| 60 | MANUAL SHIFTING OF 11 KV VCB I/C |
| 61 | MANUAL SHIFTING OF 11 KV VCB B/C |
| 62 | MANUAL SHIFTING OF 11 KV VCB O/G |
| 63 | SHIFTING OF 12.5 MVA |
| 64 | LOADING T/F(12.5/10 MVA) IN VEHICLE |
| 65 | UNLOADING T/F(12.5/10 MVA) INVEHICLE |
| 66 | ERECTION OF POWER T/F(12.5/10 MVA) |
| 67 | ERECTION OF CABLE/NEUTRAL STAND |
| 68 | ERECTION CHARGES OF STRUCTURE |
| 69 | ERECT.11 KV VCB(O/G-B/C-I/C)PANEL |
| 70 | ERECT.33 KV CONTROL PANEL(FDR/T/F) |
| 71 | SERVICE OF HYDRA MACHINE |
| 72 | JUMPERING OF 33 KV BAY |
| 73 | FINAL TESTING OF CABLE, PANEL ETC |
| 74 | CARTAGE OF 33 KV VCB |
| 75 | HEADLOAD CARTAGE OF 33 KV BUSISOLATOR |
| 76 | HEADLOAD CARTAGE OF 33 KV VCB |
| 77 | ERECTION OF 33 KV VCB |
| 78 | FIXING OF 33 KV DISC INSULATOR |
| 79 | FIXING OF 33KV PIN INSULATOR |
| 80 | TESTING POWER TRANSFORMER |
| 81 | INSTALLATION / FIXING OF 33 KVISOLATOR |
| 82 | MAKING OF TRENCH COVER |
| 83 | LAYING OF CONTROL CABLE |
| 84 | HEADLOAD CARTAGE OF 11 KV VCB I/C |
| 85 | HEADLOAD CARTAGE OF 11 KV VCB O/G |
| 86 | HEADLOAD CARTAGE OF 11 KV VCB B/C |
| 87 | GROUTING OF PALE FENCINGSUPPORT ANGLE |
| 88 | CUTTING OF WILD GRASS ANDBUSHES |
| 89 | SHIFTING AND LOADING OIL FILLEDDRUMS |
| 90 | FILLING OF FRESH OIL IN POWER T/F Please Enable Macros to View BoQ information |