| 1 | Supply Item |
| 2 | 33KV CT CLAMP FOR PANTHER WITHN&B (As per Specification of RESPO & UPCL) |
| 3 | ISOLATOR CLAMP FOR ACSR PANTHER(As per Specification of RESPO & UPCL) |
| 4 | 70 watt LED Street Light |
| 5 | Bolt & Nuts off Size(As per Specification of RESPO & UPCL) |
| 6 | 11KV CABLE T/K 3X300mm² XLPE O/D(As per Specification of RESPO & UPCL) |
| 7 | CABLE COPPER 1x4 SQ mm(As per Specification of RESPO & UPCL) |
| 8 | PVC CABLE 1X2.5(As per Specification of RESPO & UPCL) |
| 9 | MULTISTRAND PVC COPPER WIRE 2.5SQ mm(As per Specification of RESPO & UPCL) |
| 10 | 24 V BATTERY SET |
| 11 | 24V BATTERY CHARGER |
| 12 | GI STRIP 50X6 MM(As per Specification of RESPO & UPCL) |
| 13 | T Connector(As per Specification of RESPO & UPCL) |
| 14 | Earth Electrode(As per Specification of RESPO & UPCL) |
| 15 | MS Flat 40X6 MM(As per Specification of RESPO & UPCL) |
| 16 | Erection Work |
| 17 | EXCAVATION FOR FOUNDATION |
| 18 | CLEANING, DRESSING & LABLINGSWITCH YARD |
| 19 | EXCAVATION OF TRENCH IN ALL SOIL |
| 20 | CEMENT CONCRETING WORK IN RATIO1:2:4 |
| 21 | BRICK WORK IN 1:4 RATIO |
| 22 | CEMENT PLASTER WORK |
| 23 | SPREADING & LEVELLING OF GRITTFOR YARD |
| 24 | FILLING OF SOIL FOR LEVELING OFYARD |
| 25 | CC FROM SWITCHYARD RATIO 1:4:12 |
| 26 | FENCING OF YARD |
| 27 | RCC WORK 1:4 RATIO FOR POWER T/FPLINTH |
| 28 | RR MASSONARY WORK FOR POWER T/F PLINTH |
| 29 | SPECIAL EARTHING |
| 30 | FABRICATION OF STEEL |
| 31 | PAINTING OF SP-33 POLE |
| 32 | PAINTING OF YARD |
| 33 | LAYING OF U/G 11 KV CABLE INTRENCH |
| 34 | EXCAVATION OF EARTH FOR DTRPLINTH |
| 35 | CEMENT PLASTER ON DTR PLINTH |
| 36 | FIXING OF FUSE SET |
| 37 | FIXING OF LIGHTNING ARRESTOR |
| 38 | LAYING OF PANTHER CONDUCTOR INHT LINE |
| 39 | CONST.,INST.OF DANGER BOARD/NUMBER PLATE |
| 40 | FIXING OF 11 KV XLPE JOINTING KIT |
| 41 | CARTAGE OF PETTY MATERIAL,21-50KM |
| 42 | CARTAGE 11 KV PANELS, 21-50 KM |
| 43 | CARTAGE 33/11 CT/PT/ISOLATOR, 21-50KM |
| 44 | CARTAGE 10/12.5 MVA POWER T/F(21-50KM) |
| 45 | HEADLOAD CARTAGE OFMATERIAL(0-1 KM) |
| 46 | MANUAL SHIFTING OF CONTROLPANEL |
| 47 | MANUAL SHIFTING OF 11 KV VCB I/C |
| 48 | SHIFTING OF 12.5 MVA |
| 49 | LOADING T/F(12.5/10 MVA) IN VEHICLE |
| 50 | UNLOADING T/F(12.5/10 MVA) INVEHICLE |
| 51 | ERECTION OF POWER T/F(12.5/10 MVA) |
| 52 | ERECTION OF CABLE/NEUTRAL STAND |
| 53 | ERECTION CHARGES OF STRUCTURE |
| 54 | ERECT.11 KV VCB(O/G-B/C-I/C)PANEL |
| 55 | ERECT.33 KV CONTROL PANEL(FDR/T/F) |
| 56 | SERVICE OF HYDRA MACHINE |
| 57 | BACK CARTAGE OF PETTYMATERIAL,0-20 KM |
| 58 | FINAL TESTING OF CABLE, PANEL ETC. |
| 59 | CARTAGE OF 33 KV VCB |
| 60 | HEADLOAD CARTAGE OF 33 KV VCB |
| 61 | ERECTION OF 33 KV VCB |
| 62 | BACK HEAD LOAD CART. OF PETTYMAT. 0-1KM |
| 63 | FIXING OF 33 KV DISC INSULATOR |
| 64 | FIXING OF 33KV PIN INSULATOR |
| 65 | TESTING POWER TRANSFORMER |
| 66 | INSTALLATION / FIXING OF 33 KVISOLATOR |
| 67 | MAKING OF TRENCH COVER |
| 68 | LAYING OF CONTROL CABLE |
| 69 | HEADLOAD CARTAGE OF 11 KV VCB I/C |
| 70 | REPAIRING & GAS WEALDING |
| 71 | GROUTING OF PALE FENCINGSUPPORT ANGLE |
| 72 | CUTTING OF WILD GRASS ANDBUSHES |
| 73 | SHIFTING AND LOADING OIL FILLEDDRUMS Please Enable Macros to View BoQ information |