| 1 | Repairs to VPSC building @ Narasingarayanpettai Pt |
| 2 | Distempering the inner walls with two coats of best quality oil bounded distemper including the cost of all materials, labour charges etc., complete. |
| 3 | Exterior Emulsion two coats with approved quality of snowcem including the cost of all materials conveyances, labour charges etc., complete. |
| 4 | Painting two coats with approved quality of paint over old steel doors and windows including the cost of all materials, labour charges etc., complete. |
| 5 | Provision for Steel Hollow Section |
| 6 | Provision for Electric Arrangement |
| 7 | Provision for Rainwater Harvesting Structure |
| 8 | Provision forSeptic Tank Cleaning |
| 9 | Provision for Toilet Repairs |
| 10 | Provision for Name board charges |
| 11 | Provision for Photo charges |
| 12 | Repairs to VPSC building @ Ottambattu Pt |
| 13 | Supplying and fixing in position ordinary colour glazed Eropean water closet of best quality and approved make with 100mm\" P\" or \"S\" trap with double flapped rigit P.V.C seat level flushing tank with 10 liters PVC low level Flushing tank with all interna |
| 14 | Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) Using anti-skid tiles (Observed Data) |
| 15 | Distempering the inner walls with two coats of best quality oil bounded distemper including the cost of all materials, labour charges etc., complete. |
| 16 | Exterior Emulsion two coats with approved quality of snowcem including the cost of all materials conveyances, labour charges etc., complete. |
| 17 | Painting two coats with approved quality of paint over old steel doors and windows including the cost of all materials, labour charges etc., complete. |
| 18 | Provision for Electric Arrangement |
| 19 | Provision for Rainwater Harvesting Structure |
| 20 | Provision for Septic Tank Cleaning |
| 21 | Provision for Toilet Repairs |
| 22 | Provision for Name board charges |
| 23 | Provision for Photo charges |
| 24 | Repairs to VPSC building @ Ponnankuppam pt |
| 25 | Distempering the inner walls with two coats of best quality oil bounded distemper including the cost of all materials, labour charges etc., complete. |
| 26 | Exterior Emulsion two coats with approved quality of snowcem including the cost of all materials conveyances, labour charges etc., complete. |
| 27 | Painting two coats with approved quality of paint over old steel doors and windows including the cost of all materials, labour charges etc., complete. |
| 28 | Provision for Rainwater Harvesting Structure |
| 29 | Provision for Electric Arrangement |
| 30 | Provision for Name board charges |
| 31 | Provision for Photo charges |
| 32 | Repairs to VPSC building @ Pothuvai Panchayat |
| 33 | Dismantling Existing Ceramic Tiles all charges |
| 34 | Cement Concrete 1:4:8 mix using 40mm Metal including the cost of all materials, labour charges etc., complete. |
| 35 | Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) Using anti-skid tiles (Observed Data) |
| 36 | Paving the floor with Verified Tiles including the cost of all materials, labour charges etc., complete. |
| 37 | Pointing Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers |
| 38 | Distempering the inner walls with two coats of best quality oil bounded distemper including the cost of all materials, labour charges etc., complete. |
| 39 | Exterior Emulsion two coats with approved quality of snowcem including the cost of all materials conveyances, labour charges etc., complete. |
| 40 | Painting two coats with approved quality of paint over old steel doors and windows including the cost of all materials, labour charges etc., complete. |
| 41 | Provision for Steel Hollow Section |
| 42 | Provision for Electric Arrangement |
| 43 | Provision for Rainwater Harvesting Structure |
| 44 | Provision for Septic Tank Cleaning |
| 45 | Provision for Toilet Repairs |
| 46 | Provision for Name board charges |
| 47 | Provision for Photo charges |
| 48 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} Please Enable Macros to View BoQ information |