| 1 | Demolishing/Chipping/Removing of existing RCC membersmanually / by mechanically means without damaging other structures, separate the reinforcement bars and handover the same to Disposal section by weighment and stack the unserviceable material within 50 meters lead etc., complete all as directed. |
| 2 | Cutting of trees branches of the girthupto 60 cm and Shift & handed over the useful materials to disposal section in the Yard etc., complete all as directed. |
| 3 | Chip unsound/weak concrete material from slabs, Beams, Columns of thickness varies 25mm to 150mm with standard power driven percussion type or pneumatic chisel of standard make as directed by Engineer incharge including tappering all edges, making square shoulders of cavities etc., complete and disposal of debris upto 50mts and all lifts ad all specified and directed by Engineer.Upto - 11.00 m |
| 4 | Chip unsound/weak concrete material from slabs, Beams, Columns of thickness varies 25mm to 150mm with standard power driven percussion type or pneumatic chisel of standard make as directed by Engineer incharge including tappering all edges, making square shoulders of cavities etc., complete and disposal of debris upto 50mts and all lifts ad all specified and directed by Engineer.Above - 11.00 m |
| 5 | Provide and place in position micro concrete (M-40) which shall be cement based prepacked component such as Rendrock - RG of fosroc make or equivalent mixed with 6mm size coarse aggregate in specified percentage by weight subjecting to the maximum of 50% as dtrected by the engineer incharge including mixing with suitable and approved mixing machine, pumping of concrete under pressure where ever required to ensure that the concrete laid for encasement is dense, properly compacted and free from honey combs as directed by the engineer in charge. |
| 6 | Provide and fix water leak proof steel centering and shuttering to diaphragm walls, columns, beams, deck slabs, pile caps, column heads etc., including application of approved form release coating, strutting, braing, propping etc., keep the same in position during concreting and removal of the same in position during concreting specified period etc., for straight/inclined shuttering, keeping necessary provision for inserts projecting dowels and necessary scaffolding and all specified and directed by Engineer - in - charge.Upto - 11.00 m |
| 7 | Provide and fix water leak proof steel centering and shuttering to diaphragm walls, columns, beams, deck slabs, pile caps, column heads etc., including application of approved form release coating, strutting, braing, propping etc., keep the same in position during concreting and removal of the same in position during concreting specified period etc., for straight/inclined shuttering, keeping necessary provision for inserts projecting dowels and necessary scaffolding and all specified and directed by Engineer - in - charge.Above - 11.00 m |
| 8 | Providing and fixing double scaffolding system (Cup lock type) on the exterior side of building/structure, upto 25m height, above ground level, including additional rows of scaffolding in stepped manner as per site requirement. complete all as directed by the Engineer in Charge. |
| 9 | Providing plain cement concrete 1:2:4 nominal mix using 20 mm graded crushed granite aggregate including mixing, depositing in position, tampering, finishing, curing including all materials & labbour in flooring and top of roof level for fixing of wooden members and levelling course etc., complete all as directed. |
| 10 | Providing and laying reinforced cement concrete work in design mix of M25 grade in foundations, beams, columns, waist slab, sunshades etc. wherever required. (Design mix should be submitted by vendor at the time of execution with laboratary report) excluding the cost of centering, shuttering and reinforcement but including cost of Cement (OPC 53 Grade-UltraTech, ACC,Nagarjuna & KCP) and all other materials & men etc., complete |
| 11 | Providing 15mm thick Polymer modified mortar Plaster with CM (1:4) to walls at all heights,projections,narrow bands,old wall surfaces, concrete surfaces and widths etc., including cost of all materials , tools, plant and labour, scaffolding arrangements and curing all as per specifications and directions of the engineer. |
| 12 | Providing 15mm thick Plaster with CM (1:4) to walls at all heights and widths etc., including cost of all materials , tools, plant and labour, scaffolding arrangements cand curing all as per specifications and directions of the engineer. |
| 13 | Construction of Brick work with common burnt clay F.P.S (Non-Modular) light weight bricks of class designation 7.5 in superstructure above plinth level upto floor V level in all shapes and sizes in cement mortar 1:6 (1 Cement : 6 coarse sand) including cost of cement (PPC - Ramco) and all materials etc., complete. |
| 14 | Drilling of 12mm to 20 mm dia,200mm deep holes into the stone masonry wall/RCC structures/ slab etc., using mechanically operated hammer drilled diamond core cutting machine including grouting LOCK FIX or FOSROC make or its equivalent comlete all as directed. |
| 15 | Supply and providing HYSD bar reinforcement of Fe-550D grade of approved make SAIL / RINL / TISCO including transportation, straightning, cutting, bending and binding with annealed binding wire of 18 gauge (1.22mm dia) complete all labour and material etc., complete all as directed |
| 16 | Apply two coats of premium quality weather proofing arcylic Exterior emulsion paint over a one coat of primer, reqired shade to wall surfaces from approved brands Asian paints (apex ultima),Berger (All guard) where ever specified by Engineer in charge. |
| 17 | Providing two(2) coats of synthetic enamel paint for doors, windows, grills etc., of required colour using approved branded paints like Asian / Berger / Nerolac, after removal of rust using wire brush or sand paper to give an even shade on old work including applying one coat of zinc rich primer complete all as directed |
| 18 | Felling trees of the girth beyond 120 cm girth upto and including 240cm girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and dispose the unserviceable material out side the HSL premises and shift the good wood to Disposal Section located inside the Yard etc., complete all as directed. |
| 19 | Clearing of jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level, removal of rubbish including disposal of all debris outside HSL premises as directed by Engineer In charge. |
| 20 | Cleaning of water storage tank at all heights with coconut brushes, duster etc., removal of silt, rubbish from the tank and cleaning the tank with fresh water disinfecting with bleaching powder including marking the date of cleaning on top of the tank as directed by the Engineer In Charge |
| 21 | Clean the Rust, over and behind a reinforcement bars upto 25mm dia by manual methods hammering the rebar, using wire brush, chesieling to form a totally rust free finishing surface throughout length of bars complete all as directed including necessary scaffolding etc., |
| 22 | Supply and apply the NitoZinc primer of fosroc make to the existing prepared surface of reinforcing bars to protect from corrosion complete all as directed. |
| 23 | Disposal of debries, surplus excavated earth, unserviceable material outside the HSL premises toprivate dumping yard up to 20Km lead (not to dump in HSL yard dumping area & surrounding areas) it is the responsibility of the firm to ensure no objection shall be raised by Muncipal authorities / from any bod. If any dispute arises the agency has to sort out at their own risk etc., complete all as directed. |
| 24 | Fabricating of structural steel by straightening, cutting and welding by using departmental suppied all types of steel sections such as plates, flats, pipes, angles etc of any size including erecting in position to line and level and applying two coats of paint over one coat of zinc rich primer, hire charges for tools and plants, other incidentals and all consumables etc. complete as directed by Engineer-in-charge. Note: weight shall be measured as per actual weight of material consumed at site. (steel issued free by HSL but loading and unloading is in contractros scope)(The nature of work is at a level of (+) 3.0 to (+) 15.00) |
| 25 | Providing and fixing of 50 mm dia nominal bore G.I. pipes complete with G.I. fittings including trenching and refilling etc. for External work |
| 26 | Supply and application of concrete curing compound to the finished concrete surface immediately after stripping the form work with CONCURE-WS of Fosrock or its equivalent approved by Engineer in Charge as per the manufacurers recommendations and as directed including necessary scafolding. |