|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 3 | P/L in position Cement conc. 1 cement:3fine sand:6graded crushed stone agg. 20 mm excluding the cost of centring & shuttering all work upto plinth level. |
| 4 | Centring and shuttering including strutting, propping etc and removal of form work for.- FOUNDATION |
| 5 | Providing and laying in position 50mm thick cement concrete Flooring in 1 cement:2 fine sand:4 graded crushed stone aggregates 20mm size |
| 6 | Providing and laying river bed material on the road surface by way of spreading the same in uniform layer not exceeding 20cm in depth , watering and compacting with vibratory PRR of 8-10 tonne capacity including carriage of material from source to site of work (all lead lift complete) |
| 7 | Providing, laying spreading and compacting graded stone aggregate (size range 53mm to 0.075mm) to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant, carraige of mixed material by tipper to site, for all leads and shifts, laying in uniform layers with mechanical paver finisher in sub-base/ base course on prepared surface and compacting vibratory roaller of 8-10 tonne capacity to achieve the desire density, complete as per specifications. |
| 8 | Engaging backhoe (like JCB) for clearance of slips/back cutting for providing motorpath including hire charges, cost of POL , all sort of sunderies and taxes complete including disposal of Excavated earth/Mulba wherever Required. |
| 9 | Engagement of Labour for Cleaning of Drain,Berm dressing etc |
| 10 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared |
| 11 | Removal of debris including shifting of mulba from site to dumping yard by engaging Tractor with Trolley. |
| 12 | steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 13 | Engaging welder for Repair of existing damaged door window which includes strengthening of fencing and hiring of welding set . |
| 14 | Carriage of sand/dust with in avg. lead 10 KM BY MT |
| 15 | Carriage of Aggregate below 40 mm with in avg. lead 10 km by M.T |
| 16 | Carriage of Aggregate above 40mm with in avg. lead 10 km by M.T. Please Enable Macros to View BoQ information |