| 1 | 2 Mega Pixel Network Outdoor IR PTZ Camera | 2 Mega Pixel Network Outdoor IR PTZ Camera - As per Technical Specification |
| 2 | 8 Channel Network Video Recorder | 8 Channel Network Video Recorder (1+1) with 30 days backup - Primary & Redundant - As per Technical Specification |
| 3 | Workstation with Monitor For Remote Viewing | Workstation with Monitor For Remote Viewing - As per Technical Specification |
| 4 | Layer 3 Managed Switch Primary and Redundant | Layer-3 Managed Switch. - Primary & Redundant- As per Technical Specification |
| 5 | Layer 2 8 Ports x 1G PoE Plus Plus Managed switch | Layer-2 8 Ports x 1G PoE++ Managed switch - As per Technical Specification |
| 6 | 1G Single Mode SFP Transceiver Module | 1G Single Mode SFP Transceiver Module - As per Technical Specification |
| 7 | 1G Ethernet RJ45 SFP Transceiver Module | 1G Ethernet RJ45 SFP Transceiver Module - As per Technical Specification |
| 8 | RF Link Point to MultiPoint radio with minimum 3 Km range with accessories | RF Link Point to MultiPoint radio with minimum 3 Km range with accessories. (Set of 01 BTS and 04 Subscriber Module) - As per Technical Specification |
| 9 | 24 Core Single Mode Armoured Optical Fiber Cable | 24 Core Single Mode Armoured Optical Fiber Cable - As per Technical Specification |
| 10 | 24 Port loaded Optical Fiber LIU | 24 Port loaded Optical Fiber LIU - As per Technical Specification |
| 11 | 6 Port loaded Optical Fiber LIU | 6 Port loaded Optical Fiber LIU - As per Technical Specification |
| 12 | Optical Fiber Patch Cord LC LC 3 Mtrs | Optical Fiber Patch Cord-LC-LC 3 Mtrs - As per Technical Specification |
| 13 | Cat6 4 Pair Unshielded Twisted Pair Cable | Cat6 4 Pair Unshielded Twisted Pair Cable - LSZH (Indoor Purpose)- As per Technical Specification |
| 14 | Cat6 UTP Patch Cord 2 Mtr | Cat6 UTP Patch Cord-2Mtr - As per Technical Specification |
| 15 | Cat6A STP Patch Cord 2 Mtr | Cat6A STP Patch Cord-2Mtr - As per Technical Specification |
| 16 | Cat6A STP Patch Cord 5 Mtr | Cat6A STP Patch Cord-5Mtr - As per Technical Specification |
| 17 | Cat6A STP Patch Cord 15 Mtr | Cat6A STP Patch Cord-15Mtr - As per Technical Specification |
| 18 | Cat6A STP Patch Cord 30 Mtr | Cat6A STP Patch Cord-30Mtr - As per Technical Specification |
| 19 | Cat6 UTP Information Outlet | Cat6 UTP Information Outlet with 2x Keystone Jack + 1x Gang Box + 1x Dual Socket Face Plate - As per Technical Specification |
| 20 | 27 U Floor Mount Rack with accessory | 27U Floor Mount Rack with accessory - As per Technical Specification |
| 21 | 17 U Floor Mount Rack with accessory | 17U Floor Mount Rack with accessory - As per Technical Specification |
| 22 | 6 U Pole Mount Rack with accessory | 6U Pole Mount Rack with accessory- As per Technical Specification |
| 23 | Galvanized Pole 12 Mtr Camera Mounting Poles for PTZ Camera | Galvanized Pole 3 or 6 or 12 Mtr Camera Mounting Poles for PTZ Camera - As per Technical Specification and site requirement |
| 24 | 5 KVA Online UPS in Parallel Redundancy mode with 60 minutes battery backup in each UPS | 5 KVA Online UPS in Parallel Redundancy mode with 60 minutes battery backup in each UPS - As per Technical Specification |
| 25 | 4 Core 6 MM Armoured Copper Electrical Cable | 4 Core 6 MM Armoured Copper Electrical Cable - As per Technical Specification |
| 26 | Electrical Box with 25 Amp MCB | Electrical Box with 25 Amp MCB 15- or 16-Amp Socket at Rack End |
| 27 | 2 x 15 or 16 Amp Shuttered switch socket Combined with Cover Plate and back box at Control Room End | 2 x 15/16 Amp Shuttered switch socket Combined with Cover Plate and back box at Control Room End |
| 28 | DB with 1 x 40 Amp DP and 4 Nos SP 25 AMP MCB For UPS End | DB with 1 x 40 Amp DP and 4 Nos SP 25 AMP MCB For UPS End |
| 29 | DB with 1 x 40 Amp DP and 2 Nos SP 25 AMP MCB For UPS End | DB with 1 x 40 Amp DP and 2 Nos SP 25 AMP MCB For UPS End |
| 30 | DB with 1 x 40 Amp DP | DB with 1 x 40 Amp DP |
| 31 | 40MM dia HDPE pipe with all fixing accessories for Outdoor installation | 40MM dia HDPE pipe with all fixing accessories for Outdoor installation |
| 32 | 25MM PVC Pipe with all fixing accessories for Indoor | 25MM PVC Pipe with all fixing accessories for Indoor |
| 33 | 25MM PVC Flexible Pipe for Indoor | 25MM PVC Flexible Pipe for Indoor |
| 34 | 25 or 32mm PVC Reinforceable flexible Pipe | 25 or 32mm PVC Reinforceable flexible Pipe |
| 35 | Supply Installation Testing and Commissioning of earthing with copper earth plate | Supply Installation Testing and Commissioning of earthing with copper earth plate 600mm x 600mm x 3.15mm thick including accessories and providing masonry enclosure with cover plate hanging lock arrangement and watering pipe of 2.7 meters long ect. with charcoal/coke and salt as required. Conventional earthing using copper plates as per IS 3043 |
| 36 | Supply Installation Testing and Commissioning of 25 mm x 5 mm copper strip at 0.50 Meter below ground as strip earth electrode | Supply Installation Testing and Commissioning of 25mm x 5mm copper strip at 0.50 Meter below ground as strip earth electrode in 40mm Dia GI pipe from earth electrode, including connection/terminating with nut, bolt, spring, washer, etc. as required. (Jointing shall be done by overlapping and with 2 sets of brass nut bolt and spring washer spaced at 50mm) |
| 37 | Supply Installation Testing and Commissioning of 4mm Dia copper wire | Supply Installation Testing and Commissioning of 4mm Dia copper wire with clamps/tie with GI pipe of LA and connection/termination with copper body of LA and copper strip at bottom of LA through nut/bolt/spring washer etc. as required for earthing etc. complete as required. |
| 38 | Supply Installation Testing and Commissioning of providing joints by using brazing technique | Supply Installation Testing and Commissioning of providing joints by using brazing technique of 25 mm x 5 mm copper/GI strip on surface or in recess for connections to another copper/GI earth strip for interconnection to all earths of lightening arrestors, counterpoise, equipment and electrical power supply earthing etc. as required. |
| 39 | Supply Installation Testing and Commissioning of copper bonded rod with low carbon steel high tensile strength copper bonded rod with min 254 microns of copper plating | Supply Installation Testing and Commissioning of copper bonded rod with low carbon steel, high tensile strength copper bonded rod with min 254 microns of copper plating. Diameter - 17.2 mm length- 3 meters, material- copper bonded, coating thickness - 250 microns, min 20 kg backfilled compound, material carbon based backfill/earthing compound, fulgurite formation test at direct lightening (10/350 microseconds), tested form laboratory having accreditation from (KEMA/VDE/Dakks/ILAC/NABL), lightening long duration test at 100C No fulgurites/pass, environmentally friendly RoHS certified, Resistivity - less than 0.12. M, complying standard-IEC 62561-7, testing approvals certified from NABL accredited laboratories. Poly plastic pit cover of material- Polymer body and cover. |
| 40 | Excavation of soil for making trench | Excavation of soil for making trench of size (Depth Min. 75cm, width min 35 Cm) including provision of sand and /Concrete/Bricks etc. for laying Fiber Optic Cable/Power Supply Cable & Refilling/backfilling of the trench with excavated soil - as required and making good the same as per site condition |
| 41 | Laying or fixing of HDPE Conduit or pipe Underground or surface complete as required as per site condition | Laying/fixing of HDPE Conduit/pipe Underground/surface complete as required as per site condition. |
| 42 | Laying of 25MM PVC Pipe | Laying of 25MM PVC Pipe with all fixing accessories for Indoor with all fixing accessories on/above of false celling or fixing on wall including fixing of suitable saddle /screws etc as required as per site conditions |
| 43 | Laying of 25MM PVC Flexible Pipe for Indoor complete as required | Laying of 25MM PVC Flexible Pipe for Indoor complete as required. |
| 44 | Laying of 25 or 32mm PVC Reinforceable flexible Pipe complete as required | Laying of 25/32mm PVC Reinforceable flexible Pipe complete as required. |
| 45 | Laying of Optical Fiber Cable end to end ferruling labeling and termination through GI Conduit or PVC Pipe complete as required | Laying of Optical Fiber Cable end to end ferruling labeling & termination through GI Conduit/PVC Pipe complete as required. |
| 46 | Laying of Cat6 UTP end to end ferruling labeling and termination through PVC Pipe complete as required | Laying of Cat6 UTP end to end ferruling labeling & termination through PVC Pipe complete as required. |
| 47 | Laying of Electrical Cable end to end ferruling labeling and termination through GI Conduit or PVC Pipe complete as required | Laying of Electrical Cable end to end ferruling labeling & termination through GI Conduit/PVC Pipe complete as required. |
| 48 | Mounting and Fixing of GI Pole after excavation of soft or hard soil including cutting of bituminous road or pavement | Mounting & Fixing of GI Pole after excavation of soft or hard soil including cutting of bituminous road or pavement upto desired depth and making suitable foundation for erection of the GI pole complete as required. |
| 49 | Mounting Fixing Labeling and Dressing of Floor Standing Rack complete as required | Mounting, Fixing, Labeling & Dressing of Floor Standing Rack complete as required |
| 50 | Mounting Fixing Labeling and Dressing of 6U Pole Mount Rack complete as required | Mounting, Fixing, Labeling & Dressing of 6U Pole Mount Rack complete as required |
| 51 | Mounting Fixing and Labeling of All Types of Cameras complete as required | Mounting, Fixing and Labeling of All Types of Cameras complete as required |
| 52 | Installation Splicing of all OFC core Rack to Server Rack Labelling testing and commissioning | Installation Splicing of all OFC core (Rack to Server Rack), Labelling, testing & commissioning of 6/12/24 Port LIU with all its accessories. |
| 53 | Installation of DB | Installation of DB with 1 x 40 Amp DP, 4 Nos. SP 25 AMP MCB, 1 x 40 Amp DP, 2 Nos. SP 25 AMP MCB and 4 Nos. DP 40 AMP DP at UPS End |
| 54 | Installation of 2 x 15- or 16- Amp Shuttered switch socket Combined with Cover Plate and back box For Surveillance Room End | Installation of 2 x 15- or 16-Amp Shuttered switch socket Combined with Cover Plate and back box For Surveillance Room End |
| 55 | Installation of Electrical Box with 25 Amp MCB 15 or 16 Amp Socket at Rack End | Installation of Electrical Box with 25 Amp MCB 15/16 Amp Socket at Rack End |
| 56 | Installation Testing and Commissioning of 5KVA Online UPS with 60 Min Backup including UPS output Electrification complete as required | Installation, Testing & Commissioning of 5KVA Online UPS with 60 Min Backup including UPS output Electrification complete as required |
| 57 | Installation Testing and Commissioning of NVR Primary and Redundancy complete as required | Installation, Testing & Commissioning of NVR - Primary & Redundancy complete as required. |
| 58 | Termination and Fixing of Category 6 UTP Information Outlet | Termination & Fixing of Category 6 UTP Information Outlet |
| 59 | Mounting Fixing Installation and Configuration of All Types of Switches complete as required | Mounting, Fixing, Installation & Configuration of All Types of Switches complete as required |
| 60 | Installation and Configuration of WorkStation complete as required | Installation & Configuration of WorkStation complete as required |
| 61 | Installation and Configuration of Point to MultiPoint radio with accessories complete as required | Installation & Configuration of Point to MultiPoint radio with accessories complete as required |
| 62 | Testing commissioning certification providing 3 sets of completion diagram and Documentation of Entire Project complete as required | Testing, commissioning, certification, providing 3 sets of completion diagram & Documentation of Entire Project complete as required |