| Sl. No. | Item Description |
| 1 | S&F in repairs Tubes medium grade galvanised, withall fitting and fixed complete to walls and ceilings or laidin floors of following sizes:- |
| 2 | 50 mm bore |
| 3 | 80 mm bore |
| 4 | 100 mm bore |
| 5 | S&F in repairs rotational moulded polyethylene water storage tanks (cylindrical vertical with closed top) ISI marked minimum 2 layers hoisted and fixed in position as make up water tank of following capacity:- |
| 6 | 500 Ltrs |
| 7 | 1000 Ltrs |
| 8 | S&F in repairs ball valves, high pressure of PTMT with epoxy coated aluminium rod and high density plastic ball screwed for iron pipe of following sizes :- |
| 9 | 20 mm (Minimum weight - 210 gms) |
| 10 | 25 mm (Minimum weight - 455 gms) |
| 11 | Supply, assembly and erection of GI sheet rectangular/ square air ducts with TDF flange system, fabricated out of ‘L’-shaped hollow profile, factory boxed, including all accessories such as corners, cleats, carriage bolts, neoprene gasket and approved sealant on longitudinal joints, etc in conformity with IS: 655 and approved drawings, complete for the following sheet thicknesses as required:- |
| 12 | 26 Gauge |
| 13 | 24 Guage |
| 14 | 22 Gauge |
| 15 | Supply and lay in repairs M S Pipes heavy grade with all fittings laid in floors or fixed to walls and ceilings etc with all accessories of following sizes:- |
| 16 | 50 mm dia |
| 17 | 65 mm dia |
| 18 | 80 mm dia |
| 19 | S&F in repairs butterfly valve including required nuts, bolts, washers for following sizes:- |
| 20 | 50mm dia |
| 21 | 65 mm dia |
| 22 | 80 mm dia |
| 23 | 100 mm dia |
| 24 | Attending complaints of Air Conditioning Plants and Walk-in Coolers by qualified Refrigeration Mechanic / Electrician / Technician, for non-functioning or defective components including compressors, blower motors, condenser pumps, chiller pumps, cooling tower fans, AHUs, electrical control panels and all associated parts of AC plant, at any location any capacity any make and model, and rectifying the same comprising of following scope of work and service level requirements:- |
| 25 | Scope of work:-(a) Prompt attendance to complaints related to breakdown or malfunction of AC plants / walk-in coolers.(b) Diagnosis and rectification of faults in mechanical, electrical and control components.(c) Minor repairs, adjustments, resetting of controls and restoration of services.(d) Deployment of qualified and experienced technician having working knowledge of AC plants. |
| 26 | Item No 7 contd......(e) Provision of all necessary tools, tackles (T&P), testing instruments and safety equipment required for attending and rectifying complaints.(f) Unserviceable spare parts are not in the scope of work and the same shall be measured and paid separately under relevant item of the schedule.Service level requirements:-(i) Complaint shall be attended immediately and within one (01) hour of intimation.(ii) Rectification shall be completed on the same day at the earliest, without affecting continuity of essential services, as far as practicable.(iii) 24×7 complaint attendance through phone and physical attendance as required.(iv) Complaints shall be attended only by designated qualified Technician knowledgeable in AC plant systems. |
| 27 | Descaling and chemical cleaning of condensor tubes of Central AC Plant including disconnecting the condensor from the system, circulation of approved descaling solution usingdescaling pump of suitable capacity, mechanical cleaning condensor tubes by nylon brushes & mild steel rods of appropriate size, thorough flushing with clean water and making the system fully operational including renewal of suction water filter for the following capacity AC Plants:- |
| 28 | 3 x 15 TR |
| 29 | 3 x 9 TR |
| 30 | 2 x 7.5 TR |
| 31 | 3 x 45 TR |
| 32 | 3 x 80 TR |
| 33 | 3 x 37.5 TR |
| 34 | 1 x 60TR |
| 35 | 3 x 50 TR |
| 36 | 3 x 75 TR |
| 37 | Carrying out pressure leak testing of Central AC plant of any size and capacity using dry nitrogen gas, for checking leak-proofness of valve joints, seals, brazed joints and all connected controls/components, complete, including identification and rectification of leaks/defects (if any), and maintaining constant test pressure of 160 PSI on low side and 200 PSI on high side for a minimum duration of 24 hours complete. |
| 38 | Cleaning of AHU cooling coils by opening front/ access panels of AHU and carrying out cleaning by high-pressure compressed air, followed by application of approved non-corrosive chemical descaling/coil cleaning solution, and thereafter washing with pressurised water jet pump, complete, reassembling AHU panels after cleaning, including cleaning of AHU rooms, supply air grills and return air grills and minor repair to duct insulation for missing/damaged portions complete for the following capacity Central AC Plants:- |
| 39 | 3 x 15 TR |
| 40 | 3 x 9 TR |
| 41 | 2 x 7.5 TR |
| 42 | 3 x 45 TR |
| 43 | 3 x 80 TR |
| 44 | 3 x 37.5 TR |
| 45 | 1 x 60TR |
| 46 | 3 x 50 TR |
| 47 | 3 x 75 TR |
| 48 | The scope of work item includes:-(a) Opening and refixing of AHU access panels, fasteners, gaskets, etc.(b) Removal of dust, dirt, scale, grease and biological deposits from cooling coils without damage to fins or headers.(c) Use of approved chemicals compatible with copper/aluminium fins.(d) Cleaning of AHU room floor, drain trays and surroundings.(e) Cleaning of supply and return air grills/diffusers connected to AHU. |
| 49 | Item No 38 contd...........(f) Minor repairs to duct insulation using matching insulation material, aluminium foil/tape and adhesive.(g) Removal of debris and disposal outside MES premises.(h) Testing of AHU for proper airflow and satisfactory operation after completion. |
| 50 | S&F in repairs of Poly-F Plus PB classical V-belts of approved make, any type including checking of belt alignment, pulley condition, proper tensioning, replacement of worn-out belts, and testing after installation of the following series:- |
| 51 | A Series |
| 52 | B Series |
| 53 | Taking out oil filter of compressor, dismantling carefully, cleaning the oil filter by using diesel to remove sludge, carbon deposits and impurities, drying thoroughly, and refixing the same in its original position with new gasket set, including testing for oil leakage after refitting and applicable for the following makes and models of compressors:- |
| 54 | Make - Freeze King, Model - FK - 750 |
| 55 | Make - ACCEL, Model SMC 3 - 65 |
| 56 | Make - ACCEL, Model SMC 4 - 100 |
| 57 | Taking out the defective hand shut-off valve of pressure gauge and S&F new hand shut-off valve of ¼″ dia, of approved make and quality, including isolation of system, removal of defective valve, supply and fixing of new valve with suitable thread sealant, testing for leakage and proper operation complete. |
| 58 | Taking out the defective safety valve from compressor Make: ACCEL, Model: SMC-4-65, after isolating and depressurising the system, and S&F new safety valve of approved make, size and pressure rating, compatible with the compressor, including refixing with suitable thread sealant/gasket, testing for leakage and proper operation, complete. |
| 59 | Taking out the defective condenser safety valve, suitable for working pressure of 350 PSI, after isolating and safely depressurising the condenser system, and S&F new safety valve of approved make and material, havingworking pressure not less than 350 PSI, complete, including fixing with suitable gasket/thread sealant, testing for leakage and proper operation complete. |
| 60 | S&F in repair temperature sensor with controlling/ signal cable of approved make and electrical characteristics, suitable and compatible for Central AC Plants including proper termination, calibration, testing and commissioning for the following:- |
| 61 | ACCEL Model Plants |
| 62 | Scroll Model Plants |
| 63 | S&F in repair of chilled water thermistor temperature sensor with controlling/signal cable, suitable for fixing in existing chiller sensor socket/groove, matching electrical characteristics and compatible with existing chiller control system, proper termination, calibration and testing complete. |
| 64 | Taking out the defective relief valve after isolating and depressurising the system, and supply and fixing of new relief valve of approved make, size and pressure rating, compatible with the existing Central AC plant upto 75 TR, including refixing with suitable gasket/ thread sealant, testing for leakage and proper operation complete. |
| 65 | Removing defective heater and supply and fixing of new electric strip heater of approved make of capacity 2 to 3 kW, suitable for fitting in existing plenum / fitment stands, compatible with existing electrical and mechanical arrangement, including proper electrical connections with heat-resistant cables/lugs, insulation, alignment, testing and commissioning complete. |
| 66 | S&F thermal insulation to supply and return air ducts using 19 mm thick closed-cell nitrile rubber (XLPE type) insulation sheets, factory laminated with one-side aluminium foil vapour-barrier facing, fixed to duct surfaces with manufacturer’s recommended rubber-based adhesive, uniformly applied and pressed at 40–60 kg/sq cm to ensure complete and permanent bonding, including sealing of all longitudinal and transverse joints, edges and overlaps with compatible aluminium foil adhesive tape, and including insulation to bends, elbows, offsets, reducers, take-offs and all fittings complete. |
| 67 | Scraping of old painted surfaces of central type AC plant of any capacity, including removal of loose/flaking paint, rust, grease and dirt, followed by preparation of surfaces for smooth finish, and M&L for spray painting with approved colour and shade, complete. The item includes spray painting and colour coding of the following equipment and systems:-(a) Compressors, condensers and associated accessories.(b) Monoblock pumps, compressor motors and motor starters.(c) LT panel boards, including marking of incoming and outgoing electrical connections.(d) Water supply and discharge pipelines, cooling tower, supply and discharge lines.(e) Refrigerant liquid lines, suction/discharge lines, AHUs and connected accessories. |
| 68 | The item 67 also includes the following markings and signage:-(i) Arrow marking to indicate direction of flow for refrigerant system, water supply system and other connected services, with approved colours.(ii) Marking of SM/MES numbers with black enamel paint of approved size and font.(iii) Identification and colour coding of refrigerant system, condenser water system, chilled water system, etc.(iv) Glow sign boards for AC plant and operator room, painted with approved lettering and symbols on blue background complete. |
| 69 | S&F in repairs of analogue pressure gauge for existing pipelines and plants, of suitable dial diameter, pressure range and model as required at site, including provision and fixing of MS bend pipe/syphon up to the gauge wherever required, complete. |
| 70 | S&F in repairs of temperature gauge for existing pipelines of Central AC plants, of suitable dial size, temperature range and model, compatible with existing installation, including removal of defective gauge, supply and fixing of new gauge with suitable fittings/thermowell (where required), testing and commissioning complete. |
| 71 | S&F fresh compressor oil of approved make and grade, suitable for the existing compressor/AC plant, including supply, filling and topping-up at different locations within Lucknow Cantt, with lead not exceeding 6 km complete. |
| 72 | S&F in repairs of thermostatic/electronic expansion valve (as applicable) of approved make, size and capacity rating, compatible with existing refrigerant and system after isolating and depressurising the refrigerant system suitable for Central AC plant of capacity not less than 20 TR including insulation of sensing bulb (where applicable), leak testing, charging check and commissioning complete. |
| 73 | Taking down old GI pipe and supplying and fixing new GI pipe medium grade with all fittings fixed to wall/ ceiling/ floor of the following size :- |
| 74 | 65 mm dia |
| 75 | 125 mm dia |
| 76 | S&F in repair of CI ‘Y’ strainer of the following sizes in condensing water / chilled water pipeline including dismantling of existing strainer, cleaning and repair as required, modification/alteration of pipeline for proper fixing of strainer, and replacement of nuts, bolts, gaskets/packing and fasteners complete. |
| 77 | 65 mm dia |
| 78 | 80 mm dia |
| 79 | 100 mm dia |
| 80 | 125 mm dia |
| 81 | Dismantling of defective condenser/chiller pump motor after disconnecting electrical connections from motor terminals, dismantling and opening of motor, removal of defective bearings, water seal, gland bush, gland packing, terminal box, nut bolts and all worn-out gaskets/ rubber parts, followed by reassembling the motor with serviceable/new components as required, painting to restore original finish, refixing the motor at the same location, reconnection of all electrical connections, testing and commissioning of the following capacity motors:- |
| 82 | Upto 5 HP |
| 83 | Above 5 HP and upto 12.5 HP |
| 84 | Dismantling of defective condenser/ chiller pump motor , after disconnecting electrical connections from motor terminals, dismantling from foundation and transporting to local workshop, including removal of bearings, re-metalling of bearing housing/shaft, machining and turning to required size, thorough cleaning of stator and rotor, rewinding with Super Enamelled Copper (SEC) insulated wire of same gauge and turns as existing, proper insulating, varnishing and drying, re-assembling the motor, painting to restore original finish, transport back to site and fixing on foundation, reconnection of electrical connections, testing and commissioning of the following capacity motor:- |
| 85 | Upto 5 HP |
| 86 | Above 5 HP and upto 7.5 HP |
| 87 | Dismantling of defective Cooling Tower (CT) fan motor including disconnecting electrical connections, removal of fan blades/bush, opening of motor covers, taking out burnt winding, thorough cleaning of stator and rotor, rewinding with Super Enamelled Copper (SEC) wire of existing size and gauge, proper insulating, varnishing, heating and baking, reassembling the motor, replacement of motor bearings of existing size, complete, including transportation of motor from site to workshop and back, refixing in position, reconnection of electrical wiring, refixing and balancing of fan, testing and recommissioning of the following capacity motors:- |
| 88 | Upto 3 HP |
| 89 | Above 5 HP and upto 7.5 HP |
| 90 | S&F in repairs of FRP type cooling tower fill (fins), comprising eleven layers, each of brick size 600 × 30 × 150 mm, of approved quality and thickness, including removal of old/ damaged fills, supply and fixing of new FRP fills in position, proper alignment, interlocking/ stacking as required, ensuring uniform water distribution and airflow complete. |
| 91 | S&F in repairs PVC spray nozzles of 20 mm dia of approved make and design, ensuring proper seating, alignment and uniform water distribution suitable for rectangular type cooling tower complete. |
| 92 | S&F in repairs heavy-duty plastic mesh for cooling tower, having mesh size not more than 10 mm × 10 mm, of approved quality and thickness, including supply and fixing with necessary fixing arrangements such as clamps, fasteners, ties, frames or supports as required, ensuring proper fitment, rigidity and long service life complete. |
| 93 | S&F in repairs cooling tower fan blade suitable for existing cooling tower fan hub, of same length, pitch and size as existing at site, manufactured from aluminium alloy material, including supply and fixing with necessary nuts, bolts and washers, proper alignment, balancing, testing and commissioning, complete of the following capacity:- |
| 94 | Upto 30 TR Cooling Tower |
| 95 | Above 30 TR and upto 150 TR Cooling Tower |
| 96 | Monthly servicing of cooling tower for Central AC Plant up to 100 TR capacity including washing of PVC fill media using mild detergent solution, thorough rinsing with clean water, cleaning of cooling tower bottom tank/basin by removing mud, silt, algae and dust, and cleaning of pot strainer after dismantling the strainer, including removal and refixing of nuts, bolts and fasteners of various sizes as required at site. |
| 97 | M&L for painting of central AC plant cooling tower of capacity up to 100 TR, including preparation of existing surfaces by scraping, wire brushing, cleaning and removal of loose/flaking paint, rust, grease and dirt, and application of two coats of synthetic enamel spray paint of existing approved colour, including marking of cooling tower complete. |
| 98 | Dismantling of defective AHU motor including blower after disconnecting electrical connections from motor terminals, dismantling motor and blower assembly, opening of motor covers, removal of burnt winding, thorough cleaning, rewinding with Super Enamelled Copper (SEC) wire of existing size, gauge and turns, proper insulating, varnishing, heating and baking, replacement of motor bearings of existing size, complete, including transportation of motor from site to workshop and back, reassembling, refixing in position, reconnection of electrical connections, refixing and tensioning of blower belt, alignment of motor with blower, testing after repair and recommissioning of the following capacity motors:- |
| 99 | 3 HP |
| 100 | Above 3 HP and Upto 7.5 HP |
| 101 | Supply, installation, testing and commissioning in repair of factory-made built-up cooling coil of size 76″ × 32″ × 10″, comprising GI casing, copper tubes and MS headers, 03 rows deep, suitable for 3 × 39 TR Central AC plant AHU, including removal of defective coil (if required), supply and fixing of new cooling coil in existing AHU, proper alignment, connection with existing chilled water/refrigerant piping, testing for leakage and performance and commissioning complete. |
| 102 | S&F in repairs of blower unit assembly (excluding fan motor), suitable for Central AC plant up to 78 TR capacity, including blower casing, impeller, shaft, bearings, base frame, pulleys and belts, complete, including fabrication works such as cutting, welding, drilling and necessary modifications to suit and fix the blower unit with existing AHU, alignment with existing motor, testing and commissioning complete. |
| 103 | S&F in repairs of rigid PVC piping of 40 mm dia, laid up to drain disposal area, suitable for chilled water/condensate drain application, including all fittings such as bends, tees, couplers, clamps and supports, complete, and providing and fixing suitable size nitrile rubber insulation (closed-cell type) to the pipe to prevent sweating/ condensation, complete. |
| 104 | Supplying, installation, testing and commissioning in repairs of thermally insulated flexible air duct of 200 mm dia, factory-made, comprising inner liner, insulation and outer vapour barrier jacket, fixed and supported at regular intervals using GI clamps/ hangers/ supports as per site requirement, conforming to SMACNA / relevant IS standards complete. |
| 105 | S&F in repairs of pre-filter (box type) having filtration efficiency not less than 90% for particles of size down to 20 microns, housed in GI casing of thickness 45/50 mm, suitable for AHU application, including necessary repairs/modifications to AHU filter frames to arrest air leakage, complete, of the following sizes:- |
| 106 | 600 mm x 600 mm |
| 107 | 600 mm x 300 mm |
| 108 | S&F in repairs of High Efficiency Particulate Air (HEPA) filter, having minimum efficiency 99.97% (EU-13 / H13) for particles down to 0.3 micron, comprising pleated fiberglass filter media, folded and separated by aluminium spacers, housed in a rigid metal frame, suitable for existing AHU/clean area application, including removal of defective filter, supply/repair and refixing, complete. |
| 109 | S&F in repairs of fine filter (EU-7 / F7 grade) having minimum filtration efficiency of 99% for particles down to 3 microns, box type, suitable for existing AHU application, comprising filter media of HDPE and non-woven synthetic media, constructed as HDHDPE – 1 ply + Non-woven synthetic media – 1 ply + Aluminium mesh – 1 ply, housed in aluminium frame complete |
| 110 | Monthly servicing of Air Handling Unit (AHU), including careful removal of complete air filters, cleaning by removal of dust using pressurised water, drying and refixing, greasing/lubrication of blower shaft and bearings, alignment of blower motor, tightening and adjustment of blower V-belts, and refixing of all components after servicing complete. |
| 111 | Taking out of water flow meter of Model: HFS-25 suitable for existing pipeline, having maximum working pressure of 10 bar and liquid temperature range from 01°C to 100°C,and supply and fixing of new flow meter of approved make and specifications, proper installation in line, testing and commissioning complete. |
| 112 | Cleaning of AC supply and return air ducts, including diffusers, dampers, coils and installed HVAC components, by robotic duct-cleaning system with video camera inspection, at CH (CC) for 05 Nos Operation Theatres (OTs), complete, including pre- and post-cleaning video recording, followed by bacteriological (air culture) testing after cleaning, and submission of test reports complete. |
| 113 | Cleaning of AC supply and return air ducts, including diffusers, dampers, coils and installed HVAC components, by robotic duct-cleaning system with video camera inspection, at Base Hospital for 04 Nos Operation Theatres (OTs), complete, including pre- and post-cleaning video recording, followed by bacteriological (air culture) testing after cleaning, and submission of detailed test reports complete. |
| 114 | Cleaning of AC supply and return air ducts, including diffusers, dampers, coils and installed HVAC components, by robotic duct-cleaning system with video camera inspection, at ICU AC Plants of CH (CC) / NEFRO / X-RAY AC Plants / CMDC AC Plants, complete, including pre- and post-cleaning video recording, followed by bacteriological (air culture) testing after cleaning, and submission of detailed test reports complete. |
| 115 | Disconnecting electrically three-phase, 440 Volt induction motor including unbolting and dismantling from foundation, transportation to contractor’s workshop, opening of motor, removal of burnt-out copper windings, thorough cleaning of stator slots using CTC/petrol, and rewinding with suitable size/gauge super enamelled copper wire, complete with proper insulation, varnishing and drying, replacement of damaged ball bearings of suitable size, reassembling the motor, transporting back to site, refixing at original position, making necessary electrical connections, testing and commissioning for the following capacity motors:- |
| 116 | 20 HP |
| 117 | 50 HP |
| 118 | 37.5 HP |
| 119 | 12.5 HP |
| 120 | Supply and charging of Refrigerant Gas in returnable sealed cylinder of approved make including transportation to site, charging into the refrigeration/ AC system to the required quantity and operating parameters, checking for leaks and satisfactory performance for the following:- |
| 121 | R-22 |
| 122 | R-407C |
| 123 | R-404A |
| 124 | R-134a |
| 125 | Dismantling of old unserviceable scroll compressor and Supply, installation, testing & commissioning of hermetically sealed scroll type compressor 3-phase, 415 Volts, 50 Hz compatible with the existing Central AC system including connecting suction and discharge lines by brazing with copper rod using oxygen flame, making electrical connections, wiring with sensors/controls, testing and commissioning of capacity not less than the following:- |
| 126 | 20 TR |
| 127 | 13 TR |
| 128 | 11 TR |
| 129 | 6.5/7.5 TR |
| 130 | 4.5/5 TR |
| 131 | 3/3.5 TR |
| 132 | 1.5 TR |
| 133 | Dismantling of old unserviceable condenser and Supply, installation, testing & commissioning of water-cooled shell and tube condenser of capacity not less than 13 TR, compatible with the existing Central AC system, complete, including connection of suction, discharge and liquid lines by brazing with copper rod using oxygen flame, making electrical connections, wiring with sensors/ controls, testing and commissioning complete. |
| 134 | Dismantling of old unserviceable chiller and supply, installation, testing & commissioning (in repair) of water-cooled shell and tube chiller of capacity not less than 13 TR, compatible with the existing Central AC system, complete, including connection of suction, discharge and liquid refrigerant lines by brazing/jointing with copper rod using oxygen flame, making electrical connections, wiring with sensors/ controls, testing and commissioning complete. |
| 135 | S&F in repairs of PLC (Microprocessor) controller unit with display, suitable for 37.5 TR Central AC Plant, Make: Blue Star, Model No.: XWC3S-039ARY, or equivalent approved controller, including supply, fixing, wiring, programming, testing and commissioning, complete, with the following minimum features or any other controls required to make the system fully functional and safe with following mandatory features:-(i) Run time equalization of compressors/components(ii) Auto start facility(iii) Non-volatile memory back-up for data and settings(iv) Built-in time delay for safe operation |
| 136 | S&F in repairs of PLC (Microprocessor) controller unit with display, suitable for 11 TR Central AC Plant, Make: Blue Star, or equivalent approved controller, including supply, fixing, wiring, programming, testing and commissioning, complete, with the following minimum features or any other controls required to make the system fully functional and safe with mandatory features:-(i) Run time equalization of compressors/components(ii) Auto start facility(iii) Non-volatile memory back-up for data and settings(iv) Built-in time delay for safe operation |
| 137 | Supplying, installation, testing and commissioning of soft / hard drawn copper refrigerant piping of the following nominal sizes, suitable for suction and liquid lines of Central AC/ Refrigeration systems including all fittings and accessories, brazing/jointing, vacuumisation and nitrogen pressure testing, adjustable ring-type hanger supports with cable tray etc as required for the following:- |
| 138 | 15 mm |
| 139 | 32 mm |
| 140 | 40 mm |
| 141 | S&F in repairs of PLC (Microprocessor) controller unit with display, suitable for Hot Water Generator of capacity not less than 25 kW, used for humidity control in existing AHU system, including supply, fixing, wiring, configuration/ programming, testing and commissioning complete with the following minimum features or any other controls required to make the system fully functional and safe with following mandatory features:-(i) Run time equalization (where multiple heaters/ components are involved)(ii) Auto start facility(iii) Non-volatile memory back-up for data and settings(iv) Built-in time delay for safe operation and protection |
| 142 | Taking out the old unserviceable contactor and S&F new power contactor 3TF49 (Make: Siemens), provided with 1 NO & 1 NC auxiliary contacts, coil voltage 220 V AC, including fixing in position, proper termination of power and control wiring, testing and commissioning, complete. |
| 143 | Taking out the old unserviceable contactor 3 TF 30 (Make: Siemens) from existing LT panel including fixing new contactor in position, proper termination of power and control wiring, testing and commissioning complete. |
| 144 | Taking out the old unserviceable contactor 3 TF 31 (Make: Siemens) from existing LT panel including fixing new contactor in position, proper termination of power and control wiring, testing and commissioning complete. |
| 145 | Taking out the old unserviceable contactor MNX 18, 3-phase, in existing LT panel and supply and fixing of new power contactor of approved make and rating, proper termination of power and control wiring, testing and commissioning complete. |
| 146 | Taking out defective/burnt power contactor from existing electrical panel board and S&F in replacement new power contactor 3TS47 (Make: Siemens or approved equivalent), of suitable current rating and coil voltage matching existing system, including fixing in position, proper termination of power and control wiring, testing and commissioning complete. |
| 147 | S&F in repairs of Hot Water Generator of capacity 25 kW, suitable for humidity control in existing AHU system, complete, including supply and fixing of suitable capacity control panel board, cabling and electrical connections, and connection of hot water piping to existing AHU complete. |
| 148 | S&F in renewal of auxiliary contactor MNX A1, 3-phase, in existing LT panel, including taking out the oldunserviceable auxiliary contactor, supply and fixing of new auxiliary contactor of approved make and rating, proper termination of control wiring, testing and commissioning complete. |
| 149 | S&F auxiliary contactor MNX A2, 3-phase, in existing LT panel, including taking out the old unserviceable auxiliary contactor, supply and fixing of new auxiliary contactor of approved make and rating, proper termination of control wiring, testing and commissioning complete. |
| 150 | S&F power contactor ML-1.5 of approved make and rating, including taking down the old unserviceable contactor, fixing the new contactor in position, proper termination of power and control wiring, testing and commissioning complete. |
| 151 | S&F contactor MNX 12, of approved make and rating, in existing electrical/LT panel, including taking down the old unserviceable (UNSV) contactor, fixing the new contactor in position, proper termination of power and control wiring, testing and commissioning complete. |
| 152 | S&F of three-way mixing valve switch of existing model, suitable for the installed system, in existing LT/control panel, including taking down the old unserviceable switch, fixing the new switch in position, proper termination of control wiring, testing and commissioning, complete. |
| 153 | S&F electronic timer Cat. No. 800-S/7PU, having time range 30–0 / 60–20 (as applicable), in existing electrical/LT panel, including taking down the old unserviceable (UNSV) timer, fixing the new timer in position, proper termination of control wiring, setting/ adjustment, testing and commissioning complete. |
| 154 | S&F single phasing preventer, of approved make and rating complete with necessary wiring, in existing electrical/LT panel, including taking down the old unserviceable unit, fixing the new preventer in position, proper termination, setting and testing complete. |
| 155 | S&F motor terminal plate, complete with nuts, bolts, washers and all necessary fixing accessories, suitable for electric motors of capacity 7.5 / 10 / 15 / 20 HP, including taking down the old unserviceable terminal plate, fixing the new terminal plate in position, proper alignment and tightening complete. |
| 156 | S&F in repairs of door for cold storage plant of size 1200 mm × 2100 mm comprising leaf panels injected with high-pressure polyurethane foam (PUF) having smooth metal surface suitable for easy and hygienic cleaning, complete, including supply and fixing of hinges, handles, screws, fasteners and necessary fixing accessories, alignment, testing for proper closing and sealing all as specified. |
| 157 | S&F in repairs of capacitor suitable for Package Type Air Conditioner of capacity 5.5 TR to 17.5 TR, compatible with the existing plant, including taking out the defective/ unserviceable capacitor, supply and fixing of new capacitor of approved make, rating (µF) and voltage, proper mounting, electrical connections, testing and commissioning complete. |
| 158 | S&F in repairs of digital microprocessor control panel for Package Type Air Conditioner, suitable and compatible for existing model and make, including removal of defective control panel/components, supply/repair and fixing of control panel with display, wiring, programming/ configuration, testing and commissioning complete. |
| 159 | M&L for bi-monthly servicing of ODU and IDU of Package Type / Ductable Air Conditioner of capacity up to 5.5 TR, including AC condenser servicing complete. Scope of work includes:- (a) Switching off and making AC unit safe before servicing.(b) Cleaning of air filters by washing and drying before refixing.(c) Cleaning of air blower and internal accessible surfaces.(d) Cleaning of condenser coil and fins using approved solvent/chemical and pressurised water pump, without damaging fins.(e) Greasing/lubrication of blowers and moving parts with approved grease.(f) Servicing of fan motors, including checking bearings, noise and vibration.(g) Checking of refrigerant gas pressure and reporting abnormality (top-up/replacement measured separately).(h) Dismantling, cleaning and refixing of air diffusers/grills, complete.(i) Checking electrical connections, tightening terminals and general operational checks.(j) Cleaning of work area after completion |
| 160 | S&F in repairs of drier filter, suitable for Package Type / Ductable Air Conditioner of capacity 5.5 TR to 17.5 TR, compatible with the existing refrigerant and system, including taking out the defective/unserviceable drier filter, supply and fixing of new drier filter of approved make and capacity, brazing/connection as required, leak testing, evacuation (if disturbed) and commissioning complete. |
| 161 | S&F in repairs of motor bearing and pillow block bearing, including re-metaling of blower shaft, machining/ polishing to required size and tolerance and reassembling the blower assembly, suitable for air blower capacity up to 6600 CFM complete. |
| 162 | S&F in repairs complete blower unit assembly (excluding fan motor), suitable for Package Type / Ductable Air Conditioner of capacity up to 16.5 TR, comprising blower casing, impeller, shaft, bearings, base frame, pulleys and belts including fixing in position, alignment with existing motor, belt tensioning, testing and commissioning complete. |
| 163 | S&F of expansion valve of approved make and capacity in indoor units of capacity not less than 7.5 TR suitable for existing AC system and refrigerant including taking out the defective/ unserviceable expansion valve, connection by brazing/ flare as applicable, leak testing, evacuation (if disturbed) and commissioning complete. |
| 164 | S&F of pre-filter of approved quality and efficiency, suitable for Package Type Air Conditioner of capacity up to 16.5 TR, compatible with existing unit and filter frame, including removal of defective/unserviceable pre-filter, proper sealing to prevent air bypass, testing and commissioning complete. |
| 165 | S&F of fan blade of matching size, pitch and material for condenser motor, suitable for Package Type / Ductable Air Conditioner of capacity up to 16.5 TR, as per existing at site including removal of damaged/ unserviceable fan blade, proper alignment, balancing, testing and commissioning, complete. |
| 166 | Dismantling of condenser fan motor of Package Type Air Conditioner of capacity up to 16.5 TR, single phase, 240 Volts, motor capacity up to 1 HP, including isolation and disconnection of electrical supply, dismantling and removal of motor, taking out worn/damaged bearings, re-metaling of bearing housing, grinding and turning/ machining to required size and tolerance, thorough cleaning of stator, rewinding with same gauge copper insulated wire, insulating, varnishing and drying, re-assembling the motor to restore original condition, refixing on foundation, reconnection of electrical connections, testing and commissioning complete. |
| 167 | Dismantling of condenser fan motor of Package Type Air Conditioner of capacity up to 16.5 TR, three phase, 415 Volts, motor capacity up to 1 HP, including isolation and disconnection of electrical supply, dismantling and removal of motor, taking out worn/damaged bearings, re-metaling of bearing housing, grinding and turning/ machining to required size and tolerance, thorough cleaning of stator, rewinding with same gauge copper insulated wire, insulating, varnishing and drying, re-assembling the motor to restore original condition, refixing on foundation, reconnection of electrical connections, testing and commissioning complete. |
| 168 | Dismantling of blower motor of Package Type Air Conditioner of capacity up to 16.5 TR, three phase, 415 Volts, motor capacity up to 3 HP, including isolation and disconnection of electrical supply, dismantling and removal of motor, taking out worn/damaged bearings, re-metaling of bearing housing, grinding and turning/machining to required size and tolerance, thorough cleaning of stator, rewinding with same gauge copper insulated wire, insulating, varnishing and drying, re-assembling the motor to restore original condition, refixing on foundation, reconnection of electrical connections, testing and commissioning complete. |
| 169 | S&F in repairs of air-cooled, floor-mounted outdoor unit (condenser unit) for Package Type Air Conditioner of capacity up to 8.5 TR or nearest higher available capacity, compatible with existing system including provision of required foundation/base, installation as per OEM recommendations and making good existing walls/floors disturbed during works with finishes matching existing all as specified. |
| 170 | Taking out defective/unserviceable controller and supplying & fixing new Sub-Zero controller with display (where applicable), suitable for operating Package Type Air Conditioner of capacity up to 8.5 TR, compatible with the existing make/model and control logic, including wiring, setting, testing and commissioning complete. |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail