Sales : +91-777 804 8217
| Sl. No. | Item Description |
| 1 | NOTES :The bidders/contractorsare advised to read tender document & all corrigendum/ amendments and General conditions of contracts before entry/quoting the rates. |
| 2 | M & L for isolating the HT/LT supply and earthing system complete, opening and taking down top cover of the transformer of any capacity installed on 2 pole / 4 pole structure or indoor / outdoor sub stn. Drain out the transformer oil up to the required level and keeping in safe custody (for reuse), for repair/replacement of part, checking the lead connection from winding to bus rods including necessary soldering / jointing etc Refilling transformer oil, refixing the top cover, taping and commissioning of the transformer after the repair complete all as specified and directed.Note : (a)Container for keeping the transformer oil safe for reuse will be arranged by contractor. (b)HT/LT bushing lead & copper terminal rod shall be measured and paid for separately as supply only under respective item of sch ‘A’. |
| 3 | Supply only, HV bushing (11000 voltage graded) with copper terminal stud, both end threaded complete with double nuts & washers including distance piece both sides and heat resistance gasket suitable for outdoor / indoor type transformer of capacity upto 200 KVA. |
| 4 | All as per item no. 3 but capacity of transformer 250 KVA to 400 KVA |
| 5 | All as per item no. 3 but capacity of transformer 500 KVA to 630 KVA |
| 6 | Supply only, LV bushing (415 voltage graded) with copper terminal stud, both end threaded complete with double nuts & washers including distance piece both sides and heat resistance gasket suitable for outdoor / indoor type transformer of capacity upto 200 KVA. |
| 7 | All as per item no. 6 but capacity of transformer 250 KVA to 400 KVA |
| 8 | All as per item no. 6 but capacity of transformer 500 KVA to 630 KVA |
| 9 | Disconnecting, taking down distribution transformer indoor/outdoor type 6/11 KV /415 volts having capacity upto and including 300 kVA, transportation to the workshop for repairs including opening of transformers cover, draining of oil, de-tanking of core and coil assembly, cleaning, washing of dust and dirt from all parts including core, tank and cooling tubes radiators etc., joint inspection for estimate, replacement of defective parts, assembly, stage inspection, re-tanking, oil filtration/ dehydration, fill dehydrated oil and fresh oil and testing the repaired transformers for all the routine tests complete all as specified and as directed. Note: - (a) Transformer oil shall be drained out by the contractor in suitable capacity mild steel drums to be arranged by the contractor. The said drained out transformer oil shall be refilled in the transformer duly dehydrated after repair and the cost thereof shall be included in unit rate quoted against the respective item of this schedule. (b) Rewinding of both HT & LT coil shall be measured and paid for separately under respective item of this schedule. (c) Transportation charges for transportation of transformer from site to workshop and after repair, workshop to site shall be borne by the contractor and cost thereof shall be deemed to be included in the unit rate quoted for this item. (d) The spare parts excluding nuts, bolts, washer, gasket, etc, shall be measured and paid for separately. (e) The said transformer shall be repaired in reputed workshop as decided by the GE. (f) Testing of transformer after repair shall be carried out as per IS and the cost of testing shall be deemed to be included in unit rate quoted against this item. (g) The IR value of the dried winding before inserting the core in the shell shall be measured and recorded. |
| 10 | All as per item no. 9 but capacity of transformer 315 KVA to 650 KVA |
| 11 | Supply only (HV side) copper winded coil of existing type size and gauge 11000/6000 voltage complete with insulating material for transformers complete all as specified and directed. |
| 12 | Supply only (LV side 415 Voltage grade) copper winded coil of existing type size and gauge 1100 voltage complete with insulating material for transformers complete all as specified and directed. |
| 13 | Supply only new off load tap changer assembly complete including making connection and testing complete of the transformer capacity upto 315 KVA. |
| 14 | All as per item No 13 but capacity of transformer 400 KVA to 630 KVA. |
| 15 | Supply only for replacement of cork sheet gasket of 06 mm thick for transformer of capacity upto 650 KVA complete all as specified and directed. |
| 16 | M&L for cold rolled grain oriented core (CRGO) for transformer upto 630 KVA capacity complete all as specified and directed. |
| 17 | M/L for replacement of silica gel breather filled with silica gel containing 250 gms silica gel complete all as specified and directed. |
| 18 | M/L for replacement of silica gel breather filled with silica gel containing 500 gms silica gel complete all as specified and directed. |
| 19 | Supply & pouring of fresh transformer oil in transformers for topping up the level or replacement complete all as directed (Transformer oil shall confirm to relevant IS -335 and dielectric strength of 45 KV) and getting it tested before and after filling complete all as specified and directed |
| 20 | Material & labour for dehydration and filtration of transformer oil of existing transformer of capacity upto 650 KVA, 11/0.433 KV to obtain dielectric strength more than 40 KV at 2.5 mm gap including, testing complete all as specified and directed. |
| 21 | Supply and fixing of oil temp gauge 0-120 degree Celsius with inbuilt sensor to be fitted on transformer and dismantling of existing unserviceable gauge of any capacity. |
| 22 | Material and labour in replacement Explosion vent diaphragm suitable for upto 200 KVA transformer complete all as specified and directed. |
| 23 | Material and labourin replacement Explosion vent diaphragm suitable for 250 KVA to 630 KVA transformer complete all as specified and directed. |
| 24 | Material & labour for topping up silica gel Crystals in the breather for transformer complete all as specified and directed. |
| 25 | Material & labour for replacement of oil level indicator as per existing complete all as specified and directed. |
| 26 | M & L for spray painting of distribution transformers any type of capacity upto and including 200 kVA indoor / outdoor type, in workshop or installed at different sites in scattered area under the GE complete all as specified and as directed.Including the following: - (a) Removal of grease, oil and other contaminants using de-greasing solvent. (b) De-rusting of surface and cleaning manually by scrubbing and wire brushing. (c) Washing thoroughly and dry properly. (d) Applying two coats of zinc phosphate primer by spray machine (e) Final painting of two coats with synthetic enamel paint by spray machine over priming coat. (f) the colours of painting shall be (i) grey for transformer body, (ii) red, yellow & blue for HT bushing, (iii) red, yellow, blue & black for LT bushing,(iv) red for drain plug, (v) white for writing SM/ MES No., location, area feeding (in short) over the body of transformer. |
| 27 | All as per item No 26 but capacity of transformer 250 KVA to 400 KVA |
| 28 | All as per item No 26 but capacity of transformer 500 KVA to 650 KVA |
| 29 | Disconnection carefully of electric supply and M & L for Providingconnection of LT cable upto 70 sqmm 3.5 core size with aluminium thimbles & heat shrinkable sleeves for LT side of transformer / LT panel complete all as specifeid and directed. |
| 30 | All as per item No 29 but of thimble of size 95 Sqmm. |
| 31 | All as per item No 29 but of thimble of size 120-150 Sqmm. |
| 32 | All as per item No 29 but of thimble of size 185-240 Sqmm. |
| 33 | M & L for taking out LT underground cable of length not more than 10 m and of size 35 sqmm to 400 sqmm 3.5 core including excavation, taking out bricks andrelaying the old cable in loop for making newthimbles in Transformer/ LT Panelincluding refillingofsand, relaying old bricksand returning, filling in soil complete. (Note :- The rate of new thimbles, cable gland etc required for the item shall be deemed to be included in quoted rate.) |
| 34 | Material & labour replacement of Cross Arms bracings supports, clamps, eye hook and back plates fabricated from structural steel sections including pole clamps stay clamps, D clamps nuts, bolts , washers welding bending cold or hot drilling holes for bolts, in any shape or size as indicated or directed and inclusive of one primer coat, one under coat and one finishing coat ofaluminiumpaint complete all as specified and directed. |
| 35 | Material and labour in replacement of cable box of Transformer on LT/HT side made up of MS sheet, thickness not less than 3.15 mm and fixingwith Transformer of cap 63 to 630 KVAwith cable gland as reqd after painted one coat of primer and two coats of synthetic enamelgray paint oras required at site complete all as specified and directed. |
| 36 | Dismantling of air break gang operated switches / DO assembly vertical / horizontal mounted including insulators and operating mechanism and removing the same from site complete all as specified and directed. |
| 37 | Supplyinstallation, connecting and testing gang operated air break switch, mounted on insulators HT 6/11KV 200 Amps rating, triple pole, nine insulator suitable for horizontal / vertical mounting fixed and spring loaded revolving tinned brass / copper contacts, galvanized steel base frame, 32 mm boremedium grade pipe Galvanizedoperating rod (Medium Grade), operating handle, locking arrangement MS clamps, bolts, nuts & washers fitted on Four pole/ Two pole structure etc including two coats of aluminium paint over a coat of red oxide primer complete all as specified and directed.NOTE :- Rates quoted deemed to be inclusive of all equipment such as crane & transported vehicle |
| 38 | M&L in replacement for lightening arrestors expulsion type complete with all fittings, transmission class discharge capacity 65 Kilo Amps 6600 volts complete all as specified and directed.including old taken down. |
| 39 | M&L in replacement for lightening arrestors expulsion type complete with all fittings, transmission class discharge capacity 65 Kilo Amps 11000 volts complete all as specified and directed.including old taken down. |
| 40 | Supply and installation in replacement of drop out fuse assembley with insulator single pole 11KV, 25 Amps rating complete expulsion fuse element mounted on four / two pole structures complete all as specified and directed.including old taken down.Note :- The cost of necessary Nut, bolt and washers shall be deemed to be included in above quoted rate. |
| 41 | Taking out and repairing/overhauling, Re-Adjustment ofair break gang operated switch triple pole, with Drop out fuse unit mechanically operated mounted on insulators and steel frame installed vertically / horizontally , including replacement of broken/worn-out components like male,female etc., oiling and greasing of mechanical moving parts, smoothing and polishing ofelectric contacts with providingconductingjelly on contactsrefixed the same after repair complete all as directedrate of jumper from AB Switch to Overhead and cable included in unit rate of item. |
| 42 | Supplying and fixing in replacementmale contact/moving contact for gang operated air break device upto 11 KV complete all as directed at site by Engr-in-charge. |
| 43 | Supplying and fixing in replacement female contact /fix contact jawfor gang operated air break device upto 11 KVcomplete all as directed at site by Engr-in-charge. |
| 44 | Supplying and fixing in replacement porcelain post insulator for gang operated air break device upto 11 KVcomplete all as directed at site by Engr-in-charge. |
| 45 | Supplying only Fuse wire Copper tined of capacity 5 Amps to 40 Amps upto |
| 46 | Supplying and fixing in replacement MS jumper carrierfor gang operated air break device upto 11 KVcomplete all as directed at site by Engr-in-charge. |
| 47 | Supplying and fixing in replacement back connector plate for gang operated air break device upto 11 KV complete all as directed at site by Engr-in-charge. |
| 48 | S&F insulators pin/disc type HT porcelain, vitreous white or brown or green of size 150mm height, 150mm dia ISI marked suitable for 11 KV grade including one galvanized mild steel spindle, two GI washers and one nut complete all as specified and directed.including old taken down. |
| 49 | S&F Disc type insulator \"single disc\" assembly ISI marked for tension with tension clamps for conductors, porcelain, vitreous 145mm high and 255mm dia ball and socket type, white, brown or green with tension clamps for conductors (ACSR), working pressure 11KV complete all as specified and as directed. |
| 50 | M&L for Repair/replacement GI Stay assembly set comprising of 14mm dia 400mm iron stay bow, 2150mm long stay rod 20mm dia, stay plate 300 x 300 x 6mm thick complete with all aceessories as shown in electric plate no 1 of MES schedule Part I complete all as specified and directed. Note :- Earth work, PCC, loop type insulator, galvanized stay stranded wirewill be measured and paid separately. |
| 51 | M&Lpainting of steel tubular HT pole includingcross arms, clamps, back plates etc in situ with one under coat and one finishing coat with aluminum paint after cleaning / preparation of surfaces including making white and black strips 30 cm wide 5 Nos with two coats of synthetic enamel paint including red and yelow reflected tap and marking of pole No , Feeder No also complete all as specified and directed. |
| 52 | All as per item 51 but on 2 pole steel structures including painting of bracings. |
| 53 | All as per item 51 butbut on 4 pole steel structures including painting of bracings. |
| 54 | M&L in replacement for earthing complete with using galvanized iron strip 32 x 6 mm as earthing lead with galvanized steel earth plate electrodesize 600 mm x 600 mm x 6 mm thick buried directly in groundvertically in a pit of depth not less than 2.25 mtr below ground levels with top edge of the earth plate not less than 1.5 mtr below normal ground level surrounded from all sides by mixture of charcoal and common salt and electrode connected to and including galvanized earth lead 32 x 6 mm by means of bolts, nuts, check nuts and washers of galvanized including GI protection pipe light grade 40 mm dia connected to main earth on pole or control board and GI pipe light grade 20mm bore for watering funnel with wire mesh. RCC cover with frame, PCC chamber pit with PCC 1:3:6 type C-1, excavation and earth work all as shown in electrical plate No 3 of SSR Part-I, connected to earthing test point all as specified or indicated including testing on completion including taking down existing u/s earthing Note :-galvanized strip of extra length of main earthing lead beyond 7.5 mtr will be measured and paid separately). |
| 55 | M&L for replacement of earthing continuity conductor or main earthing lead fixed to wall or batten or recess or buried in ground or drawn in conduit /pipe or fixed to poles or any other indicated situation for loop earthing etc. as required 32 x 6 mm galvanized iron strip complete all as specified and directed. |
| 56 | Disconnecting and taking down HT UG cable from HT pole/ Transformer and cutting faulty end portion of the cable, dressing properly and making good end termination indoor/outdoor joint fixed with and including suitable size of Heat shrinkable new jointing kit 11000 voltage grade and aluminium lugs duly crimped with crimping tool for 95 Sqmm 3 core HT XLPE cable complete all as specified and directed. |
| 57 | Disconnecting and taking down HT UG cable from HT pole/ Transformer and cutting faulty end portion of the cable, dressing properly and making good end termination outdoor type joint fixed with and including suitable size of heat shrinkable new jointing kit 11000 voltage grade and aluminium lugs duly crimped with crimping tool for 120 to 185 sqmm Sqmm 3 core HT XLPE cable complete all as specified and directed. |
| 58 | Disconnecting the existing connection for both ends of the faulty cable, testing the faulty HT/LT underground cable with the help of cable fault locating machine at site, finding out the location of fault in HT underground cable of any size any type complete all as specified and as directed including removal of moisture content from cable complete all as specified and directed.Note :- (i) The cable fault locator machine, necessary T&P, main power for locating of fault shall be arranged by the contractor and quoted rate deemed to be included.(ii) The contractor shall rectify the defects within 12 hours from the time of information. If the defects are not rectified within 12 hours, the contractor shall be liable to pay compensation at the rate of ₹4000 per hours beyond 12 hours.(iii) Necessary excavation, earthwork joint etc measured and paid separately under respective item of Sch \"A\" / BOQ. |
| 59 | Supply and fix cable jointing kit for 11 KV grade cable for in straighttermination,Heat shrink type, joint complete with jointing material and accessories suitable for 3 core XLPE, armoured, Al conductor cable of size 50 Sqmm to 95 sqmm |
| 60 | All as per item No 59 but joint of cable size 120 Sqmm to 185 Sqmm |
| 61 | Supplying, installation and errecting of steel tubuler swaged welded pole complete with MS base plate of 6 mm thick of size 300 mm x 300mm, finial taper plug, pole cap bolts, nuts and washers and screwed, pole made out of ERW MS Tubing confirming to IS-2713 (Part-II) 1980 type 410 SP-55 (11 meters long) HT polesISI Mark including drilling of holes of required size and for fixing of cross arms, painting with one coat of red oxide primer and two coats of aluminium paint on exposed surfaces and two coats of black bituminous paint for portion embeded in concrete, painting including dismantling and taking out old poles complete all as specified and directed.Note :- Excavation, earth work & concrete shall be measured and paid separately. |
| 62 | M/L for Demolition of path /concrete in ground floors and pavings (below or above ground level) .complete all as specified and as directed.Note : The rate inclusive of taking down and refixing of any type of cheqered tiles, interlocking tiles complete as per existing for good make. |
| 63 | M&L for PCC (1:4:8) type D-2 using 40 mm graded stone aggregate in mass concrete and filling complete for foundation complete all as specified and directed. |
| 64 | M&L for PCC (1:3:6) type C-1 using 20 mm graded stone aggregate in mass concrete and filling including necessary form work complete all as specified and directed. |
| 65 | M&L for PCC (1:2:4) type B-1 using 20 mm graded stone aggregate as in coping and the like including weathering slightly rounded or chamfered angles including necessary form work complete all as specified and directed. |
| 66 | Material, labour, Repair and Servicing of 11 / 6.6 KV VCBs of Receiving/Distribution System with dusting/cleaning by smooth brushing or dry cotton and lubricating of movable mechanism suitably with oil/grease and replacement of unserviceable/burnt out/worn out spare parts with new one as per existing make, duly commissioned in the VCBs at 11 / 6.6 KV Bulk Receiving Centre including necessary inspection, reassembling ,testing, re-commissioning, etc complete for smooth functioning of the equipments to ensure desired result including taking down/dismantling of existing unserviceable spares parts of VCB all as directed by Engineer-in-charge. Note:-(i) All cost of labour for the replacement of unserviceable parts shall be deemed to be included in the unit rate quoted against this item.(ii) Major parts shall be measured and paid separately under appropriate item of this BOQ as \"Supply only\"(iii) T&P and minor parts will be arranged by the contractor and the cost thereof shall be deemed to be included in the unit rate quoted against this item.(iv) Repair, overhauling & testing of VCB shall be carried out by authorized competent persons of OEMs or their accredited / authorised agancies and contractor shallsubmit supporting document of authorized representative of existing VCB to GE, the service charge of OEM shall be deemed to be included in unit quoted rate. |
| 67 | Supply onlyMotor for Spring charging with gear complete all as specified and as directed.Make :As per existing OEM as approved by GE |
| 68 | supply onlyin replacement of tripping coilassembly 24 volts DC suitable for 400 to 800 amps, HT VCB complete all as specified and directed |
| 69 | Supply only in replacement of closing coilassembly 24 volts DC suitable for 400 to 800 amps,HT VCB complete all as specified and directed |
| 70 | Supply only ofHolding Base from Mould (Epoxy Mould) complete all as specified and as directed..Make :As per existing OEM as approved by GE. |
| 71 | Supply only of isolating Contacts / fixed with brass ring complete all as specified and as directed..Make :As per existing OEM as approved by GE |
| 72 | Supply only of Spout Bushing complete all as specified and as directed.Make :As per existing OEM as approved by GE |
| 73 | Supply only vacuum interrupter suitable for400 to 800 amps, HT VCB |
| 74 | Supply only ofAuxiulary Switch 12 Way (6No/6NC) complete all as specified and as directed.Make :As per existing OEM as approved by GE |
| 75 | Supply only support insulators complete all as specified and as directed.Make :As per existing OEM as approved by GE |
| 76 | Supply only Indicator lamp, LED type of colour (red, blue, yellow, orange, green etc) |
| 77 | Supply only T&C Switch for Breaker ON/OFF/service in HT VCB panel including associated wiring complete all as directed. |
| 78 | Supply only contact spring, gear as per existing suitable for HT VCB. |
| 79 | Supply only Gear Assembly as per existing suitable for HT VCB complete |
| 80 | Supply only ofPower Pack 110 VAC/ 110 VDC complete all as specified and as directed.Make :As per existing OEM as approved by GE |
| 81 | Supply only Anti-condensation space-heater withThermostatic control and cable suitable for circuit breaker compartments |
| 82 | Supply only Reel insulator suitable for HT VCB. |
| 83 | Supply onlyin replacement breaker operating mechanism of VCB |
| 84 | Supply only ofdigital ammeter with built in selector switch 0-400 Amps of dial size 96x96mm with accuracy class 1.0, three phase complete all as directed. |
| 85 | Supply only Digital Voltmeter 0-500 volts with built in selector switch of dial size 96 x 96mm with accuracy class 1.0 complete all as specified and directed. |
| 86 | Supply only of Trivector Meter, 3PH, 3W TVM 110V (L-L) 5A CL0.5S BM RS 485 complete all as specified and directed. |
| 87 | S&F in replacement of Copper Bus Bar including insulation tape as per existing rating for HT VCB panelcomplete |
| 88 | M & L Calibration of relays, for HT 11 KV VCB of any description through primary and secodary injection method and testing complete re-setting where required and ensuring proper functioning of earth fault and over current relays complete all as specified and directed. |
| 89 | Supply & install PT unit three phase as per existing, resin cast dry type, single ratio having primary voltage 11 KV & secondary voltage 110 volts, 50 VA class-1 including necessary connections & wiring for metering complete all as specified and directed . |
| 90 | Supplying, installation, commissioning and testing in replacement of 11 KV Current Transformer (CT`s), indoor type, resin cast epoxy type,of 13.1 KA/Sec having ratio 400/200/5-5 Amps having Core1: Class 5P10, 10VA for protection , Core2: Class 0.5, 10VAfor metering including fuses, associated wiring complete suitable for any make of VCB as per existing all as specified and directed . |
| 91 | S&F in replacement over current and earth fault Numerical relay suitable for existing VCB panelincluding taking down old unserviceable one complete all as specified and directed. |
| 92 | S&F in replacement of HRC fuse of capacity 20 Amps for VCB complete all as specified and directed. |
| 93 | S&F in replacement of bakellite HRC fuse holder as per existingsuitablefor VCB complete all as specified and directed. |
| 94 | M& L for preparation of old painted surfaces by removing dust, rust oil and scraping etc for painting the VCBs panel inside and out side with the help of jet spray paints in different location with two coats of synthetic enamel paint for matching of existing colour over the existing painted surfaces after apply putty and a coat of red oxide primer and writing SM/MES No, Feeder details in black letter complete all as specified & as directed |
| 95 | S & F in repair of MS chequered plate thickness not less than 7 mm FE -410-WE-250 gde of quality\"A\" gradefor covering on the cable duct. The plate shall be painted with two coats ofblack enamel paint over a coat of red oxide primer all as specified and directed. |
| 96 | Supply& laying in replacement high dielectric strengthSMC trench cover of size 1 mtr length x 0.75 mtr width x 12mm thickness suitable for 11 / 6.6 KVcomplete all as specified and directed. |
| 97 | Supply and fixing in replacement 100mm boresteel tube of light grade galvanised with all fittings fixed to walls / floors / poles or under road etc of following sizes complete all as specified and directed.Note : (i)The GI pipe should be fixed with pole by MS clamps.(ii)The MS work should be measured and paid separately. |
| 98 | Supply and fixing in replacement 150mm boresteel tube of light grade galvanised with all fittings fixed to walls / floors / poles or under road etc of following sizes complete all as specified and directed.Note : (i)The GI pipe should be fixed with pole by MS clamps.(ii)The MS work should be measured and paid separately. |
| 99 | Excavation in trenches in soft/loose soil not exceeding 1.5 m wide and not exceeding 1.5 m in depth for laying of cable etc. and for foundation of poles, stays etc. n exc 10 sqm on plan and n exc 1.5 in depth and getting out complete all as specified and directed. |
| 100 | Excavation in trenches not exc 1.5m wide and exc 1.5m and not exc 3.0m in depth for laying of cable etc. and for foundation of poles, stays etc, not exc 10sqm on plan and getting out in soft / loose soil complete all as specified and directed. |
| 101 | Returning filling in including spreading, leveling, watering and well ramming in layers n.exc 25cm in any type soil complete all as specified and directed. |
| 102 | Removing surplus soil to a distance not exceeding 50m & depositing at a level not exceeding 1.5m above the starting point complete all as specified and directed. |
| 103 | Material & labour for filling dry river sand, spread & compacting for sand cushioning of under ground cable all as specified and directed by the Engr-in-Charge |
| 104 | Taking out existing serviceable / unserviceable bricks / PCC cover over UG cables from trenches and stacking at site for re-use complete all as specified & directed. |
| 105 | Laying only old serviceable PCC cover retreived from Srl item No 106 above complete all as specified and directed. |
| 106 | Supplying and laying un-reinfoced precast concrete cable cover of class HV type 1 with flat size 300 x 180 x 40mm compete all as specified and directed. |
| 107 | Taking down damaged HT cables, cutting / dressing end portion and making good end termination with and includingsuitable size of aluminium lugs duly crimped with crimping tool and refixing its own position including Jumpers, Insulation tape, nut, bolts etc as reqd for the cable of size 70 Sqmm to 185 Sqmm 3 Core complete all as specified and directed |
| 108 | Taking out the old unserviceable HT Underground XLPE insulated, screened PVC bedded galvanized steel strip armoured electric power cable (heavy duty) with aluminium conductor 11 KV grade (Earthed) of any Size from trenches/wall/floor/road/ culverts or pole etc complete all as specified and directed . Note : Excavation and earth work, duct work, GI pipe for laying of cable and sand cushing/cable protection covers etc are beyond the scope of this item and shall be measured & paid for separately |
| 109 | Laying only old serviceable HT Underground XLPE insulated, screened PVC bedded galvanized steel strip armoured electric power cable (heavy duty) with aluminium conductor 11 KV grade (Earthed)in trenches /fixed on wall /floor /road /culverts /pole or encased in GI pipe all as directedretrieved from item srl No.107 .00 (here-in-before). |
| 110 | Supply and laying in replacement, testing and commissioning of HT Underground XLPE insulated, screened PVC bedded galvanized steel strip armoured electric power cable (heavy duty) with aluminium conductor 11 KV grade (Earthed) of sizes3 Core 70 Sqmm cable comfirming to IS-7098 Pt-II cable laid in trenches / walls / ducts / poles including taking out the old one complete all as specified and directed. |
| 111 | All as per Item No 110 but size of cable 3 Core 95 Sqmm. |
| 112 | All as per Item No 110 but size of cable 3 Core 120 Sqmm. |
| 113 | All as per Item No 110 but size of cable 3 Core 185 Sqmm. |
| 114 | Supply only LT adhesive tape of color R, Y, B & Back (of size 20 MM width X 50 Mtrs lenght). |
| 115 | Supply only HT adhesive tape of color R, Y, B & Back (of size 25 MM width X 20 Mtrs lenght). |
| 116 | Materials and labour for BORING roads / hard standing to a depth not less than 45 cm and not less than 40 cm wide for laying of GI pipe to draw the UG cable and making good the disturbed surfaces by filling of PCC (1:3:6) type C-2 using 40 mm graded stone aggregate and finished the surface even and smooth with out using extra cement and disposed off the surplus debris and soil to a distance not exc50 mcomplete all as specified and as directed by the Engr-in-Charge |
| 117 | Material and labour for construction of transformer platform including excavation, leveling, of size 2500X2500X1500 mm (500 mm below GL & 1000 mm above GL) for installation of transformer with, PCC 1:4:8 type D2 as in foundation, fly ash brick wall of 230 mm incl plastering with cement Mortar 1:4 incl filling under floor,s watering and well ramming with soil and 100 mm PCC 1:2:4 type C1 on the top of platform and two coats of Cement based paint over a coat of Primer incl preparation of newly plastered surfaces. including 1.5 Mtr wide steps on one side of platform to Path complete all as specified and directed |
| 118 | M&L for Replacement of old jumper ACSR with PVC sleeves (conductor size not less than weasel) upto length 3.5mtr for HT with Aluminium thimble (If necessary) complete all as specified and directed. |
| 119 | Taking down cement or cement lime plaster, any description on brick or stone walls, etc including racking out joints, hacking for key, scrubbing down with water etc, complete all as specified and directed. |
| 120 | M&L for 10mm thick rendering in cement mortar (1:4) on fair face of brick walls / concrete surfaces finished even and smooth without using extra cement complete all as specified and directed. |
| 121 | Disconnecting, taking down distribution transformer indoor/outdoor type 6.6/11 KV /415 volts having anycapacity, shifting to the another place as per site requirement and refixing again at new location, testing complete all as specified and as directed. Note: - (a) Transportation charges for transporting the transformer from site and shifting shall be borne by the contractor and nothing will be paid on this account |
| 122 | Supplying and laying synthetic Rubber insulated mats 2.5 mm thick for voltage upto 11kv for electrical purpose as per IS 15652-2006, (superseding IS 5424) suitable for electrical shock of safety size 2m x 1m.complete all as specified and directed |
| 123 | M&L loose filling with stone aggregates of 40mm size in substations,around 4 pole/6 pole structures all as specified and directed. (The contractor has to stack the gravel/stones near the substation as per directed for necessary measurement and instructions ). |
| 124 | M&L for Repair and Servicing of Compact sub-station comprises of HT Pannel, (VCB, LBS)6KV/11 KV Grade, 630 Amps, Dry/Oil type transformer 250 KVA to 400 KVA , APFC Paneland LT compartment etc. by Auth representative including the following:-(a) Switiching off Ht panneland conforming that supply to incomming end is other/properly disconnected.(b) Opening covers of the HT Pannel and visual checking of epoxy housing and all parts for rust and wear & tear.(c) Cleaning all parts of CSS with appropriate chemical to remove dust and dirt and wipping of the envelop of the vacuum interrupeter and insulating material with a clean and dry cloths.(d) Lubricating & greasing of rotary sections and moving parts, sliding surfaces, pins, coupling section etc by applying a small amount of grease/ petrolium jelly/ machine oil as applicable.(e)Checking of PTs, CTs control circuits, closing and tripping coil and all other parts.(f) Replacement of parts defective or less reliable.(g)Cheaking auxilliary supply and control voltage, control circuits and tightening of all conections.(h) Checking of thransformer connection, insulation for any wear & tear. (i) Cleaning the bus bar compartment along with replacing coloured insulation of busbar for any damage. (j) checking the APFC pannel & LT panel & replacing minor parts if required.Note:-(i) All cost of labour for the replacement of unserviceable parts shall be deemed to be included in the unit rate quoted against this item. Contd/...... |
| 125 | Contd/......(ii) Major parts shall be measured and paid separately under appropriate item of this BOQ as \"Supply only\"(iii) T&P and minor parts will be arranged by the contractor and the cost thereof shall be deemed to be included in the unit rate quoted against this item.(iv) Repair, overhauling & testing of CSS shall be carried out by authorized competent persons of OEMs or their accredited / authorised agancies and contractor shallsubmit supporting document of authorized representative of existing CSS to GE, the service charge of OEM shall be deemed to be included in unit quoted rate. |
| 126 | Supply only ACB 4 pole ,fixed in CSS 415 volt, 4 pole, 50 KArupturing breaking capacity, 50 Hz ACgrade of capacity 630Amps capacity with Manual Draw out type, suitable for over current, earth fault and short circuit protection complete with spreader terminals (legs) and lugs with proper fitting in existing panel complete all as specified and directed.. |
| 127 | Supply only Bushing for existing HT panelincluding taking down old unserviceable bushing complete all as specified and directed. |
| 128 | Supply only Bushing Boot for existing HT panelincluding taking down old unserviceable bushing boot complete all as specified and directed. |
| 129 | Supply only CT for existing HT panel including taking down old unserviceable CT complete all as specified and directed. |
| 130 | Supply only Mechanism for existing HT panel including taking down old unserviceable Mechanisam complete all as specified and directed. |
| 131 | Supply only SF 6 Gas for existing HT panel including complete all as specified and directed. |
| 132 | Supply only Insulator for existing CSSincluding taking down old unserviceableInsulator complete all as specified and directed. |
| 133 | Supply only charging Socket for existingHT panel including taking down old unserviceable charging Socket complete all as specified and directed. |
| 134 | Supply only Virtual path indicator for existingHT panel including taking down old unserviceable Virtual path indicator complete all as specified and directed. |
| 135 | Supply onlybattery for RMU relay as per existing size capacity 3.6 V 1/2AA complete all as per directed |
| 136 | Supply only digital ammeter with built in selector switch 0-400 Amps of dial size 96x96mm with accuracy class 1.0, three phase complete all as directed. |
| 137 | Supply only Digital Voltmeter 0-500 volts with built in selector switch of dial size 96 x 96mm with accuracy class 1.0 complete all as specified and directed. |
| 138 | Supply only Anti-condensation space-heater withThermostatic control and cable suitable for circuit breaker compartments |
| 139 | Supply only Indicator lamp, LED type of colour (red, blue, yellow, orange, green etc). |
| 140 | Material & Labour for Calibration of VCB / RMU relay by injecting High voltage through CTS checking the over load system of VCB upto 90 % rated load and artificial fault creation and setting of relay by 10 to 15 % of rated load removing u/s overload and earh fault relay including connection with power pack includingTesting and commissioning all as directed. |
| 141 | Material & Labour for preparation of old painted surfaces by removing dust, rust oil and scraping etc for painting the CSSwith the help of jet spray paints in different location with two coats of synthetic enamel paint for matching of existing colour over the existing painted surfaces after apply putty and a coat of red oxide primer ,reapair to CSS outer door lock arrangement as per existing and writing SM/MES No,CSS details in black letter complete all as specified & as directed |
| 142 | Supply and Fixing in replacement, testing and commissioning of HTXLPE insulated cablescreened PVC bedded galvanized steel strip armoured electric power cable (heavy duty) with aluminium conductor 11 KV/6.6 KV grade (Earthed) of sizes 1 Core 95 Sqmm cable with including HT joint in both endin css comfirming cableincluding taking out the old one complete all as specified and directed. |
| 143 | Supply only self powerd numeric relay ( for HT VCB) of 3 phase over current /earth fault with high setas per existing all as specified and directed |
| 144 | Supply only Potential Transformer for HT pannel as per existing including taking down all as directed by EIC. |
| 145 | Supply and fixing in replacement of push button , ISI marked as per existing including taking down complete all as directed. |
| 146 | Supply and fixing in replacement of HT fuses sutable for LBSISI marked suitable for 6KV/11KV VCB Panel/ RMU, complete all as directed. |
| 147 | Material & Labour for Servicing of existingACB 4 Pole, 415 V, with Thermal Magnetic Release (Manual Drawout type) of capacity upto 1000 amp of CSScomplete all as directed. |
| 148 | Supply and fixing in replacement of Rotary handle sutaible for existing MCCB ,HT Pannelcomplete all as directed. |
| 149 | Supply & Fixingin replacement of AlluminumBus Bar including insulation tape sutable forexisting rating for HT panel panelcomplete |
| 150 | Material & Labour for shifting of existing CSS of 250 KVA to other location as specified not more than 50 Mtrs from existing place after disconnecting all HT/LT cable connection Shifting of cable by removing from old location and relaying & reconnecting the cables after shifting includingcommissioning at new locations completeall as specied and as directed. |
| 151 | Material & Labour for earthing complete with GI earth plate electrode 60cmx60cm x 6 mm thick buried directly in ground vertically to depth not less than 2.25 mtr below ground level with top edge of earth plate at a depth not less than 1.5 mtr below normal groundlevel connected to and including GI strip of 32X6mm as earth lead up to 7.5 mtr long fixed by means of bolts, nuts, check nuts and washers etc. of galvanised iron or steelincluding provn of GI protection pipe light grade of 32/40mm bore and connected to earth strip earthing test point all as shown in electrical plate No.5 of SSR Part-I 2009 and as specified or indicatedand testing on completion including necessary excavation & earthwork in any type of soil, PCC (1:3:6) type C1 chamber, precast slab 50mm thick in cement concrete (1:2:4)type B1 (reinforced with welded steel wire fabric (XPM) of weight not less than 4kg/sqm) with frame, funnel with watering pipe of 15mm bore Sch.40, wire mesh and lugs, test point etc. complete.Note: GI strip exceeding 7.5m long shall be measured & paid seperately. |
| 152 | Excavating over areas, n exc 1.5 m deep and getting out getting out in Soft/loose soil complete all as specified. |
| 153 | PCC 1:3:6 type C-2 (40 mm graded aggregate)cement concrete in foundation filling and mass concrete ,complete all as specified. |
| 154 | Material & Labour for Brick work with fly ash bricks(old size) built in CM(1:6) straiightor curved on plan exceeding 6metre mean radius . |
| 155 | PCC (1:2:4) type B-0(using 12.5mm graded aggregate) used as benching and coping complete all as specified and as directed . |
| 156 | Rendering 15mm thick in ce,ment and sand mortar (1:4) on fair faces of brick work or concrete surfaces of wall,surface finished even and smooth without using extra cement complete all as specified and as directed . |
| 157 | Material & Labour for preparation of new cement/brick surface and applying two coat of cement base paint over a coat of primer complete all as specified and as directed . |
| 158 | Removing excavated material to a distance exc 250 mtr but not exceeding 500m and depositing where directed at a level n.exc 1.5 mtr above the starting point complete all as specified. |
| 159 | Supply, laying,jointing, testing and commissioningof size 25 sqmm 4 Core LT underground cable, 1100 volts grade, XLPE insulated and PVC sheathed, armoured heavy duty with multistrand aluminium conductors IS-7098, laid in trenches /fixed on wall /floor /road /culverts /pole or encased in GI pipe complete all as specified.Note : (i)All incoming and outgoing cable shall be connected by suitable size of thimples/legs. |
| 160 | All as per item No 158 but 70Sqmm 3.5 core. |
| 161 | All as per item No 158 but 95Sqmm 3.5 core. |
| 162 | S&F Straight through joint kit heat shrinkable 35 to 50 sqmm 3.5/4 core for LT 1100 Volts grade complete with jointing materials and accessories suitable for 3.5/4 core XLPE armoured conductor cable of following sizes including testing of cable after joints all as specified and directed. |
| 163 | All as per item No 161 but 70 to 95 Sqmm 3.5/4 core. |
| 164 | Note: Schedule of credit amount shall be deducted from the total quoted amount of BOQ. |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
| 5 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail