| 1 | Dismantling steel work in built up sections in angles, tees, flats and channels of Lighthouse handrail including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead and all heights including cost of all labours, tools & plants etc. and all other charges, complete as directed . |
| 2 | Dismantling old plaster from the beam/ column, raking out joints and cleaning the surface for masonry work/ re-plaster including disposal of rubbish to the dumping ground within 50 metres lead.including cost of all labours, tools & plants etc., complete as directed . |
| 3 | Drilling suitable holes in reinforced or plain cement concrete with power driven drill machine to a minimum depth of 100mm upto 200mm in RCC beams, lintels, columns and slabs to introduce steel bars for sunshades/balconies, for SS hand rail including fixing the steel bars in position using epoxy resin anchor grout of approved make but excluding the cost of reinforcement, all complete as per direction of Engineer-In-Charge. including cost of all materials, labours, tools & plants, scaffolding and all other charges etc., complete as directed . |
| 4 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge including cost of all materials, labour, tools & plantsetc complete. |
| 5 | Centering and shuttering including strutting, propping etc.including cost of all materials, labours, tools & plants etc., complete as directed -Foundations, footings, bases of columns, etc. for mass concrete |
| 6 | Centering and shuttering including strutting, propping etc.including cost of all materials, labours, tools & plants etc., complete as directed-Lintels, beams, plinth beams, girders, bressumers and cantilevers |
| 7 | Centering and shuttering including strutting, propping etc.including cost of all materials, labours, tools & plants etc., complete as directed-Stairs |
| 8 | Providing and laying cement concrete 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) in foundation and plinth including laying, compacting, curing with materials, tools, labours etc. complete as directed by the engineer in charge but excluding the cost of centering and shuttering (C.C. Flooring bed) including cost of all materials, labour, tools & plantsetc complete. |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) including cost of all materials, labour, tools & plants and all other chargesetc complete. |
| 10 | Steel reinforcement for RCC work bend tied and placed in position with tested steel reinforcement bars conforming to relavent ISI specifications inluding supply of all binding wire, cutting, bending, binding etc supply of all materials labour, tools and plants etc complete as directed -Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 11 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand), including cost of all materials, labour, tools&plants,scaffolding etc., complete as directed |
| 12 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth,sides of foundation etc.including cost of all materials, labour, tools & plants and all other chargesetc complete. |
| 13 | Providing and fixing of MS rod hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railingfor Lighthouse Tower and chequred plate for cable trench and similar works, including applying priming coat of approved steel primer, cost of all materials, labour, tools & plants and all other charges etc complete |
| 14 | Providing and fixing of heavy duty G.I. pipes hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer, cost of all materials, labour, tools & plantsetc complete. |
| 15 | Providing and fixing hard drawn stainless steel wire (min 3mm) fabric of size 50 x 50 mm mesh or other suitable size SS wire mesh to be fixed & firmly anchored to the G.I. pipe hand railingof Lighthouse Tower topby means of \"U \" shaped SS clips welded/ tied/ clamps with existing pipes including the cost ofall materials, labour, tool & plants as approved by Engineer-in-charge. |
| 16 | Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc. of approved quality and brand, including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners , stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement ,core cutting in existing slab as per approval of Engineer-in charge, (for payment purpose only weight of stainless steel members shall be considered ) with all fixing accessories such as nuts, bolts, fasteners etc.including cost of all materials, labour, tools & plantsetc complete. |
| 17 | 15 mm thick Cement Plaster on rough side of single or half brick wall for exterior plastering of Lighthouse Tower steps in two coat up to all floor level, including arises, internal rounded angles chamfers and/ or rounded angles not exceeding 80 mm in girth and finished even and smooth in CM 1:2 (1 cement: 2 stone sand) including cost of all materials, labour, tools & plants , scaffolding etc complete. |
| 18 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. |
| 19 | Providing and laying Vitrified tiles ( Better Grip & Matt finish ) indifferent sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, in floor,skirting, riser of steps of Lighthouse Tower, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ sqm including grouting the joint with white cement & matching pigments after cleaning the surface and chipping the surfaceetc.including cost of all materials labours,tools and plants etc. complete. |
| 20 | Applying priming coats with water thinnable cement primer on wall surface having VOC content less than 50 grams/ litre of approved brand and manufacture, including supply of all labours, tools, materials and finishing etc. complete as directed by the engineer in charge, including cost of all materials, labour, tools & plants , scaffolding etc complete. . |
| 21 | Painting with synthetic enamel paint two or more coats on new work of approved brand and manufacture to give an even shade including cost of all materials, labour, tools & plants , scaffolding etc complete. |
| 22 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer\"s specifications including appropriate priming coat, preparation of surface, etc. complete,including cost of all materials, labour, tools & plants , scaffolding etc complete.- On steel work . |
| 23 | Fixing of stainless steel grill work horizontally on the bottom portion of covered area of L.H tower.Including transportation of dismantled stainless steel frame and jally work from Azhikode LH to Manakkodam LH and cutting ,resizing etc.of the stainless steel net/frame/door to suit the Manakkodam LH tower ,fixing the stainless steel frame work/jally/door in position the suitable anchor bolts, fixing etc.directed including all charges for transportation, refabrication with required materials, fixing in position ,scaffolding, tools and plants,,labour, and all other charges etc. complete.(The stainless steel frame work /jally/door stacked at Azhikode LH) |
| 24 | Steel work in built up G.I tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes .including cost of all materials, labour, tools & plants etc complete. |
| 25 | Providing & fixing at all heights, levels and locations Mill finish Aluminium alloy roofing sheets of alloy IS designation 31500, temper Hx8 conforming to IS 737 and dimensions as per IS code 2676 with characteristics of good formability and corrosion resistance. Theprofile sheets shall be fixed to truss members in slope or requiredpitch or curvature with Hex cap headed self drilling/tapping Stainlesssteel screws M6, 50 mm long with 3 mm EPDM seal washer etc. all inclusive of labour, scaffolding, T&P and sundries etc. complete as per directions of the Engineer-In-Charge. (Cost of truss/frame work shall be paid separately). 0.56 mm, troughed profile with center to center pitch of 200 mm, depth of 32 mm, overall profile width1092 mm, cover width 1000mm ncluding supply of all materials, labour, tools, scaffolding etc complete as directed. |
| 26 | Providing and fixingPowder coated aluminium work (minimum thickness of powder coating 50 micron)for frames of doors, windows, ventilators with extruded built up standard tubular sections/ appropriate Z sections and other sections of approved make conforming to IS: 733 and IS: 1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing / paneling, C.P. brass / stainless steel screws, including cost of all materials, labour, tools & plants etc completeasdirections of Engineer-in-charge and all other charges. |
| 27 | Providing and fixingPowder coated aluminium work (minimum thickness of powder coating 50 micron) for shutters of doors, windows & ventilators including providing and fixing hinges/ pivots and making provision for fixing of fittings wherever required including the cost of EPDM rubber / neoprene gasket required (Fittings shall be paid for separately), including cost of all materials, labour, tools & plants etc complete as directed by Engineer-in-charge |
| 28 | Providing and fixing 75x45x3.2 mm aluminium butt hinges ISI marked,anodised (anodic coating not less than grade AC 10 as per IS: 1868) transparent or dyed to required colour or shade with necessary screws etc. including cost of all materials, labour, tools & plants etc complete as directed by Engineer-in-charge . |
| 29 | Providing and fixing 100x10 mm aluminium tower bolts, ISI marked, anodised (anodic coating not less than grade AC 10 as per IS : 1868 ) transparent or dyed to required colour or shade, with necessary screws etc.including cost of all materials, labour, tools & plants etc complete as directed by Engineer-in-charge . |
| 30 | Providing and fixing 100 mm aluminium handles, ISI marked, anodised (anodic coating not less than grade AC 10 as per IS : 1868) transparent or dyed to required colour or shade, with necessary screws etc.including cost of all materials, labour, tools & plants etc complete as directed by Engineer-in-charge |
| 31 | Providing and fixing float glass panes4 mm thick glass pane (weight not less than 10 kg/sqm). including cost of all materials, labour, tools & plants etc at all heights complete as directed by Engineer-in-charge |
| 32 | Providing and fixing sign boards to the building with board made out of acrelic sheet / foam of approx size 400x150mm over which matter written on vinyl sheet of superior quality matters to be written in English & Hindi, boards to be fixed in the walls of the buildings with necessary screws etc complete as directed including cost of all materials, labour, tools & plants. |
| 33 | Providing and fixing visitors notice board of size 1.8 x 1.20m, outer frame made out25mm G.E square allround frame work and25mm GE square tubes intermediate section of1.2mtr length 2nos,vertical legs of 25mm GE square tube- 3.00m total height,stay pipe of 25mm suare g.e section of 1.5 mtr length on both legs with with aluminium sheet 16 gauge, and matterprinted in trilingual on vinyl sheet of superior quality and to be pasted on board with suitable nut & bolts ,welding as per required and painting two coat of Apoxy paint above a coat of apoxy primer , board to be fitted at suitable place with cement concrete as directed including cost of all materials, labour, tools & plants and transportation charges, scaffolding etc complete. |
| 34 | Recovery - Scrap value of Dismantled GI pipe top handrailing of LH tower. |