| 1 | Carefully removing the heavy vegetation growth, thorny bushes, uprooting trees upto a height of 1mtr above and disposal the same to a far off place for neat and tidy condition including cost of all labours, materials and other charges etc., complete |
| 2 | Restoration of damaged wooden Joists by removing of damaged wooden members and replacing with new teak wood joist including cutting, sawing, erecting and dismantling the scaffolding including the cost of all labours, materials and other wooden painting charges etc., complete |
| 3 | Water tightening the roof using with single layer flat tiles with a size 15cm x 15cm on the brick jelly concrete of 10mm thickness and laying flat tiles and necessary cement plastering the above including cost of all materials, labour charges and other charges etc., |
| 4 | Restoration of wooden doors by removing of damaged wooden members and replacing with new teak wood including cutting and sawing and other charges etc., complete |
| 5 | Painting to the wooden doors and windows using with synthetic enamel paint after scrapping the old surface including cost of all labours, materials and other charges etc., complete |
| 6 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches and applying white cement based putty of average thickness 1 mm, of approved brand andmanufacturer, over the plastered wall surface to prepare the surface even and smooth, Finishing walls with ready mixed Premium acrylic emulsion paint including all materials and labour charges etc. complete |
| 7 | Removing the existing damaged CC flooring infront of the Horticultural office building and disposal the same to a far off place including cost of all labour charges, material charges and other charges etc., complete. |
| 8 | Providing CC flooring 1:2:4 upto 40mm thickness at infront of the Horticultural office building for easy approach and to avoid rainy water stagnation including cost of all materials, labour charges etc., complete. |
| 9 | Earthwork excavation by manually and disposal thedebris to a far off place including cost of all materials, labour charges and other charges etc complete |
| 10 | laying dry river sand for strengthening the base forproviding Jelly concrete including cost of all materials,labour and other charges etc complete |
| 11 | Laying stone jelly concrete 1:3:6 for fixing the kerb stone at Fort gateway area including cost of all materials,labour and other charges etc complete |
| 12 | Construction of CR masonry wall using with cementmortar 1:6 with necessary curing by potable waterincluding cost of all materials, labour charges and other |
| 13 | Making, supplying and fixing of MS grill fencing by using with MS L angle 50x50x6mm as horizontal and vertical section end to end and the horizontal section of post 50x6mm MS flat and equal interval of 16mm dia MS round rods in vertical section each 10cm to 10cm and fixing the round emblem of ASI logo in the middle of the MS grills including fabricating, bending, welding charges and other fixing charges and applying painting etc complete. |
| 14 | Making, supplying and fixing the Sunlight passing roof (using transparent fibre sheet) t and fixing with MS square bars and tubes after removal of the damaged member at infront of the Horticulture office building including cost of all labour, material and other charges etc. complete |
| 15 | Making, supplying and fixing of MS grill Gate by usingwith MS L angle 50x50x6mm as horizontal and verticalsection end to end and the horizontal section of post50x6mm MS flat and equal interval of 16mm dia MSround rods in vertical section each 10cm to 10cm andfixing the round emblem of ASI logo in the middle of theMS grills including fabricating, bending, welding charges and other fixing charges and applying painting etc complete. |
| 16 | Rearrangements of electrification and electrical materials including cost of all materials, labour charges and other charges etc., complete. Cost of PVC pipes for wiring 10Feet |
| 17 | Cost of PVC bends |
| 18 | Cost of PVC elbow |
| 19 | 4 way junction box |
| 20 | 2mm square copper wire for electrification each 90 RMT |
| 21 | 4mm square copper wire for electrification each 90 RMT |
| 22 | Switch boards with necessary sockets and switches |
| 23 | Cost of earth, wiring connection from main service board to internal connections |
| 24 | Cost of street light 200 Watts with pole with necessary electrical connection |
| 25 | Cost of ceiling fan |
| 26 | Cost of wall mounted fan |
| 27 | Cost of LED tube light set |
| 28 | Cost of holders |
| 29 | Skilled labour including EPF and ESI charges as per the minimum wage rate |
| 30 | Un-Skilled labour including EPF and ESI charges as per the minimum wage rate |
| 31 | Packing with brick jelly concrete atmangalore tiles roof top corner side open area foravoiding rainy water incoming including cost of allmaterials, labour charges and other charges etc., |