| 1 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplusearth as directed by the Engineer-in-charge upto a distance of 30 M. from the foundation trenches. (Where machine can not reach/move).PWD SOR 2022 4.1.1 |
| 2 | Desposal of refused material/malwa distance up to 8 km etc all complete as the direction of engineer in charge. (AS PER PWD SOR 2020 /231( a). |
| 3 | S/L P:C:C (1:6:12) with 40 mm gauge brick ballast ,fine sand of 1.25 f.m and cement in foundation and under floor including all materials, labour, tools, & plant etc all completed as per the direction of engineer - in - charge.{ AS PER PWD SOR 2022 PAGE NO 18 SI NO 5.01 ITEM NO 273 } |
| 4 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position andapplying a priming coat of approved steel primer all complete DSR 2023 10.2 |
| 5 | Supply and fixing of hips of width 60cm Ridges, valley and gutters for iron roofing fixed with J or U bolts 10mm (3/8\") dia-with G.I. Limpet and bitumen washers complete including supply of all materials, labour, tools & plants etc. required for proper completion of the work and including wastage (Labour only)..80MM THICK SOR 2022 ITEM N. 537 |
| 6 | Supply and fixing Galvanized corrugated iron roofing in position including supply of all materials, labour, Tools &plants etc. required for proper completion of the work and including wastage. 1 MM THICK SOR 2022 SI.N. 11.01 ITEM N. 536 |
| 7 | Painting or varnishing work in small areas or new wood work with one coat (upto one square metre of ready mixed priming paint and one coat of approved superior quality ready mixed paint or varnish including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. Paint to be used should confirm the ISi no. 103-1950. |
| 8 | S/L C:C (1:2:4) with 20 mm stone grit, coarse sand & cement etc all complete as the direction of engineer in charge. (AS PER PWD SOR 2022 PAGE NO 18 SI NO 5.07 ITEM NO 279(a).] |
| 9 | First class Brick Work in (1:4) cement & four coarse sand 2.20 F.M. morter in foundation and plinth and T&P etc all completed as per the direction of engineer - in - charge. (AS PER PWD SOR 2022 PAGE NO 20 SI NO 6.05 ITEM NO 305 (a) |
| 10 | 12 mm thick plaster with cement and coarse sand of1.25 fineness modules in (1:4) over brick work minimum thickness not to be less than 1 cm including supply of all material, labour, tools & plant etc required for proper completion of the work. (AS PER PWD SOR 2022 PAGE NO 36 SI NO 13.11 NEW ITEM ) |
| 11 | GST Please Enable Macros to View BoQ information |