Name of Work:- Tydy Ifjlj Esa Fufezr Lvksj Ds Ikvhzku ,Oa Nr Dh Ejeer Dk Dk;Za
Sl. No.
Item Description
1
Construction of embankment with approved material obtained from borrow pits with all lifts and 2 km leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Chap 3 Sr. no 3.16)
2
Cement Concrete with 4cm gauge approved stone coarse sand and cement in proportion of 8:4:1 including supply of all material labour & T&P etc. required for proper completion of the work.
3
M-150 brick work in 1:3 with (one cement and Five course sand mortar) in Substructure in foundation and plinth inculuding supply of all meterials,labour and T&P etc.reuired for proper complete of work.
4
12 mm thick plaster with cement and approved course sand in proportion 1:3 over brick work minimum thickness not to be less than 1 cm including supply of all materials labour and T&P etc. required for proper completion of the work.
5
WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
6
Cement concrete with 2cm gauge approved stone grit, coarse sand & cement in proportion of 3:1.5:1 in pavement as per design thick for c.c. road coarse & fine aggregate confirming to IS standard mixed in concrete mixture/plant of not less then 0.2 cum capacity &appropriate weight batcher using approved mix design, laid in approved fixed form work (steel channel) laying and fixing of 125 micron thick polythene film, wedges, steel plates including shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation pavements for not less then 14 days curring compound (where as specified) and water finishing to lines & grade including supply of all material, labour tools &plants etc. required for proper completion of work and also including complete shifting of material & concrete etc.
7
Add CGST+SGST @18% of Estimate cost Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.