| 1 | TotalAmount of Sch \"A\" Part- I(BUILDING WORK)Note : This Schedule is not Pre-Priced by MES and the Pre-Priced rate indicated as \"Rs. 0.00\" under col.5 signifies this fact only. |
| 2 | Construction of Fire Station Building and Hose hot & drying tower with permanent specifications complete allas shown on drawings and as specified. |
| 3 | Construction of Garrage Building with permanent specifications complete all as shown on drawings and as specified. |
| 4 | Construction of Elevated Guard Post Building with permanent specifications complete all asshown on drawings and as specified.. |
| 5 | TotalAmount of Sch \"A\" Part- II (INTERNAL WATER SUPPLY WORK) |
| 6 | TotalAmount of Sch \"A\" Part- III (INTERNAL ELECTRIFICATION WORK) |
| 7 | TotalAmount of Sch \"A\" Part- IV (PLUMBING WORK) |
| 8 | TotalAmount of Sch \"A\" Part- V (AREA DRAINAGE WORK) |
| 9 | TotalAmount of Sch \"A\" Part- VI (SEWAGE DISPOSAL WORK) |
| 10 | TotalAmount of Sch \"A\" Part- VII (ROAD & PATH WORK) |
| 11 | TotalAmount of Sch \"A\" Part- VIII (EXTERNAL WATER SUPPLY WORK) |
| 12 | TotalAmount of Sch \"A\" Part- IX (EXTERNAL ELECTRIFICATION WORK) |
| 13 | TotalAmount of Sch \"A\" Part- X (RETAINING WALL) |
| 14 | TotalAmount of Sch \"A\" Part- XI (SITE CLEARANCE) |
| 15 | TotalAmount of Sch \"A\" Part- XII (DEMOLITION/DISMANTLING) |
| 16 | Sch \"A\" Part - XIII (Misc Items ) Note : This Schedule is not Pre-Priced by MES and the Pre-Priced rate indicated as \"Rs. 0.00\" under col.5 signifies this fact only. |
| 17 | Sheet metal enclosure double door type for MCB TPN DB upto 125 Amps 4 way vertical type 415 volts with suitable busbar and neutral link, fixed flush to wall and including all internal connection, necessary reducer lugs all as directed. |
| 18 | Earthing complete with galvanized steel earth plate electrode600mm x 600mm x 6mm buried directly in ground (earth pit not less than 2.25 m deep below ground level) with top edge of earth plate not less than 1.5m below normal ground level connected with galvanized iron earth lead wire 4mm dia by means of bolts, nuts, check nuts and washers of galvanized iron or steel complete with 15mm dia GI light grade protection pipe, 20mm dia GI medium grade watering pipe with funnel including charcoal, dust, salt, PCC M-15 type B1 in pit with angle iron (25x25x3)mm frame work with precast RCC 1:2:4 type B-1 cover reinforced with 8mm dia TMT bars @ 150mm C/C both ways and 12mm dia MS fabricated handle, test point etc. in and including light grade GI protection pipe 20mm bore up to 7.5m length for drawing in earth lead wire, all as shown in electric plate No. 3 of SSR Part-I complete with necessary earth work in any type of soil, removal of soil to a distance not exc. 50m, testing on completion complete all as specified and directed.Note:- On testing after completion of earthing, if desired earth resistance is not obtained, the earthing will be re-done by the contractor at his own risk & cost to the entire satisfaction. |
| 19 | Cabin wall fans complete with accessories, AC single phase 50Hz, 230 Volt of size 300mm sweep blades, frame and louvers, complete all as specified and as directed. |
| 20 | Supply only portable inspection light 60 watt, 230 volts, AC, complete all as specified and as directed. |
| 21 | Construction of septic tank for 10 users (Brick construction) complete all as specified and as shown on drgs. |
| 22 | Construction of soakage well (Brick construction) 1.2m dia and 3.0m deep (internal dimensions) , complete all as specified and as shown on drgs. |
| 23 | Earthing complete with galvanized steel earth plate electrode 600mm x 600mm x 6.0mm thick buried directly in ground ( earth pit not less than 2.25 mtr below normal ground level) with top edge plate not less than 1.5 metre below normal ground level connected to galvanized earth strip of size (32x6)mmas earthing lead by means of bolts, nuts, chuck nuts and washers of galvanized iron earth lead with 15 cm thick alternate layers of charcoal dust & common slat including PCC pit in PCC 1:2:4 type B-1, RCC covermade out of cement concrete 1:2:4 type B-1 (using 20 mm graded crushed stone aggregate) reinforced with TMT steel bars 8 mm dia @150 mm c/c both ways with suitable handle andangle iron (40x40x5)mm frame, GI medium grade watering pipe 20mm bore and funnel with wire mesh, GI light grade protection pipe 40mm bore up to main board complete as shown on electrical plate No 3 of MES Sch 2009 (Part-I) and testing on completion complete all as specified and directed. Note: - On testing after completion of earthing, if desired earth resistance is not obtained, the earthing will be re-done by the contractor at his own risk & cost to the entire satisfaction. |
| 24 | Taking down MCB DBs/MCB SP & SPNcomplete all as specified and as directed. |
| 25 | Taking down old unserviceable earthing any type and sizecomplete all as specified and as directed. |
| 26 | Taking down unserviceable cable any size, complete all as directed. |
| 27 | Deduction to be made from BOQfor Sch \"A\" Part -XIV (Schedule of credit) during AOC.Note: Tenderers shall not quote for this schedule. |