| Sl. No. | Item Description |
| 1 | LIST OF WORKS (Schedule A Part I to Part XV) |
| 2 | Total amount of Sch \"A\" Part-I (Building Works) brought forwarded from sl page No 27. |
| 3 | Total amount of Sch \"A\" Part-II ( Foundation for DG set) brought forwarded from sl page No 28. |
| 4 | Total amount of Sch \"A\" Part-III (Emergency Lighting) brought forwarded from sl page No 29. |
| 5 | Total amount of Sch \"A\" Part-IV (External water supply) brought forwarded from sl page No 30. |
| 6 | Subtotal |
| 7 | Sch \"A\" Part- VI (MISCELLANEOUS) Note : This schedule is not pre priced by MES and the pre priced rate indicated as \"Rs. 0.00\" under Col.5 signifies this fact only. |
| 8 | Supply of 72000 litre FRP tank, including hoisting and fixed in position over slab alignmentsecuring in place including and connecting inlet / outlet pipe lines to ensure stable and leak proof installations as per standards as directed by Engr-in-charge.. |
| 9 | EMERGENCY LIGHTING |
| 10 | LT SWITCH BOARDS (OUTDOOR TYPE) Supply, erection, testing & commissioning of the following panel boards(Makes : LEGRAND/ABB /L&T) : |
| 11 | LDB PANEL(LIGHTING DISTRIBUTION BOARD PANEL) |
| 12 | Incomers:- |
| 13 | 63A, 4P, MCCB of 25KA breaking capacity with O/C, S/C andThermal Magnetic based Releases -1 Nos . Each consisting of following, 6A, control MCBof C-Curve - 3Nos, Multifunction Meter(MFM) With RS485 communication port -1 No, LED Type R-Y-B Phase Indication Lamps. - (1 set) On,Off & Trip Indications: (1sets), 63A/5A, CL-1, 15VA, Tape wound CT\"s - 3Nos |
| 14 | Outgoings:- |
| 15 | 32A, 4P, MCCB of 25KA breaking capacity with O/C, S/C andThermal Magnetic based Releases -7 Nos(4 DEDICATED + 3SPARE). Each consisting of following, 6A, control MCBof C-Curve - 3Nos, Multifunction Meter(MFM) With RS485 communication port - 1No. LED Type R-Y-B Phase Indication Lamps. - (1 set), On,Off & Trip Indications: (1 sets ), 32/5A, CL-1, 15VA, Tape wound CT\"s - 3Nos |
| 16 | Busbar |
| 17 | 415V, 100A,3Ph, 4wire 50Hz, Aluminium busbars (91E electrical grade) having withstand ability symmetrical fault level of 25KA for 1 Sec. - LS (with 100% Neutral) |
| 18 | SPD |
| 19 | This panel shall include Protection at the Main Distribution Board / Sub distribution board or in LT panel of the power supply system.Class B+C/ Class I+II (according to IEC 61643 - 1)(THREE PHASE+ NEUTRAL) Pluggable type SPD with potential free contact and thermal disconnector has to be connected between Line and Neutral and SPD of Spark Gap type between Neutral and Earth of following ratings should include base element & pluggable arresters. If required, remote signaling should be provided for remote monitoring purpose.Nominal Voltage, Un -230V, 50/60 Hz,Line to Neutral-MOV with built in thermal fuse,Neutral to Earth-Spark Gap Encapsulated / Non-exhausting,MCOV of 320VNominal current -90 kA (8/20µ sec) - 30 kA each. Voltage protection level <1.4 kV.Protection Modes for : L & N toPE.Maximum Discharge Current Imax per pole-50 kA (8/20µsec) Mounting on -Din railMax. Back-up fuse-Up to 160 amps max. Depending up on panel design & breaking capacity. Approvals: OVEDegree of Protection:IP 20Operating temperature range:-40°C to +85°C Response Time-< 25nano secondsMake: -OBO/Legrand/L&T/ABBModel Number- V50 3+ NPE,FS ,BACK UP FUSE NEEDED 160 A, 3PHASE , 4 WIRE SYSTEM DIN RAIL MOUNTED SPDClass B+C/Class I+II Quantity-1No |
| 20 | Note : Contractor shall submit drawing for approval. Cost of PCC work shall be deemed to be included in quoted rates. Panel shall be provided with name plate, door, locking arrangement etc |
| 21 | Supply installation, testing & commissioning of 4-WAY , VTPNDB NO. 4, DOUBLE DOOR, IP 43 CONSISTING OF FOLLOWINGS :- |
| 22 | Incomers:- 32A, 4P, MCCB of 25KA breaking capacity with O/C, S/C andThermal Magnetic based Releases -1 Nos |
| 23 | Outgoings:- 40A, DP, MCB of 10KA breaking capacity with O/C, S/C andThermal Magnetic based Releases -4 Nos(3 DEDICATED + 1SPARE). |
| 24 | Busbar:- 415V, 32A,3Ph, 4wire 50Hz, Aluminium busbars (91E electrical grade) having withstand ability symmetrical fault level of 25KA for 1 Sec. - LS |
| 25 | Supply installation, testing & commissioning 6-WAYVTPNDB NO. 1 + VTPNDB NO. 2+ VTPNDB NO. 3, DOUBLE DOOR, IP 43 CONSISTING OF FOLLOWINGS :- |
| 26 | Incomers:- 32A, 4P, MCCB of 25KA breaking capacity with O/C, S/C andThermal Magnetic based Releases -1 Nos |
| 27 | Outgoings:- 40A, DP, MCB of 10KA breaking capacity with O/C, S/C andThermal Magnetic based Releases -6 Nos(4 DEDICATED + 2SPARE). |
| 28 | Busbar:-415V, 32A,3Ph, 4wire 50Hz, Aluminium busbars (91E electrical grade) having withstand ability symmetrical fault level of 25KA for 1 Sec. - LS |
| 29 | ISOLATOR FOR UPS |
| 30 | Supply installation, testing & commissioning 63A 4P 25KA MCCB Enclosure : 63A 4P 25KA MCCB with Thermal Magnetic based O/C, S/C Release (Ics= 100% Icu), Extended Rotary Operating Handle, Spreader Terminal Links-4P, Earth Fault Module, Shunt trip Coil,240VAC, Auxiliary+Trip Contact For MCCB, Indicating Lamps for R, Y- Phases, 230V AC, LED, Indicating Lamps for Blue - Phases, 230V AC, LED, Indication Lamps - On, Off & Trip 240V AC, LED, 6A SP MCB 10kA \"C\" Curve |
| 31 | UPS |
| 32 | Supply , Erection ,testing and Commisioning of 20KVA Microprocessor based double conversion on line UPS System with 3 phase input and 3ph output IGBT Basedas per the requirement/ Technical Specifications including SMF Batteries to provide 90 Minutesbackup with necessary accessories (Considered Battery Racks, interlinks, 5 Mtrs UPS to battery cable, insulating mat etc) |
| 33 | LT Cables 1.1KV (Makes : KEI / HAVELLS POLYCAB). |
| 34 | Supplying, laying, testing and commissioning of cables of the following sizes of cables on trays built up trenchesor through GI pipes or clamping to column wall or structure using GI spacers and saddles (at an interval of 300mm for cables of OD up to 25mm and 500mm for the cables) scope shall includes supply of these saddles, hardware and consumables. Cables laid in trays shall be dressed and tied with black nylon ropes in the horizontal portions and clamped using the GI saddles at every 750mm in the vertical portion. What ever cables are laid through GI pipes scopes shall also include sealing the mouth of the GI pipes. Where ever cables are to be laid in built up trenches workshall be includes opening the RCC slabs before laying and replacing them after laying. The work shall be carried out as per the specification and as per the directions of the Engineer-in-charge.NOTE:All Aluminium Cable(Size) complying to IS 7098 Part 1,XLPE insulation,Inner & Outer Sheath complying ST2, Armoured Cable. Quoted rate shall include lugs, glands, nuts, bolts etc |
| 35 | 4.0 Core x 50 Sq.mm |
| 36 | 3.5 Core x 35 Sq.mm |
| 37 | 4 Core x 16 Sq.mm |
| 38 | 4 Core x 10 Sq.mm |
| 39 | 3 Core x 6 Sq.mm |
| 40 | CABLE TRAYS |
| 41 | Supply & Installation ofheavy duty hot dipped galvanized perforated type Cable trays of following sizes, suspended from ceiling or fixed vertically on wall / column as per site including necessary supports like anchor bolts, hangers, brackets etc. and accessories like Elbows, Bends, Tee, requisite support / suspenders, hardware etc. as per site requirement.All supporting structure & hardware including nuts & bolts etc. shall be of galvanized iron as approved. Height of cable tray will be 50 mm. these all elbows, Bends, Reducers, Tees should be factory made. All the cable trays should be providedwith 2mm thickness. |
| 42 | Without Cover |
| 43 | 600 MM widthperforated cable tray |
| 44 | 300 MM width perforated cable tray |
| 45 | 150 MM width perforated cable tray |
| 46 | 75 MM width perforated cable tray |
| 47 | Steel for supporting the above Cable Trays |
| 48 | Ladder trays Without cover |
| 49 | 600 MM widthLadder cable tray |
| 50 | 300 MM width Ladder cable tray |
| 51 | GI STRIPS |
| 52 | Supply, Laying and fixing of 32 x 6mm GI flat |
| 53 | Supply, Laying and fixing of 25 x 6mm GI flat |
| 54 | Supply, Laying and fixing of 25 x 3mm GI flat |
| 55 | 8 SWG GI wire |
| 56 | EARTH PITS |
| 57 | M&L for Seperate earth pit for the BODY with 100mm dia \"B\" class 2.5 long CI pipe withproviding GI funnel covered with mesh of suitable size enclosed in a CC chamber of 450mm X 450mm X 3mm with suitable reinforced CI cover duly providing staggered holes of 16 nos of 12mm dia to the earth electrode filling salt and charcoal around 150mm from the bottom of the pipe to thebottom of CC chamber. The connections from the electrode through GI strip of 40 X 6mm length provided with suitable size of 14 nos holes with GI washers, nuts, bolts and all labour charges etc., complete. Quoted rate shall include Earth work in any type of soil, Test point made of GI strip and insulators and GI strip 40 x 6mm upto 7.5 RM from earthing electrode, ER value testing, submission of Test certificates etc. ER shall not be more than 2 Ohm. |
| 58 | Note: All Earth Pit Chambers shall be Constructed with 100mm Solid Blocks. All Earth Pit Chambers shall be Numbered and Painted with Reputed make Paint. |
| 59 | Supply, installation, testing and commissioning of wall mounted FLAMEPROOF distribution boards of 16 SWG MS sheet steel cubical design, double door, dust and vermin proof suitable for operation on 50 Hz A.C. supply system, IP-55 protection, conforming to specifications and as per drawings complete with internal wiring, earthing, painting, mounted with specified equipment and accessories as required all as specified & directed of following sizes:- |
| 60 | 6Way SPN DB ,(EMERGENCY LIGHTING), Incoming: 40A DP ,30ma RCBO - 1Nos.Outgoings: -10A 10KA SP MCB- 4Nos. |
| 61 | 70WATT MEDIUM BAY LIGHT |
| 62 | Supply, Install, Test & commissioning Medium-bay downlight LED (Light Emitting Diode) system power: 70W, Luminous flux of luminaire 8400lm, Color temperature of 4000K, Neutral white, CRI>80, 230V constant current driver,70%of luminous flux after 50,000 operating hours; Energy efficient LEDs, Direct light emission, Luminaire housing in die cast aluminum, Polyester powder Black coloured coat applied over a 5- stage pre-treatment, with lens, ZHLS (ZERO HALOGENLOW SMOKE) wiring, Electronic control gear Protection class I, IP 65. Each light fitting to be provided with one junction box for loop-in loop-out of 3 core copper wire. |
| 63 | NOTE FOR ITEM NO 21: |
| 64 | Supply of anchor fasteners / clutch wires / chain link / threaded rod / etc. all the required accessories for final installation at site shall be part of light fitting supplier/Electrical Contractor . (length of above accessories to be sufficient from Ceiling/Slab to light fitting) |
| 65 | Load bearing test for the suspenders used for fixing the light fixtures shall be carried out before installing the light fixture. |
| 66 | Lighting Vendor/Supplier should produce illumination design reports indicatingAverage/minimum/max lux achieved & uniformity factors. |
| 67 | After completion of light fittings installation, Lighting Vendor/Supplier/Electrical Contractorshould inspect the site, lux level to be measured and shown / proved ( Design Vs. actual obtained). |
| 68 | Incase of any quality issue or non achievement of the Lux level, all the light fixtures and associated accessories need to be replaced free of cost. |
| 69 | Removing of the cartoon/packing boxes shall be part of supplier/contractor. |
| 70 | After successfully completion of installation of light fittings, certificate shall be given by OEM to ensure the installations are done as per OEM standards. |
| 71 | Mockup of the light fixtures as per approved makes shall be done for finalisation of light fxtures. |
| 72 | FIRE ALARM AND DETECTION SYSTEM AND GAS DETECTION SYSTEM |
| 73 | PUMP STATION |
| 74 | Supply, Installation, Testing and Commissioning of High Pressure Water Mist Pump Skid having 6 Nos. of triplex high pressure plunger pumps of capacity ≥95 LPM @ ≥130 bar each pump mounted on skid with N+1 configuration, engine power 30KW, power supply 3 phase (400V AC, 50Hz) connected to individual motors (number of pumps as per the maximum water demand +10%), with low pressure jockey pump unit of capacity 1 l/min @ 18bar, engine power requirement 0.75KW (400V, 50Hz), including Stainless Steel suction line, NBR hose, ventilating ball valve (3/8\") (I) brass nickel plated, spheroidal pump casing, stainless steel Filter 100µm, Brass case Strainer, Brass Safety valve, stainless steel starting solenoid valve 230VAC and high pressure manifold including NBR hose, Stainless Steel non-return valve, pressure gauge 0-250 bar, 2xStainless Steel pressure sensor connection range 0-250bar and 4-20mA, Stainless steel/Brass over flow valve, Stainless Steel test valve, ventilation connection & ball valve complete in all respect and complete as required.The pump system should have a third party approval from VdS/UL/FM/TuVMakes :- Aquasys / Fogtec / Minimax |
| 75 | Supply, Installation, Testing and Commissioning Booster Pump Filtertaion Unit to provide the required pressure at the suction line of HP Pumps. The booster pump filtration unit of flow ≥ 600 LPM.The unit shall also be equipped with a filtration unit that includes the filter with screen element of 100 microns as well as the pressure gauge and the pressure switch, necessary shut-off ball valves shall be part of the assembly. Materials (contact to water) shall be of Stainless Steel with min. 1,5 bar.The booster pump unit shall be VdS/ UL/ FM / TuV approved. Makes :- Aquasys / Fogtec / Minimax |
| 76 | Supply, Installation, Testing and Commissioning of PLC based Control panel for water mist systems with case and door impregnated and powder coated structure with pedestal with system of protection IP 54. The control cabinet should take care of all the controls and monitoring of the pump system.a. Power supply requirement 440 V AC/50 Hzb. Complete cabling of internal system on connector blocks for external cabling/signals, controlling is realized through PLC.d. Illuminating switches to be provided for all HP Pumps.e. Ampere meter for each hp-pump,f. Push Buttons for Reset, HP Pump Start & Stop.g. Signal Lamps for Start of HP Pumps,h. Fault indication for each hp-pump, power supply, jockey pump etc. via panel displayi. Voltmeter with selector switch,j. The panel should come complete with provision for remote monitoring of the status and the control for all pumps in the water tank room and through IBMS Via Modbus TCP/IP.k. Should have facility to transmit the operation signals or running signals via potential free change over contactsThe panel should have a third party approval from VdS/UL/FM/ TuV. Makes :- Aquasys / Fogtec / Minimax |
| 77 | Supply, Installation, Testing and Commissioning ofpiston compressor unit having flow of 150 l/min @ 6-10 bar pressure, power requirement 1.2kW (400V, 50Hz) including pressure buffer vessel, pressure sensor (0 to 10bar), air filter with water separator, pressure reducer 10/6 bar, complete in all respect and complete as required.The compressor unit should have a third party approval from VdS/UL/FM/TuV. Makes :- Aquasys / Fogtec / Minimax |
| 78 | COMPONENTS |
| 79 | Supply, Installation, Testing and Commissioning of Stainless Steel (SS316) Pneumatic operated Directional Valveof 3/4\" with operating pressure of 140 bar, including SS 2/2 way ball valve complete with pneumatic drive and manual override, Micro switch for position monitoring, SS ball valves for main pipe at inlet, outlet & test connection. Including all fittings, connecting pieces and fixings, complete in all aspects.Valves should have a third party approval from VdS/UL/FM/TuV Makes :- Aquasys / Fogtec / Minimax |
| 80 | Supply, Installation, Testing and Commissioning of Stainless Steel (SS316) Pneumatic operated Directional Valveof 1\" with operating pressure of 140 bar, including SS 2/2 way ball valve complete with pneumatic drive and manual override, Micro switch for position monitoring, SS ball valves for main pipe at inlet, outlet & test connection. Including in all fittings, connecting pieces and fixings, complete in all aspects.Valves should have a third party approval from VdS/UL/FM/TuVMakes :- Aquasys / Fogtec / Minimax |
| 81 | Supply, Installation, Testing and Commissioning of high pressure water mist stainless material open type of nozzles in accordance with the parameters derived from the fire test results for Cable gallery and combustible liquid application. Nozzles should have imbedded stainless steel micro nozzles with centralised SS316 filters and brass swirling device and including EPDM / NBR O- ring,complete in all aspects.Note:- Nozzle should have been tested for cable tunnel application & combustible liquid application.should have a third party approval from VdS/UL/FM/TUVMakes :- Aquasys / Fogtec / Minimax |
| 82 | Supply, Installation, Testing and Commissioning of Stainless material 316 nozzle adaptors of L12 size with M18 thread including cutting ring and nut for nozzle mounting, complete in all respect and complete as required.Makes :- Aquasys / Fogtec / Minimax |
| 83 | Supply, Installation, Testing and Commissioning of the hose-reel cabinet system. It shall be part of systems fixed installation with automatic or open nozzles. Nozzle head shall have pressure of 100 bar. The micro nozzle in the gun shall have been tested for electrical conductivity up to min 30KVA so that it is safe for using on electrical fires.The Hose-reel cabinet system includes the wall cabinet and the firefighting gun. Material of box shall be carbon steel along with corrosion resistance painting. The spray head should have integrated micro-nozzles with swirling device. The water mist gun shall have any four of different spray pattern settings which can be chosen. -Very fine water fog-Combination of very fine water fog and broad central jet of fog-Combination of very fine water fog and narrow central jet of fog-Central jet of fog-Full jet.Note: The micro nozzle in the gun shall have been tested for electrical conductivity up to 30KV so that it is safe for using on electrical fires.The certificate for the same shall be submitted. Makes :- Aquasys / Fogtec / Minimax |
| 84 | Pipe-works & Cabling |
| 85 | Supply, Installation, Testing and Commissioning of seamless stainless steel pipes of minimum AISI 316/ 316L quality, annealed and should have designed for the working pressure of 120 bar including compression fittings, Welded fittings, supports & related accessories, complete in all respect and complete as required for following sizes,The required approximate pipes for the project are as follows: |
| 86 | supplying and installing 316L stainless steel tubing with a 12.0 mm outer diameter and 1.5 mm wall thickness as per ASTM A269. Its low carbon content enhances corrosion resistance, making it ideal for marine and chemical environments. Annealing improves ductility, strength, and resistance to oxidation and stress corrosion. |
| 87 | supplying and installing 316L stainless steel tubing with an 18.0 mm outer diameter and a 2.0 mm wall thickness, manufactured according to ASTM A269 standards. The low carbon content of 316L ensures superior corrosion resistance, particularly in harsh environments like marine or chemical settings. The tubing is annealed to enhance its ductility and strength, making it suitable for applications that demand high reliability and resistance to oxidation and stress corrosion. |
| 88 | supplying and installing 316L stainless steel tubing with an 22.0 mm outer diameter and a 2.0 mm wall thickness, conforming to ASTM A269 standards. This material, with its low carbon content, offers excellent corrosion resistance, particularly in aggressive environments such as marine or chemical applications. The annealed condition enhances the tubing’s ductility and mechanical properties, ensuring durability, high strength, and resistance to oxidation and stress corrosion in demanding conditions. |
| 89 | supplying and installing 316L stainless steel tubing with a 28.0 mm outer diameter and a 2.0 mm wall thickness, in accordance with ASTM A269 standards. The 316L alloy, known for its low carbon content, provides exceptional resistance to corrosion, especially in harsh environments like marine or chemical settings. The annealed tubing enhances ductility, strength, and reliability, ensuring optimal performance with resistance to oxidation and stress corrosion in demanding applications. |
| 90 | supplying and installing 316L stainless steel tubing with a 60.3 mm outer diameter and a 3.91 mm wall thickness, manufactured according to ASTM A269 standards. The 316L grade, with its low carbon content, ensures high resistance to corrosion, particularly in aggressive environments such as marine, chemical, or high-temperature applications. The tubing is annealed, enhancing its ductility and mechanical properties, ensuring durability, strength, and resistance to oxidation and stress corrosion under demanding conditions. |
| 91 | Supply, Installation, Testing and Commissioning of AISI 316/ 316L pipe (for compressed air supply) confirming toincludingfittings and supports, complete in all respect and complete as required.OD 22.0 x 2.0 mm thickNote:- The following sizes are indicative and the contractor has to design and derived the final quanitity according to the proposed system.Make :- Jindal / Ratnamani or Equivalnet. |
| 92 | Supply, Installation, Testing and Commissioning of cables required for HPWM system integration, including laying of YSLY-JZ multi-core flexible cable4C x 25 Sq.mm within the pump room complete in all respect and complete as required.Make :- Polycab / Finolex / KEI / Reputed Make |
| 93 | Supply, Installation, Testing and Commissioning of cables required for HPWM system integration, including laying of YSLY-JZ multi-core flexible 3C x 1 Sq.mm within the pump room complete in all respect and complete as required.Make :- Polycab / Finolex / KEI / Reputed Make |
| 94 | Supply, Installation, Testing and Commissioning of cables required for HPWM system integration, including laying of YSLY-JZ multi-core flexible 4C x 1 Sq.mm within the pump room complete in all respect and complete as required.Make :- Polycab / Finolex / KEI / Reputed Make |
| 95 | Supply, Installation, Testing and Commissioning of cables required for HPWM system integration, including laying of YSLY-JZ multi-core flexible 4C x 6 Sq.mm within the pump room complete in all respect and complete as required.Make :- Polycab / Finolex / KEI / Reputed Make |
| 96 | Supply, Installation, Testing and Commissioning of cables required for HPWM system integration, including laying of YSLY-JZ multi-core flexible 4C x 2.5 Sq.mm within the pump room complete in all respect and complete as required.Make :- Polycab / Finolex / KEI / Reputed Make |
| 97 | Supply, Installation, Testing and Commissioning of cables required for HPWM system integration, including laying of YSLY-JZ multi-core flexible 2C x 1.5 Sq.mm within the pump room complete in all respect and complete as required.Make :- Polycab / Finolex / KEI / Reputed Make |
| 98 | Supply, Installation, Laying, Testing and Commissioning of 150 Sq.mm Copper Cable, 4-core, shall be supplied in accordance with IS 8130/IEC 60228 standards, featuring stranded or flexible copper conductors, XLPE or PVC insulation with a 1.1 kV rating, and a PVC outer sheath. The cable must meet fire resistance and weatherproofing requirements as per IS 694 or IEC 60332 |
| 99 | Accessories for 20KL tank to 200KL tank and Pump House |
| 100 | Supply, installation, laying, testing, and commissioning of pipes made of stainless steel (SS304) with a nominal diameter (DN) of 65 mm, pressure rating of PN10, and a wall thickness of 2 mm, including all necessary fittings, supports, and accessories to ensure proper functionality and adherence to specified standards. |
| 101 | Supply, installation, laying, testing, and commissioning of stainless steel (SS304) pipes with a nominal diameter of DN100, pressure rating of PN10, and a wall thickness of 2 mm including all necessary fittings, supports, and accessories to ensure proper functionality and adherence to specified standards. |
| 102 | Supply, installation, testing, and commissioning of a reducer fabricated from stainless steel grade SS304, with a nominal diameter (DN) transition from DN 100 to DN 65. This involves ensuring precise alignment, proper connections, and verification of material quality |
| 103 | Supply and Installation of Butterfly Valve is a flanged type with a nominal diameter (DN) of 100 mm, designed for use in pipelines with a pressure rating of PN 10, which can withstand a maximum pressure of 10 bar. The valve is made from SS304, a stainless steel including leak-proof attachment to adjoining pipes, making it ideal for controlling fluid flow in moderate-pressure systems. |
| 104 | Supply, installation, testing, and commissioning of a compensator/expansion bellow with nominal diameter (DN) of 100 mm, pressure rating of PN10, and construction material of stainless steel grade SS304 including proper alignment during installation, verifying the integrity of the bellow through pressure and leakage tests, and commissioning the component. |
| 105 | Supply, installation, testing, and commissioning of flanges with a nominal diameter (DN) of 65 mm, designed to operate at a pressure rating of PN10, capable of handling up to 10 bar pressure. The flanges are constructed from SS304 stainless steel, which offers high resistance to corrosion, durability, and reliability. |
| 106 | Supply, installation, testing, and commissioning of flanges with a nominal diameter (DN) of 100 mm, designed for systems with a pressure rating of PN10, capable of withstanding pressures up to 10 bar. The flanges are constructed from SS304 stainless steel, which offers high resistance to corrosion, durability, and reliability. |
| 107 | Supply, installation, testing, and commissioning of welded elbow fittings with a nominal diameter (DN) of 100 mm, designed to operate at a pressure rating of PN10, capable of withstanding up to 10 bar. These elbows are constructed from SS304 stainless steel, ensuring excellent corrosion resistance, mechanical strength, and reliability for various industrial applications |
| 108 | SUPPORTING STRUCTRE |
| 109 | Supply& fix Stainless Steel structural support with ISI marked complete all as specified and directed. Cost of making good to the damage made by the contractor to the existing nearby services is deemed to be included in the quoted rate. |
| 110 | Supply & Fixing of Support Brackets made of L50x50x5 mm MS angle fabricated to 150x300 suspended to the sofit of the tunnel with necessary protection coat for mounting water mist nozzles and piping along the tunnel walls. |
| 111 | Supply & Fixing of Pipe Clamps to secure the pipes at fixed intervals and prevent movement during system operation. - Material: Stainless Steel (Grade SS 304)- Size: For various pipe diameters Type: U-clamp or similar design |
| 112 | Supply & Fixing of Anchors and Bolts Anchors and bolts for fixing brackets, supports, and hangers to tunnel walls and ceiling. - Material: Stainless Steel Bolts, Nuts, and Anchors- Size: M10 to M12 Type: Expansion bolts for concrete walls and walls with reinforcement. |
| 113 | Supply & Fixing of Nut and Bolts for fixing clamp to the brackets with Material: Stainless Steel Bolts, Nuts, and Anchors- Size: M10 to M12 Type: Expansion bolts for concrete walls and walls with reinforcement. |
| 114 | Supply, Installation, Testing and Commissioning of water stoarge tank of Polyethylene/HDPE material for a minimum operation upto 30minutes.Tank shall be provided with level measurement with level switches. This level measurement optically indicates the water level in the tank. The tank should have a provision of manhole and drain connection. Along with the tank, accessories such as feeding water line, complete in all respect and complete as required. Tank material: Polyethylene/HDPE Make:- Sintex / Aquatech / Kaveri / |
| 115 | supply, laying, Installation and testing of a 75 mm in diameter UPVC pipe , includes procuring the pipe in compliance with approved standards and ensuring careful jointing to achieve optimal functionality and long-term durability. Connecting OHT with HPWMS feed tank (20KL) to fill by gravity including neccessary accessories like sockets, L-bends, supports, clamps etc. |
| 116 | Supply,fixing, jointing, testing, and commissioning of 75mm UPVC ball valves, includes procuring the ball valves in compliance with approved standards and ensuring precise jointing to ensure optimal functionality and long-term durability. |
| 117 | PROVISION FOR HPWM POWER SUPPLY: The HPWMS Sysetm requires Power Supply for 170KW , Following are the Electrical Items required for the same |
| 118 | 630A, 4P, MCCB of 50KA breaking capacity with O/C, S/C, E/F andMicro Processor based Releases 1 Nos. Each consisting of following.6A, control MCBof C-Curve - 3Nos,Multifunction Meter(MFM) With RS485 communication port -1 No. , LED Type R-Y-B Phase Indication Lamps. (1 set), On,Off & Trip Indications: (1 sets ), 630/5A, CL-1, 15VA, Tape wound CT\"s - 3Nos. It shall include weatherproof powder coated enclosure of suitable size, name plate, door, locking arrangement, earthing terminal, mounting stand made of MS angle, PCC grouting etc |
| 119 | Notes for High Pressure Water Mist System : (i) Contractor shall note that in absence of test reports validating the design of water mist system from recognised third party laboratories, the system shall not be accepted for installation. (ii) Contractor shall submit validated test reports and detailed working drawing suitable for site conditions obtained from OEM for approval of AO before placing order. (iii) The all dimensions shown in the tender drawings are to be rechecked and verified at site by the contractor (iii) HPWMS shall be interconnected with Fire detection system (iv) HPWMS shall be tested for satisfactory performance in presence of OEM rep and User rep and necessary arrangements shall be provided by the contractor without extra cost. In addition to OEM recommended tests, testing shall also include functional testing, pressure testing, flowrate testing, system integration testing, SCADA connectivity etc to the satisfaction of user (v) Completion drawings, maintenance schedule with costing duly signed by OEM/contractor all as per site shall be submitted in quadruplicate for future maintenance and record purpose. (vi) Quoted rate shall include the cost of on-site training to users (vii) Contractor shall depute HPWMS engineer as and when requirement arises during the course of Defect Liability Period and rectify complaints to the satisfaction of users without additional cost. |
| 120 | Supply, Installation, Testing & Commissioning of min.2 loop addressable fire alarm Panel having min. 936 character Display with Touch key pad, It sahll have the provision to exapnd theno. of loops ,Inbuilt RS-485 Networking Circuit for peer to peer networking, Inbuilt Port for upload and download the Configuration tools, Modbus over TCP/IP, Two inbuilt NAC\"s,Programmable on board Relays. Power Supply Board which will have SMPS fully protected board, which its operates on 180 to 220V AC ± 10% with 50/60 Hz, battery backup 24V DC with built-in chargebr with 48 Hrs power back up.Approval UL/FM Listed. |
| 121 | Supply, Installation, Testing & Commissioningof Addressable Multi Sensor - Heat Cum Smoke detector with base |
| 122 | Supply, Installation, Testing & Commissioning of Addressable Manual dual action pull Station with back box in suitable enclsoure. |
| 123 | Supply, Installation, Testing & Commissioning of Sounder cum Strobe |
| 124 | Supply, Installation, Testing & Commissioning of Addressable supervised output ControlModule for the sounders with back box in suitable enclosure. |
| 125 | Supply, Installation, Testing & CommissioningAddressable Monitor Module for monitoring the 3rd party NO/NC integartion with back box in suitable enclosure. |
| 126 | Supply, Installation, Testing & Commissioning Addressable Relay Module for the 3rdparty integrationwith back box in suitable enclosure. |
| 127 | Supply, Inatllation, Tetsing & Commissioning of 24VDC Power Supply with 500 mA rating,LED indications for Power supply ON,battery Fail,Battery Charging etc,Shall have inbuilt battery charging circuit. Note:- 230VAC power supply shall be provided throught out the tunnel to power power 230VAC /24VDC adapter. |
| 128 | Supply, Inatllation, Tetsing & Commissioning of Fault isolator Module capable of monitoring shorted loop circuit and automatically restore communications when shorted conditions are corrected - Make: Ravel |
| 129 | Supply, Inatllation and Tetsing 2C x 1.5 Sq. mm, PVC insulated armored copper (Twisted pair) FRLS shielded cable |
| 130 | Supply, Inatllation and Tetsing 2C x 2.5 Sq. mm, PVC insulated armored copper (Twisted pair) FRLS shielded cable |
| 131 | Supply and laying GI cable tray of size 100mm x 50mm with cover complete all as specified and directed. |
| 132 | Supply and fixing E2000 8 APC pigtail-MM Gi 50/125, approx 2.8mm, 5.0m complete all as specified and directed |
| 133 | Notes for Fire Detection and Alarm System : (i) Contractor shall submit detailed working drawing suitable for site conditions duly obtained from OEM for approval of AO before placing order. (ii) The all dimensions shown in the tender drawings are to be rechecked and verified at site by the contractor (ii) HPWMS shall be interconnected with Fire detection system (iii) Fire detection and alarm system shall be tested for satisfactory performance in presence of OEM rep and User rep and necessary arrangements shall be provided by the contractor without extra cost (v) Completion drawings, maintenance schedule with costing duly signed by OEM/contractor all as per site shall be submitted in quadruplicate for future maintenance and record purpose. (vi) Quoted rate shall include the cost of on-site training to users (vii) Contractor shall depute technician as and when requirement arises during the course of Defect Liability Period and rectify complaints to the satisfaction of users without additional cost. |
| 134 | LHD Controller |
| 135 | Supply, Installation, Tetsing and Commissioning of linear heat detector2 channel controlller with OFDR technology having 6Km range per channel consist of 24VDCpower supply unit and the necessary cards for the integration Modbus output to PLC-SCADA panel and necessary relay cards for the inetgration.LHD Controller shall have the following provisions/features:-(a) Communication interfaces: Ethernet (2), USB, RS232(b) 1 mtr sampling interval(c) 1000 free programmable zones per channel(d) built in 10 programmable outputs (potential-free) expandable (For the integration with the water mist sectional valves.(e) Laser product class 1M according DIN EN 60825-1(f) VdS approval as per EN 54-22(g) Communication interfaces LON, TCP/IP, Modbus, RS232, USB(h) Protection class (IEC 60529) IP51.(i) Operating temperature -10 to +60 °CNote:- Controller shall be conisdered in all the aspects of required integrations with Water mist system, PLC/SCADA system and Graphical User interface system. |
| 136 | Fibre optic Sensing cable(Armoured) |
| 137 | Supply, Installation, Tetsing and Commissioning of metal (Armoured) sensor Cable with following specification:-(b) Number of fibres 2(c)Armour (12 steel wires with 0.6 mm diameter)(d) Outer sheath FRNC, black(e) Outer diameter 4.0 mm(f) Operating and storage temperature-25°C to + 85°C(g) Installation temperature-5°C to + 50°C(h) Short term temperature-50°C to + 150°C (max. 60 min.)(i) Flame resistance IEC 60332-1-2(j) Fire load 0.31 MJ/m |
| 138 | Termination Box |
| 139 | Supply, Installation, Tetsing and Commissioning of Termination Box for installation at the end of the sensor cable- for low reflective termination- for multimode fibre GI62.5/125/250μm |
| 140 | Splice Box |
| 141 | Supply, Installation, Tetsing and Commissioning of Splice Box for Sensor Cables (Qty to be considered as per the design and site condition) |
| 142 | GUI |
| 143 | Supply, Installation, Tetsing and Commissioning of Database and Visualisation Software consists with required PC accessories with 2 PC license. Software shall capable of visualization of various data types of DTS systems and other data sources (e.g. temperature profiles, temperature history, zone data, point sensor history) can be shown synchronously in different windows or on multiple screens. DTS, data sources, structures and user-defined enhanced views are listed in a tree-view NAVIGATION window with project folders. Properties of a selected project, DTS, fibre, data source, structure or enhanced view are shown in the PROPERTIES window (name, alarm and failure status, IP address, …). Temperature profiles from several channels can be visualized on a common CHART window. The charts can be scaled and zoomed. Reference curves and curves from the repository can be added for comparison. Zones from all DTS systems within a project can be visualized in a common ZONE VIEW window. Zones can be sequenced according tostatus, temperatures and other criteria in order to show most relevant informationalways on top. The HISTORY window can show the history of temperature data at selected locations and data from point sensors. Temperature data can be visualized in a contour plot showing temperature as false colour over time and location. All windows are updated in real-time. |
| 144 | Hardwere Components:Windows 7 (Service Pack 1 or higher), 64-bit recommended ,Windows 8.1, Windows 10, Windows Server 2008 R2, Windows Server 2012 R2Hardware Requirements: Visualization Client:PC with dual-core processor, 4 GB of RAM memory, 10 GB of free hard disk capacity, 19” or larger screen recommended. DatabaseServer:Server with dual-core processor, 4 GB of RAM memory , 250 GB of free hard disk capacity, RAID 1 or 5 , UPS (uninterruptible power supply). Dynamic Cable Rating: PC with high-end quad-core processor,8 GB or more of RAM memory, 250 GB of free hard disk capacity, RAID 1 or 5 , UPS (uninterruptible power supply). Database Capabilities (performance depending on server hardware): 32 TB maximum Table Size, Connections to multiple DTS and other data sources, Connection to multiple clients (depending on license) , Import, export, clean-up, High availability and data safety with dual database setup. Visualization Capabilities:Tree view navigation for DTS systems, data sources and views, DTS status, Zone data, temperature profiles and history of data, Visualization of structures monitored by multiple DTS, Enhanced views with pictures of installations or maps (option), Languages: English, German, Chinese, Russian, Korean, traditional Chinese, others on request, Systems of units: SI, Imperial units. Input data: DTS temperature data, Point sensor data (e.g. electrical current, ambient temperature, moisture of soil) Advantages: Compliant to IEC standards, Multilayer soil model, Self learning of ambient temperature and thermal resistivity of soil, Models validated by FEM simulation. Results: Conductor temperature over cable position, Dynamic rating of temperature, current and time with constant or variable load. Data Export:Measurement data in *.mex4 format, Enhanced views in EV4 format. ASCII : Writes measurement data to a text file. Data transmission: Fieldbus interface to feed RTTRresults to a SCADA system |
| 145 | Fixtures & Supports |
| 146 | Supply & Installation of required accessories for the cables. |
| 147 | Supply & Installation offloor mounted controller rack with proper ventillation and builtin Fan |
| 148 | Supply and Fixing of PVC clamps for securely fixing a linear heat sensing (LHS) cable with a diameter of 4 mm. The clamps shall be made of high-quality, fire-retardant PVC material, ensuring durability, corrosion resistance, and suitability for fire detection applications. The clamps shall be designed to provide a firm grip while preventing any mechanical damage to the cable. |
| 149 | Notes for Linear Heat Detection : (i) Contractor shall note that Linear heat detection cable system which is capable of detecting a fire along the entire length of the cable rapidly at an early stage shall be provided for identifying \"a location of a fire, alerting and to slart the fire fighting system (HPWMS) should be also integrated with central fire alarm system or control room to give a signal. (ii) The all dimensions shown in the tender drawings are to be rechecked and verified at site by the contractor (ii) Contractor shall submit detailed working drawing duly obtained from OEM for approval of AO before placing order. (ii) HPWMS shall be interconnected with Fire detection system (iii) Linear Heat detection and alarm system shall be tested for satisfactory performance in presence of OEM rep and User rep and necessary arrangements shall be provided by the contractor without extra cost (v) Completion drawings, maintenance schedule with costing duly signed by OEM/contractor all as per site shall be submitted in quadruplicate for future maintenance and record purpose. (vi) Quoted rate shall include the cost of on-site training to users (vii) Contractor shall depute technician as and when requirement arises during the course of Defect Liability Period and rectify complaints to the satisfaction of users without additional cost. |
| 150 | Supply Installation Testing and commissioning of Hydrogen Sulphide Sensor with following features:- |
| 151 | Smart Gas Detector 3 or 4 wire - For GAS LEAKAGE IN AMBIENT MONITORING - Gas to be Detected: Hydrogen Sulphide - Range: 0-100 PPM - Sensor Principle: Electrochemical - Standard Output1.: 4-20mA Output with users settable Range - Output 2.: Three SPDT Relays of rating ‘2A’ - Output 3.: Isolated RS-485 Modbus Communication Programming can be done remote via Fieldbus, 4-20mA rated at 470 ohms load driving capacity Configurable STEL and TWA set points for Toxic Gases - Optional 85 dB Buzzer cum Flasher for local Audio & Visual alarm for immediate indication & evacuation of user inside the area at gas leakage. - Hot Swappable Smart sensor with Calibration memory inside, Sensor - Sensor can be replace on site immediately if require - Common inventory for all different type Gas Detector so reduces the cost - for Projects Smart sensor can be supplied at the time of execution of Project so to prevent life of sensor during idle period. - Highly resistant to poisoning and etching - Automatic Calibration due alert for easy maintenance - Easy handling & programming with 3 Keys on Front. - Password protected programming with changing facility.- Reverse Polarity Protection - Pluggable/Removable Display Card for long maintenance. - Error Detection: During Sensor Break or Open Display ShowsSENSOR OPEN & During Over Range Display Shows OVER RANGE |
| 152 | Supply Voltage: 18 To 36V Dc Typically 24V DC(a) Enclosure Material: Polycarbonate, Grey colour(b) Enclosure: Protection Class: IP-65 (Weatherproof)(c) Sensor Housing: PVC(d) Operating Temperature: -15 to +55 °C(e) Display: 2 Line, 4-Digit 8 mm (H) 7-Segment Display(f) 8 LEDs to Indicate Status of Instrument(g) Cable Entry: 2 x M12 x 1.5 (Pitch)(h) Thermoplastic Cable Gland IP68(i) Dimension: 192 mm (H) with sensor holder x 130 mm (W) with cable gland x 60 mm (D)(j)Mounting: Wall / Stand / Pipe Mounting Along with Basic mounting accessories such as Rawl plug, Self-Thread Screw etc. are included.(k) Weight: Approx. 0.5 kg.(l) Detection Method: Natural Diffusion |
| 153 | Supply Installation Testing and commissioning of Oxygen Sensor with following features:- |
| 154 | Supply Installkation, Tetsing and Commissioning of Repeater Panel for amplification Signal |
| 155 | Supply Installkation, Tetsing and Commissioning of Gas Detector monitoring Panel.having Input : RS-485 Modbus RTU Port(a) Display: 4.3\" LCD display(b) Setting : By touch Screen(c) Output Signal : 4 Relay output rating 2A Failsafe Operation for UNDER / OVER /OPEN Condition of Transmitter(e) Output Signal : Separate RS-485 Modbus RTU Port For Intellirepeater or PC Communication at a time One function is possible(f) Supply Voltage : 190 to 270V AC(h) Protection class : IP 54(i) Cabinet Material :MS Powder Coated compression(j) Mounting : Wall Mounting(k) Weight : Approx.: 30 Kg |
| 156 | Supply Installation Tetsing and coomiisioning of 4C x 1.5 Sq,, multi-stranded armoured shielded FRLS copper cable. |
| 157 | Supply Installation Tetsing and coomiisioning of 3C x 2.5 Sq,, multi-stranded armoured FRLS copper cable. |
| 158 | Supply, Installation, Tetsing and Commissioning of Monitor module and inetgration with Fire alarm system. |
| 159 | Notes for Gas Detection System : (i) Contractor shall note that Gas Detection system should indicate via alarm in case specified levels are exceeded. (ii) Contractor shall submit detailed working drawing suitable for site conditions duly obtained from OEM for approval of AO before placing order. (iii) The all dimensions shown in the tender drawings are to be rechecked and verified at site by the contractor (iv) Gas detection system shall be tested for satisfactory performance in presence of OEM rep and User rep and necessary arrangements shall be provided by the contractor without extra cost (v) Completion drawings, maintenance schedule with costing duly signed by OEM/contractor all as per site shall be submitted in quadruplicate for future maintenance and record purpose. (vi) Quoted rate shall include the cost of on-site training to users (vii) Contractor shall depute technician as and when requirement arises during the course of Defect Liability Period and rectify complaints to the satisfaction of users without additional cost. |
| 160 | EARTH PITS |
| 161 | M&L for Seperate earth pit for the BODY with 100mm dia \"B\" class 2.5 long CI pipe withproviding GI funnel covered with mesh of suitable size enclosed in a CC chamber of 450mm X 450mm X 3mm with suitable reinforced CI cover duly providing staggered holes of 16 nos of 12mm dia to the earth electrode filling salt and charcoal around 150mm from the bottom of the pipe to thebottom of CC chamber. The connections from the electrode through GI strip of 40 X 6mm length provided with suitable size of 14 nos holes with GI washers, nuts, bolts and all labour charges etc., complete. Quoted rate shall include Earth work in any type of soil, Test point made of GI strip and insulators and GI strip 40 x 6mm upto 7.5 RM from earthing electrode, ER value testing, submission of Test certificates etc. ER shall not be more than 2 Ohm. |
| 162 | Supply, Installation, Testing, and Commissioning of a diesel-driven generating set (DG Set), Prime Rated Power with a 415V, 3-phase alternator, capacity of 500 KVA , water-cooled system, including a standard panel, acoustic enclosure, and base frame. The scope includes a relay panel and switchgear for automatic starting upon failure of the mains power, PCC foundation all as per OEM recommendation, Fuel & artificial load for pre-commission testing etc. The control panel shall be soundproof, conforming to latest CPCB norms, as specified and directed. Note : (i) The quoted rate shall include weatherproof shed mounted with GI pipe medium grade columns of diameter 100mm dia-04 Nos, PCC work etc for protection of DG set from rain, sun shine, bird drop etc (ii) Testing of DG set shall be carried out in the presence of rep of Acceptance Officer. Thefuel, lub oil, artificial load etc required for carrying out testing shall be provided by the contractor without extra cost. (iii) Contractor shall submit drawings duly obtained from OEM for the approval of GE. (v) Completion drawings, maintenance schedule with costing duly signed by OEM/contractor all as per site shall be submitted in quadruplicate for future maintenance and record purpose. (vi) Quoted rate shall include the cost of on-site training to users (vii) Contractor shall depute technician as and when requirement arises during the course of Defect Liability Period and rectify complaints to the satisfaction of users without additional cost. |
| 163 | EXTERNAL WARTER SUPPLY |
| 164 | Supply and fix Sluice valve, flange of class 1.6 PN complete, size 150mm dia complete all as specified and directed by Engr-in-charge. |
| 165 | Supply, laying & connect Gl tubing 80 mm dia medium grade in trenches/duct/clamping with Gl fittings and accessories etc and rate deemed including laying,excavation and jointing complete all as specified and directed by Engineer-in-charge. |
| 166 | Supply, laying & connect Gl tubing 150 mm dia medium grade in trenches/duct with Gl fittings and accessories etc and rate deemed including laying,excavation and jointing complete all as specified and directed by Engineer-in-Charge. |
| 167 | M&L for construction of brick masonry valve/hydrant pit of internal size 90 cm x 90 cm x 90 cm depth with mild steel sheet cover of 3 mm thick and MS angle iron frame 50 mm x 50 mm x 6 mm duly painted withtwo coat of synthetic enamel paint over a coat of red oxide primer, including excavation and earth work, 150 mm thick PCC 1:4:8 type D2 as in foundation, brick work in cement mortar, locking arrangement and all inner side of pit shall be plastered with 15 mm thick in cement mortar(1:4) and coping on 1:2:4 type C1 over brick wall complete all as specified and as directed. |
| 168 | Supply and fix non return butterfly valve, flange of class 1.6 PN complete, size 150mm dia complete all as specified and directed by Engr-in-charge |
| 169 | Supply and fix Valve, butterfly conforming to IS 13095, 80 mm dia complete all as specified and directed by Engr-in-charge. |
| 170 | Material & Labour for cutting the existing water main and tapping of 150 mm GI pipe line by using Tee, bend etc compete all as specified and directed by Engineer in Charge. Quoted shall include cost of Tee, any fittings, earth work etc |
| 171 | M&L Joist channel,angle, reduced tee sections, fixed independently, without connecting plates, etc. (cut to ordinary lengths ie. within 20mm of the length indicated of Fe 410-W, Gde E-250), quality A all as specified and as directed. |
| 172 | EXTERNAL ELECTRICAL SUPPLY |
| 173 | Supply, Laying, connecting and testing in cable trenchs/duct and testing of LT Cable XLPE Insulated Screened PVC bedded galvanized strip or wire armoured electric power cables (heavy duty) 1100 Volts grade with stranded alummum conductor of size 300 Sqmm 3.5.core with aluminium terminating lugs all as Specified and directed by Engr-in-Charge (From Existing LT Source upto AMF/ATS PAnel) |
| 174 | Supply & fix x 20 x 3.15 mm Copper strip for earthing on wall ground with insulator bolt nut and washer connection complete all as specified and directed by Engineer |
| 175 | Supply & fix insulated rubber mats in front of Motor Control Center (MCC) of size 1 mx2m x 10 mm complete as specified and directed by Engineer in Charge |
| 176 | LT PANELS OUTDOOR |
| 177 | EB & DG CHANGE OVER & MAIN PCC PANEL FOR HPWMS, GDS. |
| 178 | Panel consisting of the following |
| 179 | AUTOMATIC TRANSFER SWITCH: 800A, 4P,50KA breaking capacity with O/C, S/C, E/F andMicro Processor based Releases -1 Nos(With all Necessary Protection) |
| 180 | Incomers:- |
| 181 | 800A, 4P, ACB of 50KA breaking capacity with O/C, S/C, E/F and Micro Processor based Releases -1 Nos(1DEDICATED). Each consisting of following. 6A, control MCBof C-Curve - 3Nos, Multifunction Meter(MFM) With RS485 communication port -1 No, LED Type R-Y-B Phase Indication Lamps.- (1 set), On,Off & Trip Indications: (1 sets ), 800/5A, CL-1, 15VA, Tape wound CT\"s - 3Nos |
| 182 | Outgoings:- |
| 183 | 630A, 4P, MCCB of 50KA breaking capacity with O/C, S/C, E/F andMicro Processor based Releases-2 Nos(1DEDICATED + 1SPARE). Each consisting of following. 6A, control MCBof C-Curve - 3Nos, Multifunction Meter(MFM) With RS485 communication port -1 No, LED Type R-Y-B Phase Indication Lamps -(1 set), On,Off & Trip Indications: (1 sets ), 630/5A, CL-1, 15VA, Tape wound CT\"s - 3Nos |
| 184 | 160A, 4P, MCCB of 25KA breaking capacity with O/C, S/C andThermal Magnetic based Releases -2 Nos(1DEDICATED + 1SPARE). Each consisting of following. 6A, control MCBof C-Curve - 3Nos, Multifunction Meter(MFM) With RS485 communication port -1 No, LED Type R-Y-B Phase Indication Lamps. - (1 set), On,Off & Trip Indications: (1 sets ), 160/5A, CL-1, 15VA, Tape wound CT\"s - 3Nos |
| 185 | 63A, 4P, MCCB of 25KA breaking capacity with O/C, S/C andThermal Magnetic based Releases -3 Nos(2DEDICATED + 1SPARE). Each consisting of following. 6A, control MCBof C-Curve - 3Nos, Multifunction Meter(MFM) With RS485 communication port -1 No. LED Type R-Y-B Phase Indication Lamps.- (1 set), On,Off & Trip Indications: (1 sets ), 63/5A, CL-1, 15VA, Tape wound CT\"s - 3Nos |
| 186 | Busbar : 415V, 1000A,3Ph, 4wire 50Hz, Aluminium busbars (91E electrical grade) having withstandability symmetrical fault level of 25KA for 1 Sec. - LS (with 50% Neutral) |
| 187 | SPD |
| 188 | This panel shall include Protection at the Main Distribution Board / Sub distribution board or in LT panel of the power supply system.Protection at the Main Distribution Board / Sub distribution board or in LT panel of the power supply system.Class B+C/Class I+II (according to IEC 61643 - 1)(THREE PHASE+ NEUTRAL)(according to IEC 61643 - 1)Pluggable type SPD with potential free contact and thermal disconnector has to be connected between Line and Neutral and SPD of Spark Gap type between Neutral and Earth of following ratings should include base element & pluggable arresters. If required, remote signaling should be provided for remote monitoring purpose.Nominal Voltage, Un -230V, 50/60 Hz,Line to Neutral-MOV with built in thermal fuse,Neutral to Earth-Spark Gap Encapsulated / Non-exhausting,MCOV of 320VNominal current -90 kA (8/20µ sec) - 30 kA each. Voltage protection level <1.4 kV.Protection Modes for : L & N toPE.Maximum Discharge Current Imax per pole-50 kA (8/20µsec) Mounting on -Din railMax. Back-up fuse-Up to 160 amps max. Depending up on panel design & breaking capacity. Approvals: OVEDegree of Protection:IP 20Operating temperature range:-40°C to +85°C Response Time-< 25nano secondsMake: -OBO/legrand/ABB/L&TModel Number- V50 3+ NPE,FS ,BACK UP FUSE NEEDED 160 A, 3PHASE , 4 WIRE SYSTEM DIN RAIL MOUNTED SPDClass B+C/Class I+II Quantity-1No |
| 189 | Notes for LT Panels(i) Panels shall be SCADA compatible (ii) The quoted rate shall include any type of civil work required for proper installation of panels, making good to the existing structure etc. (ii) Contractor shall visit the site with the prior permission from DGNP cell before quoting rates (iii) Contractor shall submit requisite drawings, details, MOC, electrical circuits etc duly obtained from OEMs for the approval of users/accepting officer before procurement. (iv) Completion drawings, test certificates/reports, maintenance manuals, PRBs etc required for proper handing taking with users shall be provided by the contractor without extra cost. |
| 190 | Supply & Laying of Aluminium armoured LT XLPE Cables 1.1KV (Makes : KEI / HAVELLS POLYCAB). |
| 191 | Supplying, laying, testing and commissioning of cables of the following sizes of cables on trays built up trenchesor through GI pipes or clamping to column wall or structure using GI spacers and saddles (at an interval of 300mm for cables of OD up to 25mm and 500mm for the cables) scope shall includes supply of these saddles, hardware and consumables. Cables laid in trays shall be dressed and tied with black nylon ropes in the horizontal portions and clamped using the GI saddles at every 750mm in the vertical portion. What ever cables are laid through GI pipes scopes shall also include sealing the mouth of the GI pipes. Where ever cables are to be laid in built up trenches workshall be includes opening the RCC slabs before laying and replacing them after laying. The work shall be carried out as per the specification and as per the directions of the Engineer-in-charge.NOTE:All Aluminium Cable(Size) complying to IS 7098 Part 1,XLPE insulation,Inner & Outer Sheath complying ST2, Armoured Cable. Quoted rate shall include lugs, glands, nuts, bolts etc |
| 192 | 3.5 Core x 240 Sq.mm Aluminium armouredXLPE Cable |
| 193 | 3.5 Core x 50 Sq.mm Aluminium armoured XLPE Cable |
| 194 | 3.5 Corex35 Sq.mm Aluminium armoured XLPE Cable |
| 195 | EARTH PITS |
| 196 | M&L for Seperate earth pit for the BODY with 100mm dia \"B\" class 2.5 long CI pipe withproviding GI funnel covered with mesh of suitable size enclosed in a CC chamber of 450mm X 450mm X 3mm with suitable reinforced CI cover duly providing staggered holes of 16 nos of 12mm dia to the earth electrode filling salt and charcoal around 150mm from the bottom of the pipe to thebottom of CC chamber. The connections from the electrode through GI strip of 40 X 6mm length provided with suitable size of 14 nos holes with GI washers, nuts, bolts and all labour charges etc., complete. Quoted rate shall include Earth work in any type of soil, Test point made of GI strip and insulators and GI strip 40 x 6mm upto 7.5 RM from earthing electrode, ER value testing, submission of Test certificates etc. ER shall not be more than 2 Ohm. |
| 197 | Note: All Earth Pit Chambers need to be Constructed with 100mm Solid Blocks. All Earth Pit Chambers to be Numbered and Painted with Reputed make Paint. |
| 198 | Subtotal |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
| 5 | Click here to download tender document | Tender Documents |
| 6 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail