| 1 | Provision for providing MS grill mess above open pits (with MS angle 40 x 40 x 4 mm frame, MS Flat 32 x 3 mm for middle support and MS square bar of 10 x 10 mm in between frame) above the open pits for safety of visitors including Priming, painting, all material, fabrication, labor, transportation charge etc. all complete as directed by site in-charge. |
| 2 | Provision for dismantling totally broken wooden railings above cave and removing the wooden waste from protected monument up to 50 mtr including all labors, transportation charges etc. all complete as directed by site in-charge. |
| 3 | Provision for providing and fixing MS hand rails(MS pipe of 40mm dia fixed in PCC 1:2:4) in place of wooden hand rails around the openings of the cave for safety of visitors ( including painting after applying priming coat) including all material, labors, transportation ,T&Ps etc. all complete as directed by site in-charge. |
| 4 | Provision for providing and fixing MS ramp 25.5 x 1.5 m ( MS Box Pipe 120x120x5 for vertical column , ISMC100 for longitudinal horizontal support , MS angle 50x50x5 for transverse horizontal support at every 1 m and longitudinal support at Centre of ramp, cover ramp with MS checker plate after providing 50mm thick wooden plank and MS hand railing with 40 mm pipe( two horizontal and 1 vertical support at every 1.5m )) for entrance of visitors in the cave including all labor, materials, transportation, T&Ps etc. all complete as directed by site in-charge. |
| 5 | Provision for providing and fixing concertina wire (600MM dia , 2.5 mm core wire) above boundary wall with Y shape angle frame (MS 40x40x3) to prevent from illegal entry of local drinkers from backside of the monument including all labor, materials, fabrication, transportation, T&Ps etc. all complete as directed by site in-charge. |
| 6 | Provision for shifting of Ticket cabin from right side of gate to the left side of gate including Preparation of PCC base for cabin and removing old PCC base of cabin including all labor charges etc. all complete. |
| 7 | Provision for dismantling of cracked boundary wall and throwing debris outside the monument up to 50m including all labor, T&Ps and transportation charges etc. all complete. |
| 8 | Provision for construction of CR masonry on boundary wall including all material, labor and transportation charges etc. all complete |
| 9 | Provision for changing of name from Vadodara circle to Rajkot Circle in All PNB\"s and CNB\"s including all required material, labor charges etc. all complete |
| 10 | Providing, fixing and removal of scaffoldings for execution of works including all material, labor and transportation charges etc. all complete. |
| 11 | Provision for the cleaning of monument after completion of work. |
| 12 | Provision for providing PVC wooden finish flooring inside the caves for free movement of visitors as there is very uneven surface including all material, labor, fixing, transportation charges etc. all complete. |