Earth work excavation in foundation hard soil including moorum, stoney earth mixed with boulders with all leads and lifts including dressing and levelling the bed and depositing the excavated earth away from the work site with all leads and lifts including cost of all labour and T&P and cess required for the work and etc. complete in all respect and as per the direction by the Engineer-in-charge.
2
Supplying, filling in foundation and plinth with sand in layers well watered and rammed including cost, conveyance, royalty of all the materials required for the work labour with T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge.
3
Cement Concrete of proportion(1:4:8) in foundation and plinth using 4cm size clean hard black granite metal of approved quality from approved quarry including hoisting, lowering and laying in layers not exceeding 15cm thick to the required level, ramming watering and curing etc.complete including cost, conveyance, royalty taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge.
4
Cement concrete of proportion (1:2:4) using 12mm size hard granite chips of approved quality from approved quarry including hoisting, lowering and laying concrete and compacting in layers not exceeding 15cm thick with proper packing and ramming each layer of concrete by means of vibrator including watering and curing etc.complete including cost, conveyance, royalty taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge.
5
Supplying, fabrication, fitting, fixing,& erection of M.S truss & purlin including all cost, conveyance and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge.
6
Painting 2 coat with approved paint on new wood work or iron work and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge.
7
Cost supplying and labour for fixing of anticorrosive zinc aluminium alloy painted coloured steel roofing profile sheet of 0.45mm thick in roof of godown including fixing a ridge cape with fasteners of approved specification etc. complete but excluding cost of fasteners including drilling holes etc. complete as directed by Engineer-in-Charge Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.