| 1 | Supply and fixing of Fire Hose Reel Nozzle made of Stainless Steel, shut-off type, suitable for 20 mm hose reel, complete with threading, coupling and washers, including connection to existing hose and testing, including buyback of dismantled hose reel nozzle as directed by the Engineer-in-Charge. |
| 2 | Supply and fixing of Fire Hose Reel Clip made of M.S. or suitable corrosion-resistant material, suitable for 20 mm/25 mm hose reel, for securing fire hose on the reel, complete as per specifications and as directed by the Engineer-in-Charge. |
| 3 | Supply, installation, and fixing of Fire Hose Reel Main Ball Valve (Brass) of suitable size for 25 mm hose reel, including necessary G.I. fittings, connections to riser, washers, nuts, and testing for leak-proof operation, and buyback of the old ball valve, complete as per IS:884 and as directed by the Engineer-in-Charge. |
| 4 | Supply, installation, and fixing of Two-Way Wheel Valve (Stainless Steel) of required size, including connections to piping with necessary G.I. fittings, washers, nuts, and leak-proof testing, complete as per IS:778/IS:5312 and as directed by the Engineer-in-Charge. |
| 5 | Supply and fixing of Fire Hose Pipe of 63 mm diameter, made of thermoplastic/reinforced rubber material suitable for fire-fighting, complete with coupling ends, washers, and connection to hose reel or hydrant outlet, including testing for leak-proof operation, and buyback of old hose reel assembly, all as directed by the Engineer-in-Charge. |
| 6 | Supply and replacement of spindle with handwheel for 63 mm fire landing valve, including removal of old unserviceable parts, buyback of retrieved spindle/wheel assembly, fixing of new compatible parts, and testing for smooth operation and leak-tight shut-off, all complete as directed by the Engineer-in-Charge. |
| 7 | Servicing of Fire Hose Cabinet including cleaning, tightening and alignment of hinges, repair or replacement of damaged glass/acrylic sheet, replacement/repair of lock and handle, straightening of door/gate if bent, touch-up or full painting of enclosure with approved fire-red paint, and minor repairs as required, complete in all respects as directed by Engineer-in-Charge. |
| 8 | Servicing of Fire Hose Box including cleaning, tightening and alignment of hinges, repair or replacement of damaged glass/acrylic sheet, replacement/repair of lock and handle, straightening of door/gate if bent, touch-up or full painting of enclosure with approved fire-red paint, and minor repairs as required, complete in all respects as directed by Engineer-in-Charge. |
| 9 | Supply, installation, testing and commissioning of Fire Hose Reel Drum made of heavy-duty M.S. sheet, wall-mounted type, complete with side brackets, hub, swing arm/rotating mechanism, and suitable for 20 mm/25 mm hose pipe, including supply and fixing of new hose reel pipe with coupling and nozzle, fixing with anchors/fasteners, making connections to the riser with required G.I. fittings, testing, and including buyback of the old hose reel drum and pipe assembly, all complete as per IS:884 and as directed by the Engineer-in-Charge. |
| 10 | Supply and fixing of Fire Hose Reel Elbow of size suitable for 20 mm/25 mm and material (GI), 90° or 45° as required, including connection to hose reel and riser with necessary fittings, washers, nuts, and making the joint leak-proof, complete as directed by the Engineer-in-Charge. |
| 11 | Supply, installation and fixing of Butterfly Valve of following sizes in the existing fire-fighting pipeline, including necessary cutting, threading, jointing materials, alignment, restoration of pipeline, testing for leak-proof operation, construction of a brick masonry chamber with plastering and proper access for valve operation (if required), and buyback of the old valve assembly, all as directed by the Engineer-in-Charge. |
| 12 | 200 mm dia. |
| 13 | 150 mm dia. |
| 14 | 100 mm dia. |
| 15 | 80 mm dia. |
| 16 | Supply, detection of location, installation and fixing of non-return valve (NRV) of of following sizes in the existing fire-fighting pipeline, including necessary cutting, threading, jointing materials, alignment, restoration of pipeline, testing for leak-proof operation, construction of a brick masonry chamber with plastering and proper access for valve operation (if required), and buyback of the old valve assembly, all as directed by the Engineer-in-Charge. |
| 17 | 200 mm dia. |
| 18 | 150 mm dia. |
| 19 | Supply, detection of location, installation and fixing of ball valve of of following sizes in the existing fire-fighting pipeline, including necessary cutting, threading, jointing materials, alignment, restoration of pipeline, testing for leak-proof operation, construction of a brick masonry chamber with plastering and proper access for valve operation (if required), and buyback of the old valve assembly, all as directed by the Engineer-in-Charge. |
| 20 | 25 mm dia. |
| 21 | SITC of Single Stage Centrifugal Pump for Fire Fighting duty of 12.5 HP capacity, coupled with 3-phase squirrel cage induction motor, suitable for required head and discharge as per site requirement, complete with base frame, flexible coupling, coupling guard, foundation bolts, anti-vibration pads, alignment, suction & delivery connections, pressure gauge, isolation valves, all necessary cabling and earthing, and complete with DOL starter control panel including MCCB, contactor, overload relay, push buttons, indication lamps, protection interlocks, wiring, termination, testing and commissioning, complete in all respects as per relevant IS / NFPA standards and buyback of the old pump assembly, all as directed by the Engineer-in-Charge. |
| 22 | Supplying, installation, testing and commissioning of fire sprinkler, bulb type, suitable for automatic operation at rated temperature (usually 68°C or as specified), made of brass body with chrome-plated finish, having standard orifice, pressure rating up to 12 bar, UL/FM approved, complete with necessary accessories and connections as required for proper installation and operation. |
| 23 | Supply, installation, and fixing of Auto Air Release Valve of required size and material (SS) for fire protection piping, including necessary flanges, gaskets, fasteners, and connection to the fire line, ensuring proper venting of trapped air and leak-proof operation, complete as directed by the Engineer-in-Charge. |
| 24 | One-time comprehensive servicing of 12.5 HP Fire Pump, including inspection of pump and motor, cleaning of strainers, tightening of couplings and foundation bolts, lubrication of bearings, checking alignment, checking and cleaning of suction/discharge lines, testing of electrical connections, replacement of consumables (like gland packing, grease, fasteners, etc.), replacement of parts (seal, bearings, coupling, etc.), functional testing after service, complete in all respects as directed by the Engineer-in-Charge. |
| 25 | One-time comprehensive servicing of 12.5 HP Fire Jockey Pump, including inspection of pump and motor, cleaning of strainers, tightening of couplings and foundation bolts, lubrication of bearings, checking alignment, checking and cleaning of suction/discharge lines, testing of electrical connections, replacement of consumables (like gland packing, grease, fasteners, etc.), replacement of parts (seal, bearings, coupling, etc.), functional testing after service, complete in all respects as directed by the Engineer-in-Charge. |
| 26 | One-time comprehensive servicing of 125 HP Fire Pump, including inspection of pump and motor, cleaning of strainers, tightening of couplings and foundation bolts, lubrication of bearings, checking alignment, checking and cleaning of suction/discharge lines, testing of electrical connections, replacement of consumables (like gland packing, grease, fasteners, etc.), replacement of parts (seal, bearings, coupling, etc.), functional testing after service, complete in all respects as directed by the Engineer-in-Charge. |
| 27 | Excavation by mechanical means and backfilling of ground for detection of leakage in underground fire-fighting pipeline, including careful removal of soil, shoring/support as required, exposure of pipe, identification of leakage point, refilling with excavated soil, compaction, and reinstatement of surface to original condition, all complete as directed by the Engineer-in-Charge. |
| 28 | Leakage testing of main fire hydrant/sprinkler line of following size including filling with water, pressurizing to the 1.5 times the working pressure of the system or 10.5 kg/cm² whichever is higher, as per NBC/IS 10221:1982 & IS 3844:2017/ NFPA standards, checking for leaks at joints, valves, fittings, and supports as required. |
| 29 | 25 mm dia. - 50 mm dia. |
| 30 | 65 mm dia. - 100 mm dia. |
| 31 | 125 mm dia. - 200 mm dia. |
| 32 | Repairing of existing fire hydrant / sprinkler pipeline of following size by welding, replacement of damaged portion, or by any other suitable method as required at site, including necessary cutting, threading, jointing materials, alignment, and restoration of pipeline to original condition, complete in all respects as directed by Engineer-in-Charge. |
| 33 | 25 mm dia. - 50 mm dia. |
| 34 | 65 mm dia. - 100 mm dia. |
| 35 | 125 mm dia. - 200 mm dia. |
| 36 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes of 50 mm outer diameter, SDR-11 / Schedule-80, including all CPVC fittings (elbows, tees, reducers, unions, etc.), cutting, jointing with approved solvent cement, fixing with clamps/supports at required intervals, testing of joints for leakage and making good the damages complete as per direction of Engineer-in-Charge. |