|
| 1 | (UPS Room - Item Sl. No. 1 to 6)Supply, installation, testing and commissioning of 120.0 Litres PESO approved Seamless Cylinder, complete with VdS & LPCB Approved valve assembly and a safety cap. The work shall include complete job execution as per the site requirements and directions of the Engineer-in-Charge. |
| 2 | Supply, installation, testing and commissioning of UL / FM Approved FK-5-1-12 Fire Extinguishing Clean Agent, Clean agent should be filled in an PESO approved filling station. |
| 3 | Supplying and installing accessories for the master cylinder, including all necessary fittings, supports, and safety accessories, complete in all respects. The work shall ensure proper alignment, secure mounting, and testing as per the directions of the Engineer-in-Charge, and shall include providing and fixing an electromagnetic release device (24V DC) – 1 No., manual release device – 1 No., flexible discharge hose – 1 No., cylinder strap – 2 Nos., warning sign/plate “DO NOT ENTER” – 1 No., and warning sign/plate “KEEP DOOR CLOSED” – 1 No. |
| 4 | Providing and completing the work of Discharge Nozzles -360 degree, in accordance with approved standards and as directed by the Engineer-in-Charge. |
| 5 | Complete job for supply, installation, testing, and commissioning of the Fire Detection & Alarm System, including all necessary materials, accessories, and interconnections to ensure smooth and reliable operation, comprising a 2-zone gas release panel with battery backup – 1 No., manual release switch – 1 No., abort switch – 1 No., multisensor detector with base – 4 Nos., sounder-cum-strobe – 1 No., and 2C × 1.5 sq.mm copper armoured control/power cable of 1100-volt grade – 60 m. |
| 6 | Providing and completing the work of piping and installation in accordance with approved standards and as directed by the Engineer-in-Charge |
| 7 | C.S./M.S. seamless piping with forged screwed/socket-weld fittings up to 50 NB, including M.S. supports such as angles, channels, plates, clamps, etc., all conforming to ASTM A-106, Schedule 40. |
| 8 | Complete job for supply, installation, testing, and commissioning of Installation, Testing & Commissiong of above System, along with necessary materials, accessories, and interconnections to ensure smooth and reliable operation. |
| 9 | (IT Server Room - Item Sl. No. 7 to 12)Supply, installation, testing and commissioning of 120.0 Litres PESO approved Seamless Cylinder, complete with VdS & LPCB Approved valve assembly and a safety cap.. The work shall include complete job execution as per the site requirements and directions of the Engineer-in-Charge. |
| 10 | Supply, installation, testing and commissioning of UL / FM Approved FK-5-1-12 Fire Extinguishing Clean Agent, Clean agent should be filled in an PESO approved filling station. |
| 11 | Supplying and installing accessories for the master cylinder, including all necessary fittings, supports, and safety accessories, complete in all respects. The work shall ensure proper alignment, secure mounting, and testing as per the directions of the Engineer-in-Charge, and shall include an electromagnetic release device (24V DC) – 1 No., manual release device – 1 No., flexible discharge hose – 1 No., cylinder strap – 2 Nos., warning sign/plate “DO NOT ENTER” – 1 No., and warning sign/plate “KEEP DOOR CLOSED” – 1 No. |
| 12 | Providing and completing the work of Discharge Nozzles -360 degree, in accordance with approved standards and as directed by the Engineer-in-Charge. |
| 13 | Complete job for supply, installation, testing, and commissioning of the Fire Detection & Alarm System, including all necessary materials, accessories, and interconnections to ensure smooth and reliable operation, comprising a 2-zone gas release panel with battery backup – 1 No., manual release switch – 1 No., abort switch – 1 No., multisensor detector with base – 4 Nos., sounder-cum-strobe – 1 No., and 2C × 1.5 sq.mm copper armoured control/power cable of 1100-volt grade – 60 m. |
| 14 | Providing and completing the work of piping and installation in accordance with approved standards and as directed by the Engineer-in-Charge |
| 15 | C.S./M.S. seamless piping with forged screwed or socket-weld fittings up to 50 NB, including M.S. supports such as angles, channels, plates, clamps, etc., all conforming to ASTM A-106, Schedule 40. |
| 16 | Complete job for supply, installation, testing, and commissioning of Installation, Testing & Commissiong of above System, along with necessary materials, accessories, and interconnections to ensure smooth and reliable operation. |
| 17 | (Fire Door - Item Sl. No. 13)Supply of 48 mm thick door shutter of 120 min fire rated, fabricated with 2 nos of 1mm thick glavanized steel sheet sandwiching honeycomb materials in between.Door frame are manufactured with galvanized steel sheet pressed to form double rebate profile of size 143X60 mm. The frame and shutter are finished with Powder coated.(Shutter and frame - 1.2 and 1.2 mm) |
| 18 | Size : 1000 x 2400 -( 1X 2.4 ) |
| 19 | Panic Bar (Single Leaf) |
| 20 | Panic Bar (Double Leaf) |
| 21 | Size : 2000 x 2400 -Double Leaf( 2X 2.4) |
| 22 | Panic Trim (Double Leaf) |
| 23 | 202 grade SS ball bearing hinges (100X75X3 mm) |
| 24 | Fire rated door closer (Standard arm) |
| 25 | 120 min fire rated cleared wired glass (200 x 300 x 6 mm) |
| 26 | D Type Door handle |
| 27 | Tower Bolt |
| 28 | Fastener |
| 29 | Installation |