| 1 | Dismantling and reconnecting three phase service connection from the OH line incl.lowering down the WP portion |
| 2 | Dismantling 2 Line Spacer from existing OH line |
| 3 | Dismantling 3 Line Spacer from existing OH line |
| 4 | Insertion of one LT PSC pole in existing three phase OH line including digging & back filling pit in ordinary soil, fitting cross arm, insulator, binding etc. excluding transportation of poles. |
| 5 | Loading LT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 6 | Fitting of one No. pole top service connection box of standard size (up to 4 way) using ss strap/B&N of suitable size in to the PSC/A poles at the standard height excluding giving connections |
| 7 | Fitting one additional Fuse unit and giving connection from Transformer to fuse and Distribution box to LT OH line. |
| 8 | Dismantling and reconnecting single phase service connection from the OH line incl. lowering down the WP portion. |
| 9 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading. |
| 10 | Renewal of existing damaged/old LT PSC/RCC (three phase line) pole with new PSC pole in place and refitting of all items incl. Conveyance (except pole). |
| 11 | Renewal of existing damaged/old LT TW/RSJ/Rail (three phase line) pole with new PSC pole in place and refitting of all items incl. Conveyance (except pole). |
| 12 | Renewal of existing damaged/old LT PSC/RCC (single phase line) pole with new PSC pole in place and refitting of all items incl. Conveyance (except pole). |
| 13 | Insertion of one LT PSC pole in existing single phase OH line including digging & back filling pit , fitting cross arm, insulator, binding etc. |
| 14 | Renewal of existing damaged/old LT Strut with new PSC strut in place and refitting of all items incl. Conveyance (except pole). |
| 15 | Straightening one slanted LT pole after unbinding the line and rebinding the line after work. |
| 16 | Erecting one LT PSC Pole in position including digging & back filling pit . |
| 17 | Providing Stay for LT poles including digging & back filling pit. |
| 18 | Renewal of existing damaged/old LT stay with new stay in place and refitting of all items and conveyance of all materials. |
| 19 | Providing one Coil Earth using GI-earth wire , digging separate pit at standard distance away from the pole/structure & backfilling. |
| 20 | Installing One No. Insulation piercing connector of size Main :16 to 95 ,Tap:1.5 to 16 Sq.mm |
| 21 | Installation of Insulation piercing connector for main to service line main :16-95 sqmm, Tap 16-95 sqmm |
| 22 | Installing One No. 4 way Satellite Connector of size Main :16 to 95, Tap:4 to 35 Sq.mm to the LT AB cable of Standard size |
| 23 | Transporting LT ABC by hired vehicle to a distance up to 5 km and carring up to 2 drum including loading and un loading using crane |
| 24 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 25 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 26 | Providing Cable Tie |
| 27 | Providing End Caps |
| 28 | Erection of suspension clamp for LT ABC of any size |
| 29 | Installation of Pre-insulated straight through joints for 16sqmm cable |
| 30 | Installation of Pre-insulated straight through joints for 70sqmm cable |
| 31 | Dismantling (without damage) one km LT three phase 4 wire OH line ,cross arms, insulators and stacking the conductors in rolls . |
| 32 | Dismantling (without damage) one km LT additional conductor line , cross arms, insulators and stacking the conductors in rolls. |
| 33 | Dismantling (without damage) one km LT single phase 2 wire OH line , cross arms, insulators and stacking the conductors in rolls . |
| 34 | Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 35 | Dismantling (withoutdamage) one km 11kV line (3 conductors), cross arm, insulators, disc, rolling the conductor and stacking. |
| 36 | Insertion of one HT PSC pole in existing line incl. digging & backfilling pit, fitting cross arm, insulators, binding etc. |
| 37 | Cutting trees beyond 60cm but upto and incl. 120cm girth, cutting of trunks/branches, removing the root completely and stacking. |
| 38 | Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit. |
| 39 | Fitting one set AB switch and giving connection |
| 40 | Fitting one Additional2.4m/3m Channel cross arm (75x40x6mm), in existing 11kV DP incl. conveyance of materials. |
| 41 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. Please Enable Macros to View BoQ information |