| 1 | Supply and refill NOVEC 1230 gas (70 kg)/ 100 Kg (min) capacity cylinder for gas suppression systemincluding testing and calibration of cylinder, actuators and safety relief valve complete all as specified and directedMAKE : - SIEMENSNote :- The scope of work shall be included as follows(a) Transportation to factory and return back to site including packing charges (b)Disconnecting and refixing of Cylinder(c)Refilling of Novac gas 1230 gas from authorised service agency.(d) Cylinder valve leak testing(e) Hydrostatic testing (f)Calibration of cylinder and safety relief valve.(g) Calibration/testing certificates to be provided at no extra cost to the department.(h) The same to be simulate with the existing system.Any other functionality test CCOE/ (PESO) APPROVAL Certificate required for the fitness of cylinder is also to be the part of job |
| 2 | Hydrostatictest of NOVEC 1230 gas (70 kG)/ (100 kg) (min) capacity cylinder including testing and calibration of cylinder, actuators and safety relief valve complete all as specified and directedMAKE :- SIEMENSNote :- The scope of work shall be included as follows:(a) Transportation including wooden packing charges (b)Removing the gas from gas cylinder and refill the same after completion of the following tests.(i) Cylinder hydraulic pressure test (ii) Hydrostatic stretch test(iii) Air leakage test(iv)Any other functionality test CCOE/ (PESO) APPROVAL Certificate required for the fitness of cylinder is also to be the part of job(c) Reqd gas for topup during the job is included in the job.(d) If the cylinder found unserviceable during the test the cost of cylinder will be paid in seperately. |
| 3 | Supply only NOVEC 1230gas for top up the gas cylinder complete all as specified and directed |
| 4 | Supply only 140 ltr capacity empty gas cylinder complete all as specified and directed |
| 5 | Supply and fix in repairmaster cylinder/standby valve assembly consist of Electromagnetic actuator, discharge hose, pneumatic actuator complete all as specified and directed |
| 6 | Material and labour for paintingpainting of fire hose cabinet boxbytwo coat of synthetic enamelled paint of existing red colour after scrubbing and cleaning making the surface ready to paintand complete all as specified and directed |
| 7 | All as per item No 6 here in before, but painting of fire hydrant/hose reel drum with bracket complete all as specified and directed |
| 8 | All as per item No 6 here in above, but painting of fire fighting system pipe line of size complete all as specified and directed |
| 9 | (a) 80 mm dia |
| 10 | (b) 100 mm dia |
| 11 | Supply and fix in repair addressable type multi sensor detector with smokeand heat combination complete all as specified and directed |
| 12 | Supply and fix in repair addressable manual call point resettable type complete all as specified and directed |
| 13 | Supply and fix in repair 12 V 7/12AH battery complete all as specified and directed |
| 14 | Supply and fix in repairflexible discharge hose complete all as specified and directed |
| 15 | Supply and fix in repairflexible actuation hose complete all as specified and directed |
| 16 | Supply and fix in repair manual cum pneumatic actuator complete all as specified and directed |
| 17 | Supply and fix in repairpressure gauge 40 bar complete all as specified and directed |
| 18 | Supply and fix in repairphoto electric type smoke detectors with mounting base complete all as specified and directed |
| 19 | Supply and fix in repairheat detectors with mounting base complete all as specified and directed |
| 20 | Supply and fix in repair manual release switch complete all as specified and directed |
| 21 | Supply and fix in repairabort swtich complete all as specified and directed |
| 22 | Supply and fix in repairburst disc complete all as specified and directed |