| 1 | ATA maintenance works in NPOS area 2026, FACT-CD, Ambalamedu. |
| 2 | Labour assistance for LT motor maintenance during ATA: The scope of work includes labour assistance for carrying out LT motor maintenance works, consisting of thorough cleaning of motor cooling fins and fan, opening of terminal box, motor health assessment as per the preventive maintenance checklist, repairing of any damaged terminations and refixing terminal covers. |
| 3 | Labour assistance for LT motor feeder module servicing during ATA: The scope of work includes labour assistance for carrying out LT motor feeder module works, consisting of thorough cleaning of the LT MCC module & switchgears, module health assessment as per the preventive maintenance checklist and repairing/replacing any damaged terminations or switchgears. |
| 4 | Labour assistance for HT motor maintenance during ATA: The scope of work includes labour assistance for carrying out HT motor maintenance works, consisting of through cleaning of motor coolers and fan, opening of terminal box, motor health assessment as per the preventive maintenance checklist, repairing of any damaged terminations and refixing terminal covers. |
| 5 | Labour assistance for HT motor panel maintenance during ATA: The scope of work includes labour assistance for carrying out HT motor panel works, consisting of Panel and Circuit breaker health assessment as per the preventive maintenance checklist and repairing/replacing any damaged terminations or switchgears. |
| 6 | Labour assistance for transformer maintenance during ATA: The scope of work includes labour assistance for carrying out transformer maintenance works, consisting of thorough cleaning of transformer, opening of terminal box, transformer health assessment as per the preventive maintenance checklist, topping up of transformer oil if necessary, repairing of any damaged terminations, refixing terminal covers and treating/changing of Silica gel if necessary. |
| 7 | Labour assistance for transformer panel maintenance during ATA: The scope of work includes labour assistance for carrying out transformer panel maintenance works, consisting of Panel and Circuit breaker health assessment as per the preventive maintenance checklist and repairing/replacing any damaged terminations or switchgears. |
| 8 | Labour assistance for HT panel maintenance during ATA: The scope of work includes labour assistance for carrying out HT panel maintenance works, consisting of inspection andcleaning of11 kV, 3.3 kV panel sections and Circuit breakerslocatedin Substations such as Central substations,NP Plant, Barge, Bulk and Ammonia handling plant under the supervision and guidance of FACT staff,opening the panel covers, through cleaning, tightness checking of electrical connections, fixing back the covers and servicing of breakers, testing of control circuits/relays and otherassociated electrical works. |
| 9 | Labour assistance for LT MCC/PMCC sections maintenance during ATA: The scope of work includes labour assistance for carrying out LT MCC/PMCC sectionmaintenance works, consisting of inspection, repair andcleaning ofLT panel single vertical section locatedin Substations such as NP Plant, Barge, Bulk, Ammonia handling plant and in bagging plantunder the supervision and guidance of FACT staff, opening the panel covers, through cleaning, tightness checking of electrical connections, fixing back the covers and servicing of breakers, testing of control circuits/relays and otherassociated electrical works. |
| 10 | Labour assistance for LT busduct maintenance during ATA: The scope of work includes labour assistance for carrying out LT busduct maintenance works, consisting of removal of 1.5/2 MVA transformer secondary side busduct sheet, through cleaning of LT busbars and busbar supporting insulators and re-fixing busduct sheets. |
| 11 | Labour assistance for conveyor maintenance during ATA: The scope of work includes labour assistance for carrying out conveyor maintenance works, consisting of cleaning,lubricating and servicing of pull chord switches, belt sway switches and zero speed switchesof NP product, RM conveyors and checking the operation of interlocks. |
| 12 | Labour assistance for capacitor bank maintenance during ATA:The scope of work includes labour assistance for carrying out capacitor bank maintenance works, consisting of cleaning of the bushings of HT capacitors, RVT, reactors, cable end terminations, bus supporters etc. and treating/changing of reactor breather silica gel. |
| 13 | Supply of Banian cloth: The scope of work includes supply of White colour, 300mm wide, 2 ply, banian cloth. The minimum length of single peiece of cloth shall be 1 meter. |
| 14 | Supply of 20mm brush: The scope of work includes supply of good quality painting brush, double thick with white bristles of size 20mm |
| 15 | Supply of 50mm brush: The scope of work includes supply of good quality painting brush, double thick with white bristles of size 50mm |
| 16 | Supply of 75mm brush: The scope of work includes supply of good quality painting brush, double thick with white bristles of size 75mm |
| 17 | Supply of coir brush: The scope of work includes supply of coir brush for cleaning, size 10 inch, fibre length 3-4 inch. |