|
| 1 | Dimantling doors or windos including chaukhats but excluding hold fast and including stacking of material as direction by the engineer - in - charge a distance of 60 metre |
| 2 | Anodised aluminium (anodised transpart or dyed to required shade according to is 1868minimum anodic coating of grade ac 15 |
| 3 | power coated aluminium (minimum thickness of power coating 50 micron ) dsr 21.1.1.2 |
| 4 | pre -laminated particles board with decorative laminations on both side dsr 21.2.2 |
| 5 | wiring point for lights etc All complete. |
| 6 | wiring point for plugs All complete. |
| 7 | Supply and wiring of submain with two number of 2.5 sqmm copper conductor cable all complete . |
| 8 | DESIGNING fabricating testing installing and fixing in position curtain wall with aluminium composite panel cladding with open grooves linear as well as curvlinears portion of the building for all height and all levels etc in complete possition . |
| 9 | Steel work in built up tubular (round squre or rectangular hollow tubes etc ) trusses etc including cutting hoisting fixing in possition and applying a priming coat of approved steel primer including welding and bolted with special shaped washers etc in complete/ possition |
| 10 | Dismentling Of Old CC Road With Base Concrete(s.i-697) |
| 11 | Disposal of old cc road matrial from site in comp./possition . |
| 12 | Contruction of granular sub- base by providing well graded material spreading in uniform layers with motor grader on prepared surface ,mixing by mix in place method with rotavtor at OMC,and compacting with smooth wheel roller to achieve the desired drnsity ,as per MORD,specification 401 |
| 13 | Contruction of un-reinforced,dowel jointed at expansion and contruction joint only ,plain cement concrete pavement ,thickness as per design ,over a prepared sub-base with 43 grade cement @400kg per cum ,coarse and fine aggregates confirming to IS 383 maxium size of coarse aggregates not exceeding 25mm,mixed in abatching and mixing plant as per approvedmix design transported to site laid with a fixed form or slip from paver , spread ,compacted and finished in a continous opration including provision of contruction ,expension contruction and longitudinaten joints ,joint filler ,separatio membrane ,sealant primer ,joint sealent ,debonding strip,dowel bar ,tie rod ,admixtures as approved ,curing compound ,finishing to line and grade as per drawing including 14 days curing in comp .position (new item8 (1) |
| 14 | s/fixing sign board at site in comp .position Please Enable Macros to View BoQ information |